- Rated capacity
- The maximum load a crane may lift at a specific radius, boom length, and configuration as published in the manufacturer's load chart, before deductions for rigging and block.
- Load moment
- The product of load weight and horizontal radius from the crane's rotation center; it measures the tipping effect and is the basis for stability-limited capacity.
- Anti-two-block device
- A safety device that stops hoisting when the hook block approaches the boom tip, preventing rope damage, block failure, and load loss.
- Outrigger float loading
- The force transmitted through an outrigger float to the ground, which must be spread over mats and kept below soil bearing capacity to prevent tipping.
- Sling angle multiplier
- For a two-leg bridle, leg tension equals half the load divided by the sine of the angle from horizontal; lower angles increase tension sharply.
- Choker hitch capacity
- A sling configuration where the sling passes around the load and through its own eye; capacity is reduced relative to vertical rating, often to about 80 percent.
- Center of gravity
- The point where the load's weight is concentrated; the hook must be directly above it so sling legs share load evenly and the load stays level.
- Shift inspection
- A pre-use inspection performed before each shift covering controls, brakes, hooks, wire rope, safety devices, and fluids, with safety-affecting defects corrected before operation.
- Monthly inspection
- A documented inspection by a qualified person covering the crane's structural and mechanical components, performed at intervals not exceeding one month.
- Annual inspection
- A comprehensive documented inspection that may require disassembly of components, performed at least annually and after certain repairs or modifications.
- Ground bearing pressure
- Outrigger load divided by the area of the supporting mat; it must not exceed the soil's capacity or the crane may settle and tip.
- Standard hand signals
- A defined set of arm and hand motions used to direct crane operators; the signal person must be qualified and clearly visible to the operator.
- STOP signal
- A universal signal any person may give; the operator must halt immediately and not resume until directed by the signal person.
- Dedicated spotter
- A person whose sole duty is to observe the crane's approach to a power line and warn the operator before the minimum approach distance is reached.
- Minimum approach distance
- The required clearance from energized power lines: 20 feet for lines up to 350 kV and 50 feet for lines over 350 kV up to 1000 kV.
- Power line contact response
- If the crane contacts a line, the operator stays in the cab, warns others away, and avoids simultaneous contact with the machine and ground.
- Two-leg bridle tension
- Leg tension equals (load divided by two) divided by the sine of the angle each leg makes with horizontal; steeper legs carry less tension.
- Rigging deduction
- The weight of hook block, slings, shackles, spreader beams, and other below-the-hook gear subtracted from rated capacity to determine allowable load weight.
- Boom angle and radius
- For a fixed boom length, raising the boom angle reduces radius and increases capacity; lowering the angle increases radius and reduces capacity.
- Leveling tolerance
- The manufacturer's limit on crane out-of-level condition, commonly about one percent grade, which must be met before lifting to keep charts valid.
- Pre-lift meeting
- A briefing before personnel platform lifts covering procedures, signals, and emergency actions, required by the standard before the trial lift.
- Trial lift
- A test raising of the loaded platform a short distance to verify stability and rigging before personnel are lifted, required for platform operations.
- Signal person qualification
- Employer verification that a signal person knows standard signals, crane dynamics, and can give clear directions, documented and kept on file.
- Operator certification
- Documented proof of crane operator qualification by an accredited testing organization, licensing, or employer audit, with records retained by the employer.
- Subpart CC scope
- OSHA 29 CFR 1926 Subpart CC covers power-operated equipment that hoists, lowers, and horizontally moves a suspended load in construction, with listed exclusions.
- Lockout/tagout
- A procedure isolating energy sources during crane maintenance so the machine cannot be started or moved unexpectedly, protecting service personnel.
- Near-miss reporting
- Recording events that could have caused injury or damage but did not, allowing corrective action before a serious accident occurs.
- Wire rope design factor
- The ratio of wire rope breaking strength to the load it carries; running lines for most crane applications use a design factor of about five.
- Tag line use
- A rope used to control load rotation and swing; it is not rated to support the load and must not be used to arrest a fall.
- Suspended load rule
- The operator must not leave the controls while a load is suspended; if leaving the cab, the load is lowered and the machine secured.
- Wind limit
- The maximum wind speed set by the manufacturer's manual or chart; load sail area increases wind force and can exceed capacity or stability limits.
- Proof load test
- A test applying a specified load greater than rated capacity to verify structural integrity, required after certain repairs or modifications per the manufacturer.