- Voltage Drop
- Related: Ohm's Law, Conductor Ampacity
The loss of voltage along a conductor caused by its resistance as current flows. Low-voltage circuits are more sensitive to it, so wire size and run length must be checked against the load.
- Ohm's Law
- Related: Voltage Drop, Power (Watts)
The relationship stating that voltage equals current multiplied by resistance. Installers use it to predict current draw, voltage drop, and available power on low-voltage circuits before choosing cable.
- Power (Watts)
- Related: Ohm's Law, Power over Ethernet (PoE)
The rate at which electrical energy is consumed or delivered, equal to voltage times current in a resistive circuit. It determines supply sizing for cameras, access control, and network equipment.
- Class 2 Circuit
- Related: Class 3 Circuit, Limited-Energy Circuit
A circuit supplied by a limited-energy source, such as a listed Class 2 transformer or power supply, that poses low fire and shock risk and may use lighter wiring methods than power circuits.
- Class 3 Circuit
- Related: Class 2 Circuit, Limited-Energy Circuit
A limited-energy circuit with higher permitted voltage and power than Class 2, typically used for some signaling and control applications. Its cable and installation rules differ from Class 2 requirements.
- Limited-Energy Circuit
- Related: Class 2 Circuit, Class 3 Circuit
A circuit whose source is restricted in voltage and current so that it presents minimal ignition and shock hazard. Class 2 and Class 3 circuits are the common examples in low-voltage work.
- Conductor Ampacity
- Related: Voltage Drop, Derating
The maximum current a conductor can carry continuously under stated conditions without exceeding its temperature rating. Ampacity tables and derating factors set the limits for every cable run.
- Plenum Cable
- Related: Riser Cable, Cable Jacket Rating
Cable with jacketing and insulation rated for installation in air-handling spaces, producing limited smoke and flame spread. It usually costs more than riser or general-purpose cable and is required where the code mandates it.
- Riser Cable
- Related: Plenum Cable, Cable Jacket Rating
Cable rated for vertical installation in shafts between floors, with flame-spread performance between plenum and general-purpose ratings. It is used where a floor-to-floor run passes through a vertical opening.
- Cable Jacket Rating
- Related: Plenum Cable, Riser Cable
The printed designation showing where a cable may legally be installed, such as general-purpose, riser, or plenum. Inspectors check the jacket legend to confirm the cable matches the space it passes through.
- Support and Securing Intervals
- Related: J-Hook Support, Raceway Fill
The maximum spacing between supports and between fasteners that hold cable in place. Low-voltage and communications cables have their own spacing rules that differ from those for power wiring.
- J-Hook Support
- Related: Support and Securing Intervals, Bend Radius
A hook-shaped hanger used to carry bundles of communications cable without pinching or exceeding bend radius. Hooks are spaced per the manufacturer and code limits and are not used to support power cable.
- Bend Radius
- Related: J-Hook Support, Pull Tension
The minimum curve a cable or fiber may be bent without damage or signal loss. It is usually expressed as a multiple of the cable diameter and must be respected at boxes, panels, and pull points.
- Raceway Fill
- Related: Conduit Fill Calculation, Pull Tension
The percentage of a conduit's cross-section occupied by conductors and cable. Fill limits keep pulls manageable and prevent heat buildup, and they are calculated before a raceway size is chosen.
- Conduit Fill Calculation
- Related: Raceway Fill, Bend Radius
A computation comparing the total cross-sectional area of installed cables to the allowable percentage of the conduit interior. It confirms that a raceway is large enough for the intended cable count.
- Separation of Power and Communications Cables
- Related: Class 2 Circuit, Grounding Electrode
The required physical spacing or barrier between limited-energy communications cable and power conductors. It reduces electrical noise and prevents a fault on power wiring from energizing low-voltage cable.
- Article 725
- Related: Article 800, Class 2 Circuit
The National Electrical Code article covering Class 1, Class 2, and Class 3 remote-control, signaling, and power-limited circuits. It governs wiring methods, source limitations, and separation for much low-voltage work.
- Article 800
- Related: Article 725, Article 760
The National Electrical Code article addressing communications circuits, including cable types, installation, grounding, and protection. It applies to telephone, data, and similar communications cabling inside buildings.
- Article 760
- Related: Article 725, Fire Alarm Control Panel (FACP)
The National Electrical Code article covering fire alarm systems, including power-limited fire alarm circuits, cable requirements, and installation rules. It sets the wiring methods used for detection and notification circuits.
- Article 820
- Related: Article 800, Coaxial Cable
The National Electrical Code article governing community antenna television and radio distribution systems, commonly applied to coaxial cable for video and broadband. It addresses cable types, grounding, and bonding of the shield.
- Connecticut Electrical Code Adoption
- Related: Local Amendment, Electrical Inspector
The process by which Connecticut adopts a edition of the National Electrical Code as state law, sometimes with amendments. Work must comply with the edition in force on the permit date, not merely the newest published version.
- Local Amendment
- Related: Connecticut Electrical Code Adoption, Permit
A state or municipal modification that changes or supplements the adopted electrical code. Installers must check both the state code and any local requirements before starting a project.
- Electrical Inspector
- Related: Permit, Rough-In Inspection
The authority having jurisdiction who reviews permits and inspects installations for code compliance. Inspectors may approve, fail, or require corrections, and their interpretation governs acceptance in the field.
