Voltage Drop

The loss of voltage along a conductor caused by its resistance as current flows. Low-voltage circuits are more sensitive to it, so wire size and run length must be checked against the load.

Related: Ohm's Law, Conductor Ampacity
Ohm's Law

The relationship stating that voltage equals current multiplied by resistance. Installers use it to predict current draw, voltage drop, and available power on low-voltage circuits before choosing cable.

Related: Voltage Drop, Power (Watts)
Power (Watts)

The rate at which electrical energy is consumed or delivered, equal to voltage times current in a resistive circuit. It determines supply sizing for cameras, access control, and network equipment.

Related: Ohm's Law, Power over Ethernet (PoE)
Class 2 Circuit

A circuit supplied by a limited-energy source, such as a listed Class 2 transformer or power supply, that poses low fire and shock risk and may use lighter wiring methods than power circuits.

Related: Class 3 Circuit, Limited-Energy Circuit
Class 3 Circuit

A limited-energy circuit with higher permitted voltage and power than Class 2, typically used for some signaling and control applications. Its cable and installation rules differ from Class 2 requirements.

Related: Class 2 Circuit, Limited-Energy Circuit
Limited-Energy Circuit

A circuit whose source is restricted in voltage and current so that it presents minimal ignition and shock hazard. Class 2 and Class 3 circuits are the common examples in low-voltage work.

Related: Class 2 Circuit, Class 3 Circuit
Conductor Ampacity

The maximum current a conductor can carry continuously under stated conditions without exceeding its temperature rating. Ampacity tables and derating factors set the limits for every cable run.

Related: Voltage Drop, Derating
Plenum Cable

Cable with jacketing and insulation rated for installation in air-handling spaces, producing limited smoke and flame spread. It usually costs more than riser or general-purpose cable and is required where the code mandates it.

Related: Riser Cable, Cable Jacket Rating
Riser Cable

Cable rated for vertical installation in shafts between floors, with flame-spread performance between plenum and general-purpose ratings. It is used where a floor-to-floor run passes through a vertical opening.

Related: Plenum Cable, Cable Jacket Rating
Cable Jacket Rating

The printed designation showing where a cable may legally be installed, such as general-purpose, riser, or plenum. Inspectors check the jacket legend to confirm the cable matches the space it passes through.

Related: Plenum Cable, Riser Cable
Support and Securing Intervals

The maximum spacing between supports and between fasteners that hold cable in place. Low-voltage and communications cables have their own spacing rules that differ from those for power wiring.

Related: J-Hook Support, Raceway Fill
J-Hook Support

A hook-shaped hanger used to carry bundles of communications cable without pinching or exceeding bend radius. Hooks are spaced per the manufacturer and code limits and are not used to support power cable.

Related: Support and Securing Intervals, Bend Radius
Bend Radius

The minimum curve a cable or fiber may be bent without damage or signal loss. It is usually expressed as a multiple of the cable diameter and must be respected at boxes, panels, and pull points.

Related: J-Hook Support, Pull Tension
Raceway Fill

The percentage of a conduit's cross-section occupied by conductors and cable. Fill limits keep pulls manageable and prevent heat buildup, and they are calculated before a raceway size is chosen.

Related: Conduit Fill Calculation, Pull Tension
Conduit Fill Calculation

A computation comparing the total cross-sectional area of installed cables to the allowable percentage of the conduit interior. It confirms that a raceway is large enough for the intended cable count.

Related: Raceway Fill, Bend Radius
Separation of Power and Communications Cables

The required physical spacing or barrier between limited-energy communications cable and power conductors. It reduces electrical noise and prevents a fault on power wiring from energizing low-voltage cable.

Related: Class 2 Circuit, Grounding Electrode
Article 725

The National Electrical Code article covering Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits. It governs wiring methods, source limitations, and separation for much low-voltage work.

Related: Article 800, Class 2 Circuit
Article 800

The National Electrical Code article addressing communications circuits, including cable types, installation, grounding, and protection. It applies to telephone, data, and similar communications cabling inside buildings.

Related: Article 725, Article 760
Article 760

The National Electrical Code article covering fire alarm systems, including power-limited fire alarm circuits, cable requirements, and installation rules. It sets the wiring methods used for detection and notification circuits.

Related: Article 725, Fire Alarm Control Panel (FACP)
Article 820

The National Electrical Code article governing community antenna television and radio distribution systems, commonly applied to coaxial cable for video and broadband. It addresses cable types, grounding, and bonding of the shield.

Related: Article 800, Coaxial Cable
Connecticut Electrical Code Adoption

The process by which Connecticut adopts a edition of the National Electrical Code as state law, sometimes with amendments. Work must comply with the edition in force on the permit date, not merely the newest published version.

Related: Local Amendment, Electrical Inspector
Local Amendment

A state or municipal modification that changes or supplements the adopted electrical code. Installers must check both the state code and any local requirements before starting a project.

Related: Connecticut Electrical Code Adoption, Permit
Electrical Inspector

The authority having jurisdiction who reviews permits and inspects installations for code compliance. Inspectors may approve, fail, or require corrections, and their interpretation governs acceptance in the field.

Related: Permit, Rough-In Inspection
Permit

The official authorization issued before regulated electrical work begins. Working without one can result in failed inspections, fines, and required removal or rework of the installation.

