DC HVAC · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Data Centre Cooling Fundamentals & Cooling Capacity, Loads and Efficiency Metrics

  • Explain the three heat transfer modes with one data hall example each for conduction, convection and radiation

  • Convert between kW, tons of refrigeration and BTU/h for five sample IT loads without a calculator error

  • Define sensible heat ratio and compute it for a mixed IT-plus-humidification load

  • Sketch the psychrometric chart axes and label dry bulb, wet bulb, dew point and enthalpy lines

  • Distinguish design conditions, part-load conditions and ASHRAE allowable envelopes for IT equipment intake

Your checkpoint

A one-page formula sheet plus five fully worked load and unit-conversion problems with answers checked against a second method

Week 2

Cooling Capacity, Loads and Efficiency Metrics & Data Centre Cooling Fundamentals

  • Decompose a data centre load into IT, lighting, UPS losses, fan energy, envelope and humidification components

  • Calculate PUE, pPUE and partial PUE for a worked example and explain which boundary each uses

  • Compute cooling capacity required for a stated IT load at a given redundancy level (N+1, 2N)

  • Explain how altitude, ambient design temperature and humidity setpoints shift available capacity

  • Interpret a simple annual load duration curve and estimate hours spent below 50 percent load

Your checkpoint

A load calculation workbook for a 500 kW IT hall showing component breakdown, design cooling capacity and PUE at 100, 75 and 50 percent load

Week 3

HVAC System Components and Configurations & Data Centre Cooling Fundamentals

  • Describe chilled water, direct expansion, and air-cooled versus water-cooled condenser configurations with their trade-offs

  • Trace refrigerant flow through a vapour compression cycle and label each state point on a pressure-enthalpy sketch

  • Compare computer room air conditioner, in-row, in-rack and rear-door heat exchanger units by application

  • Explain economiser types (air-side, water-side, refrigerant-side) and the climate conditions each needs

  • Identify the role of pumps, valves, cooling towers, chillers and buffer tanks in a chilled water loop

Your checkpoint

A labelled system schematic for two different cooling architectures with a 150-word trade-off comparison of each

Week 4

HVAC System Components and Configurations & Airflow Management and Containment

  • Calculate required supply airflow from sensible load and a chosen temperature differential

  • Explain the difference between open aisle, hot aisle containment, cold aisle containment and full enclosure

  • Identify bypass airflow, recirculation and leakage paths on a given rack layout description

  • Apply the concept of air change rate and perforated tile free area to a raised floor design

  • Describe how rack inlet temperature varies across a row and why the hottest inlet governs

Your checkpoint

A containment decision matrix covering four scenarios plus a worked airflow calculation showing bypass percentage for one scenario

Week 5

Airflow Management and Containment & Cooling Capacity, Loads and Efficiency Metrics

  • Compute return temperature index and bypass ratio from given supply, return and rack inlet temperatures

  • Evaluate the effect of blanking panels, brush strips and sealed cable entries on recirculation

  • Explain how containment changes economiser hours and PUE

  • Size a CRAC or CRAH unit count for a given load with redundancy, including airflow per unit

  • Describe commissioning tests for airflow: thermal imaging, CFD comparison and tracer methods

Your checkpoint

A 400-word airflow audit report for a described 20-rack hall listing at least five defects and a quantified fix for each

Week 6

HVAC Operations, Maintenance and Energy Efficiency & HVAC System Components and Configurations

  • Build a preventive maintenance calendar covering filters, belts, coils, condensate drains, chillers and cooling towers

  • Explain water treatment risks in cooling towers and evaporative systems and the controls used

  • Compare setpoint strategies: supply air temperature reset, chilled water temperature reset and deadband control

  • Describe common failure modes such as loss of condenser water, refrigerant leak and fan failure, with detection methods

  • Outline a change management process for a setpoint change including risk review

Your checkpoint

A 12-month maintenance schedule table with task frequency, owner role and a documented escalation path for two critical alarms

Week 7

HVAC Operations, Maintenance and Energy Efficiency & Cooling Capacity, Loads and Efficiency Metrics

  • Interpret trend data to spot simultaneous heating and cooling, valve hunting and sensor drift

  • Calculate energy savings from a supply air temperature reset using degree-hours or a simple bin method

  • Explain free cooling hours estimation and compare it against actual economiser runtime

  • Apply ASHRAE or equivalent energy audit levels to a data centre and list what each level requires

  • Draft a corrective action for a hall running at PUE 1.9 with a target of 1.4

Your checkpoint

An energy improvement proposal with three measures, each with estimated annual kWh and cost savings and a payback figure

Week 8

Data Centre Cooling Fundamentals & HVAC System Components and Configurations & Airflow Management and Containment & Cooling Capacity, Loads and Efficiency Metrics & HVAC Operations, Maintenance and Energy Efficiency

  • Re-derive every formula from weeks 1 to 7 from memory and check against your formula sheet

  • Complete a timed mixed-topic practice set and log errors by domain

  • Re-teach the three weakest topics in writing without notes

  • Review flagged uncertain facts and confirm each against a reliable reference

  • Simulate explaining a full cooling design to a non-specialist in five minutes

Your checkpoint

A timed 60-question mixed practice set scored by domain with a written remediation list for any domain scoring below 75 percent

Milestones

Week 2: Can compute PUE, sensible heat ratio and design cooling capacity for a new scenario unaided in under 15 minutes with correct units

Week 4: Can explain containment options and calculate supply airflow and bypass percentage from raw temperatures without notes

Week 6: Can produce a maintenance schedule and name the detection method for at least four common failure modes

Week 8: Mixed practice set scored at or above 75 percent in every domain, with all flagged facts resolved