- Permit
- Related: Electrical Inspector, Certificate of Occupancy
The official authorization issued before regulated electrical work begins. Working without one can result in failed inspections, fines, and required removal or rework of the installation.
- Rough-In Inspection
- Related: Permit, Electrical Inspector
A inspection performed after wiring is installed but before walls, ceilings, or finishes conceal it. Deficiencies found at this stage are far cheaper to correct than after closing up the structure.
- Fire Alarm Control Panel (FACP)
- Related: Initiating Device Circuit, Notification Appliance Circuit
The central unit that monitors initiating devices, powers notification appliances, and reports system status. It supervises circuit integrity and annunciates alarms, troubles, and supervisory conditions.
- Initiating Device Circuit
- Related: Fire Alarm Control Panel (FACP), Notification Appliance Circuit
The circuit connecting detectors and manual pull stations to the fire alarm panel. It is supervised so that a break or short is reported as a trouble rather than silently disabling detection.
- Notification Appliance Circuit
- Related: Initiating Device Circuit, Fire Alarm Control Panel (FACP)
The circuit that powers horns, strobes, and speakers to warn occupants. It must deliver the required sound pressure and light output while staying within the panel's listed power limits.
- Supervision
- Related: Initiating Device Circuit, Ground Fault
Continuous monitoring of a circuit or device so that an open, short, or ground fault produces a visible trouble signal. Supervised circuits are a core requirement for reliable life safety operation.
- Access Control Credential
- Related: Request-to-Exit (REX), Fail-Safe vs Fail-Secure
The card, fob, keypad code, or biometric identifier presented to gain entry. Credential technology and encryption determine how easily the system can be cloned or bypassed.
- Request-to-Exit (REX)
- Related: Fail-Safe vs Fail-Secure, Access Control Credential
A device such as a push button or motion sensor that releases a door for egress without requiring a credential. It must work with the lock arrangement and fire alarm release to allow safe exit.
- Fail-Safe vs Fail-Secure
- Related: Request-to-Exit (REX), Door Held Open Alarm
A design choice describing how a lock behaves when power is lost. Fail-safe locks unlock on power loss and are used for life safety egress; fail-secure locks stay locked and suit secure storage areas.
- Door Held Open Alarm
- Related: Fail-Safe vs Fail-Secure, Access Control Credential
A notification triggered when a door stays open beyond a set time after a valid unlock. It alerts staff to propped doors and is a common feature of monitored access control systems.
- Power over Ethernet (PoE)
- Related: Structured Cabling, Power (Watts)
A method of delivering both data and DC power to devices over twisted-pair network cable. Power budgets, cable category, and distance limits must be checked for cameras, phones, and access points.
- Structured Cabling
- Related: Patch Panel, Cable Certification Test
A standardized layout of cabling, jacks, patch panels, and pathways organized into subsystems. It supports voice, data, and video with consistent testing and administration rather than ad hoc wiring.
- Patch Panel
- Related: Structured Cabling, Cable Certification Test
A rack-mounted assembly where horizontal cables terminate and are cross-connected to network equipment. It simplifies moves, adds, and changes and keeps cable management orderly in a telecommunications room.
- Cable Certification Test
- Related: Structured Cabling, Patch Panel
A field test measuring a installed link against a standard for parameters such as attenuation, crosstalk, and return loss. Passing results are documented and often required before a system is accepted.
- Grounding Electrode
- Related: Bonding, Ground Fault
The conductive element, such as a rod or building steel, that connects an electrical system to the earth. It provides a reference point and a path for lightning and fault currents.
- Bonding
- Related: Grounding Electrode, Ground Fault
The intentional connection of metal parts to create an electrically continuous path. Bonding equalizes potential between equipment, raceways, and grounding conductors to reduce shock and arcing hazards.
- Ground Fault
- Related: Bonding, Supervision
An unintended current path from a live conductor to ground through a person, equipment, or building material. It can cause shock, fire, or nuisance tripping and is why bonding and protection are required.
- Lockout/Tagout
- Related: Ground Fault, Personal Protective Equipment (PPE)
A safety procedure that isolates energy sources and marks them so equipment cannot be re-energized during work. It protects installers servicing panels, power supplies, and connected circuits.
- Personal Protective Equipment (PPE)
- Related: Lockout/Tagout, Ground Fault
Wearable safety gear such as gloves, eye protection, and arc-rated clothing selected for the task hazard. Proper PPE is required when working near energized equipment or in construction environments.
- Low Voltage Contractor License
- Related: Scope of Work, Permit
The state credential authorizing a business to perform low-voltage installation work within defined scope. Licensing rules cover qualifications, insurance, and who may supervise and sign for the work.
- Scope of Work
- Related: Change Order, Punch List
The written description of what a project includes and excludes, such as devices, cabling, testing, and documentation. A clear scope prevents disputes over responsibility at project closeout.
- Change Order
- Related: Scope of Work, Punch List
A written modification to the contract that adjusts scope, price, or schedule after work begins. Signed change orders protect the contractor from performing extra work without compensation.
- Punch List
- Related: Scope of Work, Certificate of Occupancy
A itemized record of incomplete or deficient work identified near project completion. Closing out the punch list is typically required before final payment and acceptance by the owner.
- Certificate of Occupancy
- Related: Permit, Punch List
The document issued by a building official confirming that a structure may be legally occupied. Final electrical inspections and sign-offs are usually prerequisites for receiving it.