Quick reference

Engineering Mechanics (Statics and Dynamics)

  • Equilibrium of a planar rigid body requires ΣFx = 0, ΣFy = 0, ΣM = 0 about any point; three independent equations solve three unknowns.

  • Moment of a force about a point: M = F·d, where d is the perpendicular distance from the point to the line of action; sign convention must be fixed before summing.

  • Resultant of a concurrent force system: Rx = ΣFx, Ry = ΣFy, R = √(Rx² + Ry²), direction θ = arctan(Ry/Rx) measured from the x-axis.

  • Centroid of a composite area: x̄ = Σ(Ai·x̄i)/ΣAi, ȳ = Σ(Ai·ȳi)/ΣAi; for a triangle the centroid lies at one-third of the height from the base.

  • Friction limit: impending sliding occurs when F = μs·N; kinetic friction F = μk·N applies once motion starts, with μk < μs.

  • Equations of motion for constant acceleration: v = u + at, s = ut + ½at², v² = u² + 2as; these apply only when a is constant.

  • Newton's second law for a particle: ΣF = m·a; for a rigid body in plane motion the couple equation ΣM_G = I_G·α is added.

  • Work-energy principle: U₁₋₂ = ΔT, where work by a constant force is F·s·cosθ and kinetic energy T = ½mv²; power P = F·v.

Quick reference

Strength of Materials and Structural Analysis

  • Axial stress σ = N/A; axial strain ε = ΔL/L; Hooke's law σ = E·ε applies within the elastic limit, with E in GPa for steel (about 200 GPa).

  • Elongation of an axially loaded bar: ΔL = N·L/(A·E); for stepped or varying loads sum the contributions of each segment.

  • Bending stress: σ = M·y/I, maximum at the extreme fibre with y = c; section modulus W = I/c gives σmax = M/W.

  • Second moment of area for a rectangle about its centroidal axis: I = b·h³/12; parallel axis theorem I = I_c + A·d².

  • Shear stress in bending: τ = V·Q/(I·b); τ is zero at the extreme fibres and maximum at the neutral axis for a rectangular section.

  • Deflection of a simply supported beam under central point load P: δmax = P·L³/(48·E·I) at midspan.

  • Euler buckling load for a pin-ended column: Pcr = π²·E·I/L²; effective length factors reduce capacity for other end conditions.

  • Determinacy of a plane truss: m + r = 2j for statically determinate; m + r > 2j indicates redundancy, m + r < 2j indicates instability.

Quick reference

Construction Materials and Technology

  • Concrete characteristic strength fck is the 28-day cube strength below which no more than 5% of test results should fall; cylinder strength ≈ 0.8 × cube strength.

  • Concrete mix design targets water/cement ratio and exposure class; lower w/c increases strength and durability but reduces workability.

  • Cement types: CEM I (Portland), CEM II (Portland-composite), CEM III (blastfurnace), CEM IV (pozzolanic), CEM V (composite); sulfate-resistant and low-heat grades are selected for aggressive ground or mass pours.

  • Reinforcement: B500 deformed bars have characteristic yield strength 500 MPa; nominal cover is set by exposure class and fire resistance, not by bar diameter alone.

  • Concrete curing must retain moisture; stripping times depend on member type and achieved strength, typically verified by cube tests or maturity methods.

  • Masonry: mortar designation (M2.5 to M12) is chosen with unit strength; movement joints are required at intervals to accommodate thermal and moisture expansion.

  • Structural steel grade S275 or S355 denotes minimum yield strength in MPa; bolted connections use preloaded or bearing-type bolts per design category.

  • Bituminous mixtures are specified by aggregate gradation, binder grade and air voids; compaction temperature window is set by binder viscosity.

Quick reference

Construction Drawing

  • First-angle projection places the view from above below the front view; third-angle projection places it above; the projection symbol on the drawing identifies which system applies.

  • Scale notation 1:100 means 1 unit on the drawing equals 100 units on site; a 25 mm dimension on a 1:100 drawing represents 2.5 m.

  • Line hierarchy: continuous thick for visible outlines, continuous thin for dimension and projection lines, dashed for hidden edges, chain lines for centre lines and section planes.

  • A section drawing is identified by cutting-plane line with arrows showing viewing direction and by a section label (e.g. A-A).

  • Levels are annotated with a datum symbol and value in metres to three decimals, e.g. +3.450; the project datum is stated on the drawing title block.

  • Reinforcement drawings use bar marks with diameter, spacing and shape code; the bending schedule lists total lengths and weights per bar mark.

  • Drawing register and revision control: superseded drawings must be marked, and only the latest revision is valid for construction.

Quick reference

Surveying and Measurement

  • Levelling: height difference between two points = backsight reading − foresight reading; reduced level = known RL + backsight − foresight (height of collimation method).

  • Rise and fall method checks that Σbacksight − Σforesight = Σrise − Σfall = last RL − first RL.