Related: Electrical Inspector, Certificate of Occupancy
Rough-In Inspection

A inspection performed after wiring is installed but before walls, ceilings, or finishes conceal it. Deficiencies found at this stage are far cheaper to correct than after closing up the structure.

Related: Permit, Electrical Inspector
Fire Alarm Control Panel (FACP)

The central unit that monitors initiating devices, powers notification appliances, and reports system status. It supervises circuit integrity and annunciates alarms, troubles, and supervisory conditions.

Related: Initiating Device Circuit, Notification Appliance Circuit
Initiating Device Circuit

The circuit connecting detectors and manual pull stations to the fire alarm panel. It is supervised so that a break or short is reported as a trouble rather than silently disabling detection.

Related: Fire Alarm Control Panel (FACP), Notification Appliance Circuit
Notification Appliance Circuit

The circuit that powers horns, strobes, and speakers to warn occupants. It must deliver the required sound pressure and light output while staying within the panel's listed power limits.

Related: Initiating Device Circuit, Fire Alarm Control Panel (FACP)
Supervision

Continuous monitoring of a circuit or device so that an open, short, or ground fault produces a visible trouble signal. Supervised circuits are a core requirement for reliable life safety operation.

Related: Initiating Device Circuit, Ground Fault
Access Control Credential

The card, fob, keypad code, or biometric identifier presented to gain entry. Credential technology and encryption determine how easily the system can be cloned or bypassed.

Related: Request-to-Exit (REX), Fail-Safe vs Fail-Secure
Request-to-Exit (REX)

A device such as a push button or motion sensor that releases a door for egress without requiring a credential. It must work with the lock arrangement and fire alarm release to allow safe exit.

Related: Fail-Safe vs Fail-Secure, Access Control Credential
Fail-Safe vs Fail-Secure

A design choice describing how a lock behaves when power is lost. Fail-safe locks unlock on power loss and are used for life safety egress; fail-secure locks stay locked and suit secure storage areas.

Related: Request-to-Exit (REX), Door Held Open Alarm
Door Held Open Alarm

A notification triggered when a door stays open beyond a set time after a valid unlock. It alerts staff to propped doors and is a common feature of monitored access control systems.

Related: Fail-Safe vs Fail-Secure, Access Control Credential
Power over Ethernet (PoE)

A method of delivering both data and DC power to devices over twisted-pair network cable. Power budgets, cable category, and distance limits must be checked for cameras, phones, and access points.

Related: Structured Cabling, Power (Watts)
Structured Cabling

A standardized layout of cabling, jacks, patch panels, and pathways organized into subsystems. It supports voice, data, and video with consistent testing and administration rather than ad hoc wiring.

Related: Patch Panel, Cable Certification Test
Patch Panel

A rack-mounted assembly where horizontal cables terminate and are cross-connected to network equipment. It simplifies moves, adds, and changes and keeps cable management orderly in a telecommunications room.

Related: Structured Cabling, Cable Certification Test
Cable Certification Test

A field test measuring a installed link against a standard for parameters such as attenuation, crosstalk, and return loss. Passing results are documented and often required before a system is accepted.

Related: Structured Cabling, Patch Panel
Grounding Electrode

The conductive element, such as a rod or building steel, that connects an electrical system to the earth. It provides a reference point and a path for lightning and fault currents.

Related: Bonding, Ground Fault
Bonding

The intentional connection of metal parts to create an electrically continuous path. Bonding equalizes potential between equipment, raceways, and grounding conductors to reduce shock and arcing hazards.

Related: Grounding Electrode, Ground Fault
Ground Fault

An unintended current path from a live conductor to ground through a person, equipment, or building material. It can cause shock, fire, or nuisance tripping and is why bonding and protection are required.

Related: Bonding, Supervision
Lockout/Tagout

A safety procedure that isolates energy sources and marks them so equipment cannot be re-energized during work. It protects installers servicing panels, power supplies, and connected circuits.

Related: Ground Fault, Personal Protective Equipment (PPE)
Personal Protective Equipment (PPE)

Wearable safety gear such as gloves, eye protection, and arc-rated clothing selected for the task hazard. Proper PPE is required when working near energized equipment or in construction environments.

Related: Lockout/Tagout, Ground Fault
Low Voltage Contractor License

The state credential authorizing a business to perform low-voltage installation work within defined scope. Licensing rules cover qualifications, insurance, and who may supervise and sign for the work.

Related: Scope of Work, Permit
Scope of Work

The written description of what a project includes and excludes, such as devices, cabling, testing, and documentation. A clear scope prevents disputes over responsibility at project closeout.

Related: Change Order, Punch List
Change Order

A written modification to the contract that adjusts scope, price, or schedule after work begins. Signed change orders protect the contractor from performing extra work without compensation.

Related: Scope of Work, Punch List
Punch List

A itemized record of incomplete or deficient work identified near project completion. Closing out the punch list is typically required before final payment and acceptance by the owner.

Related: Scope of Work, Certificate of Occupancy
Certificate of Occupancy

The document issued by a building official confirming that a structure may be legally occupied. Final electrical inspections and sign-offs are usually prerequisites for receiving it.

Related: Permit, Punch List