CT Plumber study plan
CT Plumber · Give each week a clear focus.
8 weeks · About 6 hours per week
Sanitary drainage and venting systems & General plumbing regulations, licensing, and code administration
Map the sanitary drainage and venting domain's 16% weight against the code chapters that govern it, listing the specific sections you will study in weeks 1-2
Draw from memory a full DWV stack diagram showing a soil stack, vent stack, stack vent, and revent, then label every fitting type
Explain in writing the difference between a wet vent, a common vent, and an individual vent, with one code-compliant example of each
Identify the licensing authority, exam eligibility requirements, and code edition adopted in your jurisdiction, and record them in a one-page reference sheet
Your checkpoint
A labeled hand-drawn DWV stack diagram plus a one-page jurisdiction reference sheet naming the adopted code edition and licensing authority
Sanitary drainage and venting systems & Water supply and distribution piping
Calculate fixture unit loads for a two-bathroom dwelling and size the building drain, building sewer, and main vent using code tables
Determine correct slope, developed length, and trap-to-vent distances for at least five different fixture configurations
Solve ten practice problems on drain pipe sizing, vent sizing, and fixture unit conversion, showing each step
Describe the requirements for cleanouts, including spacing, location, and access, and apply them to a sample floor plan
Your checkpoint
A worked problem set of ten drainage and venting sizing calculations with correct answers and cited code table references
Water supply and distribution piping & Fixtures, faucets, and fixture fittings
Size water supply distribution piping for a single-family dwelling using the demand weight of fixtures method, from meter to farthest fixture
Explain the difference between flow pressure, residual pressure, and static pressure, and calculate pressure loss through a given run of pipe
Identify the required air gaps and backflow prevention devices for five common fixture connections
Match ten fixture types to their minimum trap size, water supply connection size, and required flow pressure
Your checkpoint
A complete water supply sizing worksheet for a sample dwelling showing fixture units, developed length, and selected pipe sizes at each segment
Fixtures, faucets, and fixture fittings & Water heaters and hot water supply systems
List the installation clearances and spacing requirements for water closets, lavatories, bathtubs, and showers in a residential bathroom layout
Compare the venting and relief valve requirements for a tank-type water heater versus a tankless unit, and note where they differ
Calculate the required thermal expansion tank size and temperature and pressure relief valve rating for a given heater
Identify the accessibility requirements for fixtures under the applicable accessibility standard and apply them to a sample restroom
Your checkpoint
A scaled bathroom and restroom layout with all fixture spacing dimensions annotated and a water heater installation checklist covering venting, relief, and expansion control
General regulations and safety requirements & Traps, interceptors, and special wastes
Summarize the safety requirements for trenching, confined spaces, and soldering or brazing operations, and list the personal protective equipment required for each
Explain the function and code requirements for grease interceptors, sand traps, and oil separators, including sizing methods
Determine the correct trap type and venting for five special waste sources such as a commercial sink, laundry, and dental chair
Describe the requirements for indirect waste receptors and air breaks and give three compliant examples
Your checkpoint
A one-page safety quick-reference card plus a table matching five special waste sources to their required interceptor or trap and sizing basis
Storm drainage systems & Fuel gas piping and appliances
Size roof drains, leaders, and storm building drains for a given roof area and rainfall intensity, showing the calculation
Identify the differences between combined and separate storm systems and the requirements for each
Trace a fuel gas piping layout from meter to appliance and size each segment using the longest length method
List the clearance, bonding, and shutoff requirements for gas appliances and describe combustion air requirements for a confined space
Your checkpoint
A storm drainage sizing calculation for a sample roof plus a gas piping sizing worksheet showing each segment's load and selected pipe size
Isometric drawing and plan reading & General plumbing regulations, licensing, and code administration
Draw a complete isometric of a DWV system for a two-story dwelling from a given floor plan, including all vents and fixture connections
Produce a water supply isometric for the same plan showing hot and cold lines, valves, and fixture connections
Read a set of plumbing plans and extract a material takeoff for at least three fixture groups
Review the code administration process, including permit requirements, inspections, and the appeals process, and outline the steps in order
Your checkpoint
A complete hand-drawn DWV isometric and water supply isometric for the same floor plan, plus a material takeoff for three fixture groups
General plumbing regulations, licensing, and code administration & General regulations and safety requirements & Fixtures, faucets, and fixture fittings & Water heaters and hot water supply systems & Water supply and distribution piping & Sanitary drainage and venting systems & Storm drainage systems & Traps, interceptors, and special wastes & Fuel gas piping and appliances & Isometric drawing and plan reading
Complete a full-length timed practice exam under test conditions and score it by domain
Review every missed question and write a corrected explanation citing the governing code section
Re-drill your two weakest domains with twenty targeted questions each
Recite from memory the key tables and thresholds for fixture units, pipe sizing, and clearances
Your checkpoint
A scored full-length practice exam with a written error log identifying the two weakest domains and the specific corrections made
Milestones
Week 2: Can size a residential DWV system from fixture units to building sewer without notes, and score at least 80% on a self-made drainage and venting quiz
Week 4: Can lay out a bathroom and restroom to code spacing and produce a complete water heater installation checklist from memory
Week 6: Can size storm drainage and gas piping for a sample building and explain each step aloud without referring to notes
Week 8: Score at least 75% on the full-length timed practice exam with no domain below 60%