  • Closed traverse angular check: sum of measured interior angles should equal (n−2)·180°; misclosure is distributed equally among the angles.

  • Coordinate computation from bearing and distance: ΔE = d·sinθ, ΔN = d·cosθ, with bearings measured clockwise from north.

  • Total station measures slope distance, then horizontal distance = slope distance × cos(vertical angle); EDM accuracy is quoted as ±(a + b ppm).

  • Volume by end areas: V = L·(A₁ + A₂)/2 for a prismoid segment; prismoidal formula V = L·(A₁ + 4Am + A₂)/6 is more accurate.

  • Setting out: right angles by 3-4-5 triangle or by theodolite; a baseline is established first and offsets are measured perpendicular to it.

  • Tolerance for setting out is project-specific; structural grid lines are typically checked against the design coordinates before any concrete is placed.

Quick reference

Building Services and Environmental Systems

  • Electrical supply in Cyprus is 230 V single-phase, 50 Hz; three-phase distribution is 400 V between phases.

  • Protection: an RCD rated 30 mA is required for socket circuits and wet areas; MCBs protect against overload and short circuit and are selected to the cable current-carrying capacity.

  • Earthing system types (TN-S, TN-C-S, TT) determine the protective measures and the need for an earth electrode at the installation.

  • Plumbing: hot water distribution uses a secondary return or is kept short to limit dead legs; pressure-reducing valves are fitted where mains pressure exceeds fixture rating.

  • Drainage: soil and waste stacks require ventilation to prevent trap seal loss; trap seals are nominally 50 mm minimum.

  • HVAC sizing: heating load by fabric transmission plus ventilation; cooling load includes solar gains, internal gains and latent load, not just temperature difference.

  • Ventilation rates are set per occupancy and use; mechanical extract is required in kitchens and sanitary spaces without openable windows.

  • Fire detection and alarm systems are zoned to limit the search area; sounders must achieve the specified sound pressure level at the bedhead or in occupied rooms.

Quick reference

Health, Safety and Site Organization

  • Hierarchy of control: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment as the last line of defence.

  • Working at height is the leading cause of fatal construction accidents; collective protection (guardrails, nets) takes priority over personal fall arrest.

  • Excavations: support or batter sides, keep spoil back from the edge, provide ladders within 25 m of travel, and inspect after rain or any ground movement.

  • Scaffolding must be erected, altered and dismantled by competent persons; it is inspected before first use and at intervals not exceeding 7 days.

  • Site induction and task-specific briefing are required before any worker starts; visitors must be escorted and issued PPE.

  • Site layout: separate pedestrian and vehicle routes, locate storage and plant away from excavations, and position welfare facilities within reasonable distance of the works.

  • Emergency arrangements: fire points, escape routes, assembly point, first-aid provision and emergency contact numbers are displayed on site.

  • Lifting operations require a plan by a competent person; exclusion zones are maintained beneath suspended loads and no person may ride on a load.

Quick reference

Technical Legislation, Standards and Contracts

  • Building permits: construction may not start before the planning and building permit is issued by the competent authority; deviations require a revised permit.

  • Cyprus building regulation references include the national seismic design provisions aligned with Eurocode 8 and the Eurocodes adopted as national standards.

  • Contract forms allocate risk: lump-sum contracts place quantity risk on the contractor; measurement (re-measurement) contracts pay for actual quantities executed.

  • Variations must be instructed in writing by the contract administrator; without a written instruction, the contractor's entitlement to payment is weak.

  • Time provisions: extension of time is granted for employer-risk events; liquidated damages apply for culpable delay at a stated rate per day.

  • Retention is typically deducted from interim payments and released in two parts - on practical completion and after the defects liability period.

  • Interim payment certificates are issued at stated intervals; the contractor submits an application and the certifier assesses the value of work executed.

  • Health and safety duties are imposed on the client, designer and contractor, who must cooperate and coordinate; the client must appoint competent persons.

Quick reference

Project Costing, Estimating and Quality Control

  • Unit-rate estimating: rate = labour + material + plant + subcontract + overheads + profit, expressed per unit of measurement (m³, m², m, nr).

  • Labour output is expressed as hours per unit; cost = hours × hourly rate including social insurance and allowances.

  • Quantity take-off follows the measurement rules of the chosen standard method; items are grouped by work section and measured net unless rules state otherwise.

  • Preliminaries (site establishment, supervision, temporary works, insurance) are priced separately and are not distributed into unit rates.

  • Cash flow and cost control use earned value: CPI = EV/AC and SPI = EV/PV; a CPI below 1.0 indicates cost overrun.

  • Contingency is an allowance for identified but unquantified risk; it is held in the estimate and released as risk is retired.

  • Quality control of concrete: slump test for workability, cube tests at 7 and 28 days for strength, and cover meter checks for reinforcement position.

  • Inspection and test plans (ITPs) define hold points where work cannot proceed without documented verification and sign-off.

