CSSGB key terms
CSSGB · Get comfortable with the vocabulary.
- Six Sigma
- Related: DMAIC, Y = f(x), Cost of poor quality (COPQ)
A disciplined, data-driven approach to reducing variation and defects in processes, aiming for no more than 3.4 defects per million opportunities while improving customer satisfaction and business results.
- DMAIC
- Related: Project charter, Control plan, Y = f(x)
The five-phase improvement cycle - Define, Measure, Analyze, Improve, Control - used to fix an existing process that is not meeting customer requirements or performance targets.
- Cost of poor quality (COPQ)
- Related: Hidden factory, Lean
The money an organization loses because work is not done right the first time, including scrap, rework, warranty, inspection, and complaint handling; often hidden and far larger than expected.
- Lean
- Related: Hidden factory, Kaizen
A set of principles and tools aimed at removing waste - anything that does not add value for the customer - while shortening lead time and improving the flow of work.
- Hidden factory
- Related: Cost of poor quality (COPQ), Rolled throughput yield (RTY)
The unreported extra work created by defects, such as rework, retesting, expediting, and extra inspections, which consumes capacity and cost without appearing in standard process metrics.
- Y = f(x)
- Related: Design of experiments (DOE), Critical to quality (CTQ)
A shorthand model stating that the output result (Y) is determined by a set of input process variables (x); improvement comes from finding and controlling the vital few x's.
- Project charter
- Related: SIPOC, Voice of the customer (VOC), Stakeholder analysis
A formal document that authorizes a Six Sigma project by stating the problem, goal, scope, business case, team, schedule, and expected benefits, and that must be approved by the project sponsor.
- SIPOC
- Related: Project charter, Operational definition
A high-level map showing the Suppliers, Inputs, Process steps, Outputs, and Customers of a process, used to agree on scope and boundaries before detailed analysis begins.
- Voice of the customer (VOC)
- Related: Critical to quality (CTQ), Kano model
The collected needs, expectations, and complaints of customers, gathered through interviews, surveys, and complaint data, that define what the process must deliver.
- Critical to quality (CTQ)
- Related: Voice of the customer (VOC), Operational definition
A measurable characteristic of a product or service that matters most to customers and must be met; CTQs translate vague customer wants into specific, testable requirements.
- Kano model
- Related: Voice of the customer (VOC), Critical to quality (CTQ)
A way of classifying customer requirements into basic (must-have), performance (more is better), and delighter (unexpected) categories so improvement effort is spent where it pays off.
- Stakeholder analysis
- Related: Project charter
Identifying everyone who affects or is affected by a project, then assessing their influence and interest so a communication and buy-in plan can be built.
- Operational definition
- Related: Measurement system analysis (MSA), Critical to quality (CTQ)
A precise, agreed description of what a characteristic is and exactly how it is measured, so that different people measuring the same item get consistent results.
- Measurement system analysis (MSA)
- Related: Gage R&R, Attribute data
A study of the measuring system itself - equipment, method, appraisers, and environment - to quantify how much observed variation comes from measurement error rather than from the process.
- Gage R&R
- Related: Measurement system analysis (MSA), Operational definition
A study that splits measurement variation into repeatability (same appraiser, same part) and reproducibility (different appraisers), showing whether the gauge can be trusted for decisions.
- Process capability index (Cpk)
- Related: Control chart, DPMO
A number comparing how well a stable process fits inside its specification limits, accounting for both spread and centering; 1.33 is a common minimum for a capable process.
- DPMO
- Related: Rolled throughput yield (RTY), Process capability index (Cpk)
Defects per million opportunities - total defects divided by total defect opportunities, multiplied by one million - used to compare processes of different complexity on a common scale.
- Rolled throughput yield (RTY)
- Related: Hidden factory, DPMO
The probability that a unit passes every step of a process without a defect, found by multiplying the first-pass yields of all steps; it exposes hidden losses in multi-step processes.
