- Static equilibrium equations
- For a planar rigid body, ΣFx = 0, ΣFy = 0 and ΣM = 0 about any chosen point. These three independent equations allow solution of up to three unknown reactions.
- Moment of a force
- The product M = F × d, where d is the perpendicular distance from the reference point to the line of action of the force. Units are newton-metres and the sign depends on rotation direction.
- Coefficient of friction
- Ratio of limiting friction force to normal reaction. The static coefficient applies at impending motion and exceeds the kinetic coefficient, which applies once sliding has begun.
- Constant acceleration kinematics
- Three relations link velocity, displacement and time when acceleration is uniform: v = u + at, s = ut + ½at², and v² = u² + 2as. They fail for varying acceleration.
- Axial stress and strain
- Normal stress equals axial force divided by cross-sectional area. Strain is change in length divided by original length, and Hooke's law links them through the elastic modulus.
- Section modulus
- The ratio W = I/c of second moment of area to distance from the neutral axis to the extreme fibre. Maximum bending stress in a section equals bending moment divided by section modulus.
- Parallel axis theorem
- Second moment of area about any axis equals the value about the parallel centroidal axis plus area times the square of the distance between the axes.
- Euler buckling load
- Critical load for a slender pin-ended column is π²EI divided by the square of its length. Other end fixities are handled by an effective length factor applied to the actual length.
- Characteristic concrete strength
- The 28-day strength below which no more than five percent of standard cube test results should fall. Design calculations apply partial safety factors to this characteristic value.
- Water-cement ratio
- Mass of water divided by mass of cement in a mix. Lowering it raises strength and durability but reduces workability, so admixtures or adjusted aggregate grading may be needed.
- Nominal concrete cover
- Distance from the outer concrete surface to the nearest reinforcement surface. It is set by exposure class for durability and by fire resistance requirements, not chosen freely.
- Steel grade S355
- Designation for structural steel with a specified minimum yield strength of 355 MPa for the relevant thickness range. Higher grades permit smaller sections for the same applied load.
- First-angle projection
- A drawing convention in which the object sits between observer and projection plane, so the view from above appears below the front view. The projection symbol identifies the system used.
- Drawing scale 1:50
- One unit on the paper represents fifty units on site. A 20 mm measured length on such a drawing corresponds to one metre of actual construction.
- Cutting plane line
- A chain line with thick ends and arrows showing the direction of viewing, labelled to match the section drawing it produces. It marks where the object is notionally cut.
- Bar bending schedule
- A table listing each reinforcement bar mark with diameter, shape code, number of bars, cut length and total weight, used for fabrication and for checking steel delivered to site.
- Height of collimation method
- Levelling reduction in which a collimation height is computed as known reduced level plus backsight, then each new level is that height minus its foresight reading.
- Traverse angular misclosure
- Difference between the sum of measured interior angles and the theoretical (n−2)×180 degrees for an n-sided closed traverse. It is distributed equally among the measured angles.
- Bearing and coordinate change
- For a line of length d on bearing θ measured clockwise from north, the easting change is d·sinθ and the northing change is d·cosθ.
- Prismoidal volume formula
- Volume of a segment equals length divided by six, multiplied by the sum of the two end areas plus four times the mid-section area. It is more accurate than the mean end-area method.
- Residual current device
- A protective device that trips when the difference between live and neutral currents exceeds its rated sensitivity, typically 30 mA for socket and wet-area circuits.
- Trap seal depth
- The vertical water depth retained in a sanitary fitting trap, nominally at least 50 mm, which blocks foul air from the drainage stack entering the room.
- Cooling load components
- Total cooling load combines fabric and glazing transmission, solar gain, internal gains from people, lighting and equipment, plus the latent load of moisture.
- Earthing system TT
- An installation whose exposed conductive parts connect to a local earth electrode independent of the supply neutral earth. It normally requires residual current protection for fault disconnection.
- Hierarchy of control
- Order of risk reduction: eliminate the hazard, substitute, apply engineering controls, then administrative controls, with personal protective equipment last because it protects only the wearer.
- Scaffold inspection interval
- Scaffolds must be inspected by a competent person before first use, after alteration or adverse weather, and at intervals not exceeding seven days while in service.
- Excavation inspection
- Sides and supports of an excavation must be inspected at the start of each shift and after any event such as heavy rain or ground movement that could affect stability.
- Lifting plan
- A documented method prepared by a competent person covering load weight, crane capacity and radius, rigging, ground conditions and the exclusion zone beneath the load.
- Lump-sum contract
- An agreement for a fixed price to complete defined works. Quantity risk generally rests with the contractor, who is paid the stated sum regardless of actual measured quantities.
- Retention in construction contracts
- A percentage withheld from interim payments as security for performance. It is usually released in two parts, at practical completion and after the defects liability period.
- Liquidated damages
- A pre-agreed sum per day of culpable delay beyond the completion date, representing the employer's estimated loss. It must be a genuine estimate, not a penalty.
- Earned value cost index
- Cost performance index equals earned value divided by actual cost. A value below one means the work completed has cost more than budgeted for that progress.