Quick reference

Engineering Mechanics (Statics and Dynamics)

  • Equilibrium of a planar rigid body requires ΣFx = 0, ΣFy = 0, ΣM = 0 about any point; three independent equations solve three unknowns.

  • Moment of a force about a point: M = F·d, where d is the perpendicular distance from the point to the line of action; sign convention must be fixed before summing.

  • Resultant of a concurrent force system: Rx = ΣFx, Ry = ΣFy, R = √(Rx² + Ry²), direction θ = arctan(Ry/Rx) measured from the x-axis.

  • Centroid of a composite area: x̄ = Σ(Ai·x̄i)/ΣAi, ȳ = Σ(Ai·ȳi)/ΣAi; for a triangle the centroid lies at one-third of the height from the base.

  • Friction limit: impending sliding occurs when F = μs·N; kinetic friction F = μk·N applies once motion starts, with μk < μs.

  • Equations of motion for constant acceleration: v = u + at, s = ut + ½at², v² = u² + 2as; these apply only when a is constant.

  • Newton's second law for a particle: ΣF = m·a; for a rigid body in plane motion the couple equation ΣM_G = I_G·α is added.

  • Work-energy principle: U₁₋₂ = ΔT, where work by a constant force is F·s·cosθ and kinetic energy T = ½mv²; power P = F·v.

Quick reference

Strength of Materials and Structural Analysis

  • Axial stress σ = N/A; axial strain ε = ΔL/L; Hooke's law σ = E·ε applies within the elastic limit, with E in GPa for steel (about 200 GPa).

  • Elongation of an axially loaded bar: ΔL = N·L/(A·E); for stepped or varying loads sum the contributions of each segment.

  • Bending stress: σ = M·y/I, maximum at the extreme fibre with y = c; section modulus W = I/c gives σmax = M/W.

  • Second moment of area for a rectangle about its centroidal axis: I = b·h³/12; parallel axis theorem I = I_c + A·d².

  • Shear stress in bending: τ = V·Q/(I·b); τ is zero at the extreme fibres and maximum at the neutral axis for a rectangular section.

  • Deflection of a simply supported beam under central point load P: δmax = P·L³/(48·E·I) at midspan.

  • Euler buckling load for a pin-ended column: Pcr = π²·E·I/L²; effective length factors reduce capacity for other end conditions.

  • Determinacy of a plane truss: m + r = 2j for statically determinate; m + r > 2j indicates redundancy, m + r < 2j indicates instability.

Quick reference

Construction Materials and Technology

  • Concrete characteristic strength fck is the 28-day cube strength below which no more than 5% of test results should fall; cylinder strength ≈ 0.8 × cube strength.

  • Concrete mix design targets water/cement ratio and exposure class; lower w/c increases strength and durability but reduces workability.

  • Cement types: CEM I (Portland), CEM II (Portland-composite), CEM III (blastfurnace), CEM IV (pozzolanic), CEM V (composite); sulfate-resistant and low-heat grades are selected for aggressive ground or mass pours.

  • Reinforcement: B500 deformed bars have characteristic yield strength 500 MPa; nominal cover is set by exposure class and fire resistance, not by bar diameter alone.

  • Concrete curing must retain moisture; stripping times depend on member type and achieved strength, typically verified by cube tests or maturity methods.

  • Masonry: mortar designation (M2.5 to M12) is chosen with unit strength; movement joints are required at intervals to accommodate thermal and moisture expansion.

  • Structural steel grade S275 or S355 denotes minimum yield strength in MPa; bolted connections use preloaded or bearing-type bolts per design category.

  • Bituminous mixtures are specified by aggregate gradation, binder grade and air voids; compaction temperature window is set by binder viscosity.

Quick reference

Construction Drawing

  • First-angle projection places the view from above below the front view; third-angle projection places it above; the projection symbol on the drawing identifies which system applies.

  • Scale notation 1:100 means 1 unit on the drawing equals 100 units on site; a 25 mm dimension on a 1:100 drawing represents 2.5 m.

  • Line hierarchy: continuous thick for visible outlines, continuous thin for dimension and projection lines, dashed for hidden edges, chain lines for centre lines and section planes.

  • A section drawing is identified by cutting-plane line with arrows showing viewing direction and by a section label (e.g. A-A).

  • Levels are annotated with a datum symbol and value in metres to three decimals, e.g. +3.450; the project datum is stated on the drawing title block.

  • Reinforcement drawings use bar marks with diameter, spacing and shape code; the bending schedule lists total lengths and weights per bar mark.

  • Drawing register and revision control: superseded drawings must be marked, and only the latest revision is valid for construction.

Quick reference

Surveying and Measurement

  • Levelling: height difference between two points = backsight reading − foresight reading; reduced level = known RL + backsight − foresight (height of collimation method).

  • Rise and fall method checks that Σbacksight − Σforesight = Σrise − Σfall = last RL − first RL.