- Attribute data
- Related: Measurement system analysis (MSA), Control chart
Counted or classified observations, such as pass/fail, number of defects, or defect type, which can take only whole-number values and require different statistical tools than continuous data.
- Cause-and-effect diagram
- Related: 5 Whys, Hypothesis test
A visual tool that organizes possible causes of a problem into branches - commonly people, machine, method, material, measurement, and environment - to guide the investigation.
- 5 Whys
- Related: Cause-and-effect diagram
A questioning technique that repeatedly asks why a problem occurred, drilling from the visible symptom down to a root cause that can actually be addressed.
- Hypothesis test
- Related: p-value, Type I error, ANOVA
A statistical procedure that uses sample data to decide whether an observed difference or relationship is real or could plausibly have arisen from ordinary random variation.
- p-value
- Related: Hypothesis test, Type I error
The probability of obtaining a result at least as extreme as the one observed if the null hypothesis were true; small values suggest the observed effect is unlikely to be chance.
- Type I error
- Related: p-value, Hypothesis test
Rejecting a true null hypothesis - concluding there is a real difference when there is none; its risk is set by the alpha level, commonly 0.05.
- ANOVA
- Related: Hypothesis test, Design of experiments (DOE)
Analysis of variance: a test that compares the means of three or more groups by examining how much variation lies between the groups versus how much lies within them.
- Regression analysis
- Related: Hypothesis test, Interaction
A method that models the relationship between one or more input variables and a continuous output, giving an equation for prediction and showing how much variation the inputs explain.
- Multi-vari chart
- Related: Cause-and-effect diagram, Control chart
A chart that displays variation from several sources at once - within a piece, between pieces, and over time - helping locate where variation mainly lives before formal testing.
- Design of experiments (DOE)
- Related: Factor, Interaction, ANOVA
A structured set of planned tests in which input factors are deliberately varied together, so their individual and combined effects on a response can be measured efficiently.
- Factor
- Related: Interaction, Design of experiments (DOE)
An input variable deliberately set at different values in an experiment to see whether changing it shifts the response.
- Interaction
- Related: Factor, Design of experiments (DOE)
A situation where the effect of one factor on the response depends on the level of another factor, so the two factors cannot be judged separately.
- Kaizen
- Related: Poka-yoke, Lean
Continuous, incremental improvement carried out by the people who do the work, often through short focused events that eliminate waste in a specific area.
- Poka-yoke
- Related: Failure mode and effects analysis (FMEA), Control plan
A device or design feature that makes it impossible, or immediately obvious, to perform a step incorrectly, preventing defects rather than detecting them later.
- Failure mode and effects analysis (FMEA)
- Related: Poka-yoke, Control plan
A team-based method that lists potential failure modes, rates their severity, occurrence, and detection, and prioritizes actions to reduce the highest-risk failures.
- Control plan
- Related: Control chart, Out-of-control action plan (OCAP)
A document listing process steps, the measurements to monitor, the control method, sample size and frequency, and the action to take when a result falls outside requirements.
- Control chart
- Related: Common cause variation, Special cause variation
A time-ordered plot of a process measure with statistically calculated limits, used to distinguish normal variation from signals that the process has changed.
- Common cause variation
- Related: Special cause variation, Control chart
Normal, everyday variation built into a process by many small sources; reducing it requires changing the process itself rather than reacting to individual data points.
- Special cause variation
- Related: Common cause variation, Out-of-control action plan (OCAP)
Unusual variation from an identifiable source outside the normal process, such as a bad batch, a new operator, or a machine fault, which appears as a signal on a control chart.
- X-bar and R chart
- Related: Control chart, Out-of-control action plan (OCAP)
A pair of control charts for continuous data: one tracks subgroup averages (X-bar) and the other tracks subgroup ranges (R), monitoring both the centering and the spread of a process.
- Out-of-control action plan (OCAP)
- Related: Control chart, Control plan
A pre-agreed set of steps telling operators whom to notify and what to check, contain, and record when a control chart signals an out-of-control condition.