CSSYB key terms
CSSYB · Get comfortable with the vocabulary.
- Six Sigma
- Related: DMAIC, DPMO, Critical to Quality (CTQ)
A disciplined, data-driven approach to improving processes by reducing variation and eliminating defects, with the goal of no more than 3.4 defects per million opportunities.
- DMAIC
- Related: Six Sigma, DFSS (DMADV), Project Charter
The five-phase improvement cycle - Define, Measure, Analyze, Improve, Control - used to solve problems in existing processes that fall short of customer requirements.
- DFSS (DMADV)
- Related: DMAIC, Six Sigma, Critical to Quality (CTQ)
Design for Six Sigma applies when a product or process does not yet exist; DMADV stands for Define, Measure, Analyze, Design, and Verify, and aims to build quality in from the start.
- DPMO
- Related: Six Sigma, Process Capability, Discrete Data
A normalized defect metric that scales the number of defects found to one million opportunities, allowing processes of different sizes and complexity to be compared on a single scale.
- Y = f(x)
- Related: DMAIC, Root Cause Analysis, Cause-and-Effect Diagram
A shorthand statement of the Six Sigma premise that outcomes (Y) result from process inputs and causes (x); improvement comes from finding and changing the influential x's.
- Voice of the Customer (VOC)
- Related: Critical to Quality (CTQ), Project Charter, SIPOC
The customer needs, expectations, and feedback gathered through interviews, surveys, complaints, and observation; it is the starting point for defining what quality means for the project.
- Critical to Quality (CTQ)
- Related: Voice of the Customer (VOC), Operational Definition, Process Capability
A measurable characteristic of a product or process that is essential to satisfying the customer, translating vague customer wants into specifications the project team can measure and improve.
- Value-Added Activity
- Related: Eight Wastes, Process Map, Kaizen
Work the customer would willingly pay for because it changes the product or service in a way the customer values, and it is performed correctly the first time.
- Eight Wastes
- Related: Value-Added Activity, Process Map, Kaizen
The eight categories of non-value-adding activity: defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra processing, often remembered by the acronym TIMWOODS.
- Champion (Sponsor)
- Related: Project Charter, Six Sigma, Process Owner
A senior manager who authorizes a Six Sigma project, secures resources, removes organizational barriers, and holds the team accountable for delivering the intended business results.
- Project Charter
- Related: Problem Statement, Goal Statement, Business Case
A formal document that authorizes a project and states its business case, problem, goal, scope, team, schedule, and expected benefits; it serves as the team's contract with management.
- Problem Statement
- Related: Goal Statement, Business Case, Project Charter
A concise, factual description of the gap between current and desired performance, including what, where, when, and how much, without naming a cause or proposing a solution.
- Goal Statement
- Related: Problem Statement, Project Charter, Operational Definition
A specific, measurable target for the project that states the improvement to be achieved, by when, and how it will be verified; it is derived directly from the problem statement.
- Business Case
- Related: Project Charter, Problem Statement, Champion (Sponsor)
The justification for doing the project, describing the financial and strategic benefit to the organization and the consequences of failing to act on the problem.
- SIPOC
- Related: Process Map, Voice of the Customer (VOC), Project Charter
A high-level map showing the Suppliers, Inputs, Process, Outputs, and Customers of a process, used to agree on scope and boundaries before detailed analysis begins.
- Stakeholder Analysis
- Related: Project Charter, Champion (Sponsor), Process Owner
Identifying everyone affected by or able to influence the project and assessing their interest and influence so the team can plan communication and build support.
- Process Map
- Related: SIPOC, Value-Added Activity, Eight Wastes
A visual diagram of the sequence of steps, decisions, and handoffs in a process, used to expose complexity, rework loops, and steps that add no value.
- Operational Definition
- Related: Measurement System Analysis (MSA), Critical to Quality (CTQ), Control Plan
A precise, unambiguous description of how a characteristic is measured - including instrument, procedure, and decision criteria - so different people obtain the same result.
- Continuous Data
- Related: Discrete Data, Histogram, Process Capability
Measurement data that can take any value within a range, limited mainly by the precision of the measuring device, such as time, weight, length, or temperature.
- Discrete Data
- Related: Continuous Data, Pareto Chart, DPMO
Data that can take only specific countable values, such as pass or fail, number of defects, or number of complaints; also called attribute or categorical data.