  • Closed traverse angular check: sum of measured interior angles should equal (n−2)·180°; misclosure is distributed equally among the angles.

  • Coordinate computation from bearing and distance: ΔE = d·sinθ, ΔN = d·cosθ, with bearings measured clockwise from north.

  • Total station measures slope distance, then horizontal distance = slope distance × cos(vertical angle); EDM accuracy is quoted as ±(a + b ppm).

  • Volume by end areas: V = L·(A₁ + A₂)/2 for a prismoid segment; prismoidal formula V = L·(A₁ + 4Am + A₂)/6 is more accurate.

  • Setting out: right angles by 3-4-5 triangle or by theodolite; a baseline is established first and offsets are measured perpendicular to it.

  • Tolerance for setting out is project-specific; structural grid lines are typically checked against the design coordinates before any concrete is placed.

Quick reference

Building Services and Environmental Systems

  • Electrical supply in Cyprus is 230 V single-phase, 50 Hz; three-phase distribution is 400 V between phases.

  • Protection: an RCD rated 30 mA is required for socket circuits and wet areas; MCBs protect against overload and short circuit and are selected to the cable current-carrying capacity.

  • Earthing system types (TN-S, TN-C-S, TT) determine the protective measures and the need for an earth electrode at the installation.

  • Plumbing: hot water distribution uses a secondary return or is kept short to limit dead legs; pressure-reducing valves are fitted where mains pressure exceeds fixture rating.

  • Drainage: soil and waste stacks require ventilation to prevent trap seal loss; trap seals are nominally 50 mm minimum.

  • HVAC sizing: heating load by fabric transmission plus ventilation; cooling load includes solar gains, internal gains and latent load, not just temperature difference.

  • Ventilation rates are set per occupancy and use; mechanical extract is required in kitchens and sanitary spaces without openable windows.

  • Fire detection and alarm systems are zoned to limit the search area; sounders must achieve the specified sound pressure level at the bedhead or in occupied rooms.

Quick reference

Health, Safety and Site Organization

  • Hierarchy of control: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment as the last line of defence.

  • Working at height is the leading cause of fatal construction accidents; collective protection (guardrails, nets) takes priority over personal fall arrest.

  • Excavations: support or batter sides, keep spoil back from the edge, provide ladders within 25 m of travel, and inspect after rain or any ground movement.

  • Scaffolding must be erected, altered and dismantled by competent persons; it is inspected before first use and at intervals not exceeding 7 days.

  • Site induction and task-specific briefing are required before any worker starts; visitors must be escorted and issued PPE.

  • Site layout: separate pedestrian and vehicle routes, locate storage and plant away from excavations, and position welfare facilities within reasonable distance of the works.

  • Emergency arrangements: fire points, escape routes, assembly point, first-aid provision and emergency contact numbers are displayed on site.

  • Lifting operations require a plan by a competent person; exclusion zones are maintained beneath suspended loads and no person may ride on a load.

Quick reference

Technical Legislation, Standards and Contracts

  • Building permits: construction may not start before the planning and building permit is issued by the competent authority; deviations require a revised permit.

  • Cyprus building regulation references include the national seismic design provisions aligned with Eurocode 8 and the Eurocodes adopted as national standards.

  • Contract forms allocate risk: lump-sum contracts place quantity risk on the contractor; measurement (re-measurement) contracts pay for actual quantities executed.

  • Variations must be instructed in writing by the contract administrator; without a written instruction, the contractor's entitlement to payment is weak.

  • Time provisions: extension of time is granted for employer-risk events; liquidated damages apply for culpable delay at a stated rate per day.

  • Retention is typically deducted from interim payments and released in two parts - on practical completion and after the defects liability period.

  • Interim payment certificates are issued at stated intervals; the contractor submits an application and the certifier assesses the value of work executed.

  • Health and safety duties are imposed on the client, designer and contractor, who must cooperate and coordinate; the client must appoint competent persons.

Quick reference

Project Costing, Estimating and Quality Control

  • Unit-rate estimating: rate = labour + material + plant + subcontract + overheads + profit, expressed per unit of measurement (m³, m², m, nr).

  • Labour output is expressed as hours per unit; cost = hours × hourly rate including social insurance and allowances.

  • Quantity take-off follows the measurement rules of the chosen standard method; items are grouped by work section and measured net unless rules state otherwise.

  • Preliminaries (site establishment, supervision, temporary works, insurance) are priced separately and are not distributed into unit rates.

  • Cash flow and cost control use earned value: CPI = EV/AC and SPI = EV/PV; a CPI below 1.0 indicates cost overrun.

  • Contingency is an allowance for identified but unquantified risk; it is held in the estimate and released as risk is retired.

  • Quality control of concrete: slump test for workability, cube tests at 7 and 28 days for strength, and cover meter checks for reinforcement position.

  • Inspection and test plans (ITPs) define hold points where work cannot proceed without documented verification and sign-off.

Quick reference

Engineering Mechanics (Statics and Dynamics)

  • Equilibrium of a planar rigid body requires ΣFx = 0, ΣFy = 0, ΣM = 0 about any point; three independent equations solve three unknowns.

  • Moment of a force about a point: M = F·d, where d is the perpendicular distance from the point to the line of action; sign convention must be fixed before summing.

  • Resultant of a concurrent force system: Rx = ΣFx, Ry = ΣFy, R = √(Rx² + Ry²), direction θ = arctan(Ry/Rx) measured from the x-axis.

  • Centroid of a composite area: x̄ = Σ(Ai·x̄i)/ΣAi, ȳ = Σ(Ai·ȳi)/ΣAi; for a triangle the centroid lies at one-third of the height from the base.

  • Friction limit: impending sliding occurs when F = μs·N; kinetic friction F = μk·N applies once motion starts, with μk < μs.

  • Equations of motion for constant acceleration: v = u + at, s = ut + ½at², v² = u² + 2as; these apply only when a is constant.

  • Newton's second law for a particle: ΣF = m·a; for a rigid body in plane motion the couple equation ΣM_G = I_G·α is added.

  • Work-energy principle: U₁₋₂ = ΔT, where work by a constant force is F·s·cosθ and kinetic energy T = ½mv²; power P = F·v.

Quick reference

Strength of Materials and Structural Analysis

  • Axial stress σ = N/A; axial strain ε = ΔL/L; Hooke's law σ = E·ε applies within the elastic limit, with E in GPa for steel (about 200 GPa).

  • Elongation of an axially loaded bar: ΔL = N·L/(A·E); for stepped or varying loads sum the contributions of each segment.

  • Bending stress: σ = M·y/I, maximum at the extreme fibre with y = c; section modulus W = I/c gives σmax = M/W.

  • Second moment of area for a rectangle about its centroidal axis: I = b·h³/12; parallel axis theorem I = I_c + A·d².

  • Shear stress in bending: τ = V·Q/(I·b); τ is zero at the extreme fibres and maximum at the neutral axis for a rectangular section.

  • Deflection of a simply supported beam under central point load P: δmax = P·L³/(48·E·I) at midspan.

  • Euler buckling load for a pin-ended column: Pcr = π²·E·I/L²; effective length factors reduce capacity for other end conditions.

  • Determinacy of a plane truss: m + r = 2j for statically determinate; m + r > 2j indicates redundancy, m + r < 2j indicates instability.

Quick reference

Construction Materials and Technology

  • Concrete characteristic strength fck is the 28-day cube strength below which no more than 5% of test results should fall; cylinder strength ≈ 0.8 × cube strength.

  • Concrete mix design targets water/cement ratio and exposure class; lower w/c increases strength and durability but reduces workability.

  • Cement types: CEM I (Portland), CEM II (Portland-composite), CEM III (blastfurnace), CEM IV (pozzolanic), CEM V (composite); sulfate-resistant and low-heat grades are selected for aggressive ground or mass pours.

  • Reinforcement: B500 deformed bars have characteristic yield strength 500 MPa; nominal cover is set by exposure class and fire resistance, not by bar diameter alone.

  • Concrete curing must retain moisture; stripping times depend on member type and achieved strength, typically verified by cube tests or maturity methods.

  • Masonry: mortar designation (M2.5 to M12) is chosen with unit strength; movement joints are required at intervals to accommodate thermal and moisture expansion.

  • Structural steel grade S275 or S355 denotes minimum yield strength in MPa; bolted connections use preloaded or bearing-type bolts per design category.

  • Bituminous mixtures are specified by aggregate gradation, binder grade and air voids; compaction temperature window is set by binder viscosity.

Quick reference

Construction Drawing

  • First-angle projection places the view from above below the front view; third-angle projection places it above; the projection symbol on the drawing identifies which system applies.

  • Scale notation 1:100 means 1 unit on the drawing equals 100 units on site; a 25 mm dimension on a 1:100 drawing represents 2.5 m.

  • Line hierarchy: continuous thick for visible outlines, continuous thin for dimension and projection lines, dashed for hidden edges, chain lines for centre lines and section planes.

  • A section drawing is identified by cutting-plane line with arrows showing viewing direction and by a section label (e.g. A-A).

  • Levels are annotated with a datum symbol and value in metres to three decimals, e.g. +3.450; the project datum is stated on the drawing title block.

  • Reinforcement drawings use bar marks with diameter, spacing and shape code; the bending schedule lists total lengths and weights per bar mark.

  • Drawing register and revision control: superseded drawings must be marked, and only the latest revision is valid for construction.

Quick reference

Surveying and Measurement

  • Levelling: height difference between two points = backsight reading − foresight reading; reduced level = known RL + backsight − foresight (height of collimation method).

  • Rise and fall method checks that Σbacksight − Σforesight = Σrise − Σfall = last RL − first RL.