- Check Sheet
- Related: Operational Definition, Pareto Chart, Control Chart
A structured form for recording how often events occur, designed so data are collected consistently and can be tallied easily by anyone at the point where the process runs.
- Histogram
- Related: Continuous Data, Process Capability, Control Chart
A bar chart of continuous data grouped into intervals that shows the shape, center, and spread of a distribution and reveals unusual features such as multiple peaks or skew.
- Measurement System Analysis (MSA)
- Related: Operational Definition, Continuous Data, Check Sheet
A study that quantifies how much observed variation comes from the measurement system itself - repeatability and reproducibility - rather than from the process being measured.
- Process Capability
- Related: Control Chart, Continuous Data, DPMO
A comparison of a process's spread and centering against its specification limits, expressed through indices such as Cp and Cpk that show how well requirements can be met.
- Root Cause Analysis
- Related: Cause-and-Effect Diagram, 5 Whys, Y = f(x)
A structured investigation to find the underlying process conditions that produce a problem, so corrective action removes the source of the problem rather than its symptom.
- Cause-and-Effect Diagram
- Related: Root Cause Analysis, Brainstorming, 5 Whys
A team tool that branches the possible causes of a problem into categories such as people, machine, method, material, measurement, and environment; also called a fishbone or Ishikawa diagram.
- 5 Whys
- Related: Root Cause Analysis, Cause-and-Effect Diagram, Brainstorming
A simple technique of repeatedly asking why a problem occurs, with each answer prompting the next question, until the fundamental cause is reached; typically about five rounds are needed.
- Scatter Diagram
- Related: Continuous Data, Root Cause Analysis, Cause-and-Effect Diagram
A plot of paired values for two variables that shows whether they move together and roughly how strong the relationship is; it demonstrates association, not proof of causation.
- Pareto Chart
- Related: Check Sheet, Root Cause Analysis, Discrete Data
A bar chart of problems ordered by frequency with a cumulative percentage line, used to separate the vital few causes from the trivial many according to the 80/20 principle.
- FMEA (Failure Mode and Effects Analysis)
- Related: Root Cause Analysis, Control Plan, Response Plan
A structured table that lists how a process or product could fail, rates severity, occurrence, and detection, and prioritizes actions using a risk priority number.
- Brainstorming
- Related: Cause-and-Effect Diagram, Kaizen, 5 Whys
A group technique for generating a large number of ideas without judging them, encouraging free thinking first and organizing and evaluating the list afterwards.
- Poka-Yoke (Mistake Proofing)
- Related: FMEA (Failure Mode and Effects Analysis), Control Plan, Standard Work
Designing a process, device, or check so that an error cannot be made or cannot pass to the next step, removing reliance on operator attention and memory.
- Kaizen
- Related: Eight Wastes, 5S, Standard Work
A philosophy and practice of continuous, incremental improvement carried out by the people who do the work, often through short focused events that test changes quickly.
- 5S
- Related: Kaizen, Standard Work, Eight Wastes
A workplace organization method - sort, set in order, shine, standardize, and sustain - that removes clutter, reduces wasted motion, and makes abnormal conditions easy to see.
- Pilot Test
- Related: Kaizen, Control Plan, Stakeholder Analysis
A limited trial of a proposed change on a small scale to confirm that it works, refine the details, and build evidence before full implementation across the process.
- Control Plan
- Related: Control Chart, Response Plan, Standard Work
A document that specifies, for each process characteristic, what is monitored, the specification, the measurement method, the sample size and frequency, and the reaction when limits are exceeded.
- Control Chart
- Related: Response Plan, Process Capability, Standard Work
A time-ordered plot of data with statistically calculated control limits, used to distinguish normal common-cause variation from special-cause signals that require investigation.
- Standard Work
- Related: Control Plan, Kaizen, Process Owner
A documented, agreed description of the safest and most effective way to perform each task, including sequence, cycle time, and required materials, forming the baseline for further improvement.
- Response Plan
- Related: Control Chart, Control Plan, Process Owner
Predetermined actions stating who does what when a control chart or monitoring point signals an out-of-control condition, so the process is corrected promptly and consistently.
- Process Owner
- Related: Control Plan, Standard Work, Champion (Sponsor)
The person accountable for the ongoing performance of a process after the project ends; this role monitors controls, maintains standard work, and authorizes further changes.