  • Closed traverse angular check: sum of measured interior angles should equal (n−2)·180°; misclosure is distributed equally among the angles.

  • Coordinate computation from bearing and distance: ΔE = d·sinθ, ΔN = d·cosθ, with bearings measured clockwise from north.

  • Total station measures slope distance, then horizontal distance = slope distance × cos(vertical angle); EDM accuracy is quoted as ±(a + b ppm).

  • Volume by end areas: V = L·(A₁ + A₂)/2 for a prismoid segment; prismoidal formula V = L·(A₁ + 4Am + A₂)/6 is more accurate.

  • Setting out: right angles by 3-4-5 triangle or by theodolite; a baseline is established first and offsets are measured perpendicular to it.

  • Tolerance for setting out is project-specific; structural grid lines are typically checked against the design coordinates before any concrete is placed.

Quick reference

Building Services and Environmental Systems

  • Electrical supply in Cyprus is 230 V single-phase, 50 Hz; three-phase distribution is 400 V between phases.

  • Protection: an RCD rated 30 mA is required for socket circuits and wet areas; MCBs protect against overload and short circuit and are selected to the cable current-carrying capacity.

  • Earthing system types (TN-S, TN-C-S, TT) determine the protective measures and the need for an earth electrode at the installation.

  • Plumbing: hot water distribution uses a secondary return or is kept short to limit dead legs; pressure-reducing valves are fitted where mains pressure exceeds fixture rating.

  • Drainage: soil and waste stacks require ventilation to prevent trap seal loss; trap seals are nominally 50 mm minimum.

  • HVAC sizing: heating load by fabric transmission plus ventilation; cooling load includes solar gains, internal gains and latent load, not just temperature difference.

  • Ventilation rates are set per occupancy and use; mechanical extract is required in kitchens and sanitary spaces without openable windows.

  • Fire detection and alarm systems are zoned to limit the search area; sounders must achieve the specified sound pressure level at the bedhead or in occupied rooms.

Quick reference

Health, Safety and Site Organization

  • Hierarchy of control: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment as the last line of defence.

  • Working at height is the leading cause of fatal construction accidents; collective protection (guardrails, nets) takes priority over personal fall arrest.

  • Excavations: support or batter sides, keep spoil back from the edge, provide ladders within 25 m of travel, and inspect after rain or any ground movement.

  • Scaffolding must be erected, altered and dismantled by competent persons; it is inspected before first use and at intervals not exceeding 7 days.

  • Site induction and task-specific briefing are required before any worker starts; visitors must be escorted and issued PPE.

  • Site layout: separate pedestrian and vehicle routes, locate storage and plant away from excavations, and position welfare facilities within reasonable distance of the works.

  • Emergency arrangements: fire points, escape routes, assembly point, first-aid provision and emergency contact numbers are displayed on site.

  • Lifting operations require a plan by a competent person; exclusion zones are maintained beneath suspended loads and no person may ride on a load.

Quick reference

Technical Legislation, Standards and Contracts

  • Building permits: construction may not start before the planning and building permit is issued by the competent authority; deviations require a revised permit.

  • Cyprus building regulation references include the national seismic design provisions aligned with Eurocode 8 and the Eurocodes adopted as national standards.

  • Contract forms allocate risk: lump-sum contracts place quantity risk on the contractor; measurement (re-measurement) contracts pay for actual quantities executed.

  • Variations must be instructed in writing by the contract administrator; without a written instruction, the contractor's entitlement to payment is weak.

  • Time provisions: extension of time is granted for employer-risk events; liquidated damages apply for culpable delay at a stated rate per day.

  • Retention is typically deducted from interim payments and released in two parts - on practical completion and after the defects liability period.

  • Interim payment certificates are issued at stated intervals; the contractor submits an application and the certifier assesses the value of work executed.

  • Health and safety duties are imposed on the client, designer and contractor, who must cooperate and coordinate; the client must appoint competent persons.

Quick reference

Project Costing, Estimating and Quality Control

  • Unit-rate estimating: rate = labour + material + plant + subcontract + overheads + profit, expressed per unit of measurement (m³, m², m, nr).

  • Labour output is expressed as hours per unit; cost = hours × hourly rate including social insurance and allowances.

  • Quantity take-off follows the measurement rules of the chosen standard method; items are grouped by work section and measured net unless rules state otherwise.

  • Preliminaries (site establishment, supervision, temporary works, insurance) are priced separately and are not distributed into unit rates.

  • Cash flow and cost control use earned value: CPI = EV/AC and SPI = EV/PV; a CPI below 1.0 indicates cost overrun.

  • Contingency is an allowance for identified but unquantified risk; it is held in the estimate and released as risk is retired.

  • Quality control of concrete: slump test for workability, cube tests at 7 and 28 days for strength, and cover meter checks for reinforcement position.

  • Inspection and test plans (ITPs) define hold points where work cannot proceed without documented verification and sign-off.

Quick reference

Engineering Mechanics (Statics and Dynamics)

  • Equilibrium of a planar rigid body requires ΣFx = 0, ΣFy = 0, ΣM = 0 about any point; three independent equations solve three unknowns.

  • Moment of a force about a point: M = F·d, where d is the perpendicular distance from the point to the line of action; sign convention must be fixed before summing.

  • Resultant of a concurrent force system: Rx = ΣFx, Ry = ΣFy, R = √(Rx² + Ry²), direction θ = arctan(Ry/Rx) measured from the x-axis.

  • Centroid of a composite area: x̄ = Σ(Ai·x̄i)/ΣAi, ȳ = Σ(Ai·ȳi)/ΣAi; for a triangle the centroid lies at one-third of the height from the base.

  • Friction limit: impending sliding occurs when F = μs·N; kinetic friction F = μk·N applies once motion starts, with μk < μs.

  • Equations of motion for constant acceleration: v = u + at, s = ut + ½at², v² = u² + 2as; these apply only when a is constant.

  • Newton's second law for a particle: ΣF = m·a; for a rigid body in plane motion the couple equation ΣM_G = I_G·α is added.

  • Work-energy principle: U₁₋₂ = ΔT, where work by a constant force is F·s·cosθ and kinetic energy T = ½mv²; power P = F·v.

Quick reference

Strength of Materials and Structural Analysis

  • Axial stress σ = N/A; axial strain ε = ΔL/L; Hooke's law σ = E·ε applies within the elastic limit, with E in GPa for steel (about 200 GPa).

  • Elongation of an axially loaded bar: ΔL = N·L/(A·E); for stepped or varying loads sum the contributions of each segment.

  • Bending stress: σ = M·y/I, maximum at the extreme fibre with y = c; section modulus W = I/c gives σmax = M/W.

  • Second moment of area for a rectangle about its centroidal axis: I = b·h³/12; parallel axis theorem I = I_c + A·d².

  • Shear stress in bending: τ = V·Q/(I·b); τ is zero at the extreme fibres and maximum at the neutral axis for a rectangular section.

  • Deflection of a simply supported beam under central point load P: δmax = P·L³/(48·E·I) at midspan.

  • Euler buckling load for a pin-ended column: Pcr = π²·E·I/L²; effective length factors reduce capacity for other end conditions.

  • Determinacy of a plane truss: m + r = 2j for statically determinate; m + r > 2j indicates redundancy, m + r < 2j indicates instability.

Quick reference

Construction Materials and Technology

  • Concrete characteristic strength fck is the 28-day cube strength below which no more than 5% of test results should fall; cylinder strength ≈ 0.8 × cube strength.

  • Concrete mix design targets water/cement ratio and exposure class; lower w/c increases strength and durability but reduces workability.

  • Cement types: CEM I (Portland), CEM II (Portland-composite), CEM III (blastfurnace), CEM IV (pozzolanic), CEM V (composite); sulfate-resistant and low-heat grades are selected for aggressive ground or mass pours.

  • Reinforcement: B500 deformed bars have characteristic yield strength 500 MPa; nominal cover is set by exposure class and fire resistance, not by bar diameter alone.

  • Concrete curing must retain moisture; stripping times depend on member type and achieved strength, typically verified by cube tests or maturity methods.

  • Masonry: mortar designation (M2.5 to M12) is chosen with unit strength; movement joints are required at intervals to accommodate thermal and moisture expansion.

  • Structural steel grade S275 or S355 denotes minimum yield strength in MPa; bolted connections use preloaded or bearing-type bolts per design category.

  • Bituminous mixtures are specified by aggregate gradation, binder grade and air voids; compaction temperature window is set by binder viscosity.

Quick reference

Construction Drawing

  • First-angle projection places the view from above below the front view; third-angle projection places it above; the projection symbol on the drawing identifies which system applies.

  • Scale notation 1:100 means 1 unit on the drawing equals 100 units on site; a 25 mm dimension on a 1:100 drawing represents 2.5 m.

  • Line hierarchy: continuous thick for visible outlines, continuous thin for dimension and projection lines, dashed for hidden edges, chain lines for centre lines and section planes.

  • A section drawing is identified by cutting-plane line with arrows showing viewing direction and by a section label (e.g. A-A).

  • Levels are annotated with a datum symbol and value in metres to three decimals, e.g. +3.450; the project datum is stated on the drawing title block.

  • Reinforcement drawings use bar marks with diameter, spacing and shape code; the bending schedule lists total lengths and weights per bar mark.

  • Drawing register and revision control: superseded drawings must be marked, and only the latest revision is valid for construction.

Quick reference

Surveying and Measurement

  • Levelling: height difference between two points = backsight reading − foresight reading; reduced level = known RL + backsight − foresight (height of collimation method).

  • Rise and fall method checks that Σbacksight − Σforesight = Σrise − Σfall = last RL − first RL.

  • Closed traverse angular check: sum of measured interior angles should equal (n−2)·180°; misclosure is distributed equally among the angles.

  • Coordinate computation from bearing and distance: ΔE = d·sinθ, ΔN = d·cosθ, with bearings measured clockwise from north.

  • Total station measures slope distance, then horizontal distance = slope distance × cos(vertical angle); EDM accuracy is quoted as ±(a + b ppm).

  • Volume by end areas: V = L·(A₁ + A₂)/2 for a prismoid segment; prismoidal formula V = L·(A₁ + 4Am + A₂)/6 is more accurate.

  • Setting out: right angles by 3-4-5 triangle or by theodolite; a baseline is established first and offsets are measured perpendicular to it.

  • Tolerance for setting out is project-specific; structural grid lines are typically checked against the design coordinates before any concrete is placed.

Quick reference

Building Services and Environmental Systems

  • Electrical supply in Cyprus is 230 V single-phase, 50 Hz; three-phase distribution is 400 V between phases.

  • Protection: an RCD rated 30 mA is required for socket circuits and wet areas; MCBs protect against overload and short circuit and are selected to the cable current-carrying capacity.

  • Earthing system types (TN-S, TN-C-S, TT) determine the protective measures and the need for an earth electrode at the installation.

  • Plumbing: hot water distribution uses a secondary return or is kept short to limit dead legs; pressure-reducing valves are fitted where mains pressure exceeds fixture rating.

  • Drainage: soil and waste stacks require ventilation to prevent trap seal loss; trap seals are nominally 50 mm minimum.

  • HVAC sizing: heating load by fabric transmission plus ventilation; cooling load includes solar gains, internal gains and latent load, not just temperature difference.

  • Ventilation rates are set per occupancy and use; mechanical extract is required in kitchens and sanitary spaces without openable windows.

  • Fire detection and alarm systems are zoned to limit the search area; sounders must achieve the specified sound pressure level at the bedhead or in occupied rooms.

Quick reference

Health, Safety and Site Organization

  • Hierarchy of control: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment as the last line of defence.

  • Working at height is the leading cause of fatal construction accidents; collective protection (guardrails, nets) takes priority over personal fall arrest.

  • Excavations: support or batter sides, keep spoil back from the edge, provide ladders within 25 m of travel, and inspect after rain or any ground movement.

  • Scaffolding must be erected, altered and dismantled by competent persons; it is inspected before first use and at intervals not exceeding 7 days.

  • Site induction and task-specific briefing are required before any worker starts; visitors must be escorted and issued PPE.

  • Site layout: separate pedestrian and vehicle routes, locate storage and plant away from excavations, and position welfare facilities within reasonable distance of the works.

  • Emergency arrangements: fire points, escape routes, assembly point, first-aid provision and emergency contact numbers are displayed on site.

  • Lifting operations require a plan by a competent person; exclusion zones are maintained beneath suspended loads and no person may ride on a load.

Quick reference

Technical Legislation, Standards and Contracts

  • Building permits: construction may not start before the planning and building permit is issued by the competent authority; deviations require a revised permit.

  • Cyprus building regulation references include the national seismic design provisions aligned with Eurocode 8 and the Eurocodes adopted as national standards.

  • Contract forms allocate risk: lump-sum contracts place quantity risk on the contractor; measurement (re-measurement) contracts pay for actual quantities executed.

  • Variations must be instructed in writing by the contract administrator; without a written instruction, the contractor's entitlement to payment is weak.

  • Time provisions: extension of time is granted for employer-risk events; liquidated damages apply for culpable delay at a stated rate per day.

  • Retention is typically deducted from interim payments and released in two parts - on practical completion and after the defects liability period.

  • Interim payment certificates are issued at stated intervals; the contractor submits an application and the certifier assesses the value of work executed.

  • Health and safety duties are imposed on the client, designer and contractor, who must cooperate and coordinate; the client must appoint competent persons.

Quick reference

Project Costing, Estimating and Quality Control

  • Unit-rate estimating: rate = labour + material + plant + subcontract + overheads + profit, expressed per unit of measurement (m³, m², m, nr).

  • Labour output is expressed as hours per unit; cost = hours × hourly rate including social insurance and allowances.

  • Quantity take-off follows the measurement rules of the chosen standard method; items are grouped by work section and measured net unless rules state otherwise.

  • Preliminaries (site establishment, supervision, temporary works, insurance) are priced separately and are not distributed into unit rates.

  • Cash flow and cost control use earned value: CPI = EV/AC and SPI = EV/PV; a CPI below 1.0 indicates cost overrun.

  • Contingency is an allowance for identified but unquantified risk; it is held in the estimate and released as risk is retired.

  • Quality control of concrete: slump test for workability, cube tests at 7 and 28 days for strength, and cover meter checks for reinforcement position.

  • Inspection and test plans (ITPs) define hold points where work cannot proceed without documented verification and sign-off.