EASA ATPL 033 Flight Planning study materials
EASA ATPL 033 Flight Planning study resources

EASA ATPL 033 Flight Planning cheat sheet

EASA ATPL 033 Flight Planning · Keep the key ideas within reach.

Quick reference

Flight Plans: Content, Filing and ATS Form

  • ICAO ATS flight plan (FPL) is filed at least 60 minutes before departure for IFR flights on published ATS routes; earlier filing may be required by the State of departure.

  • FPL field 15 (route) uses ATS route designators with significant points, change of speed/level, and FIR boundary points; DCT is used only where direct routing is permitted.

  • Field 16 (destination/alternate) lists total EET to destination, then up to two en-route alternates; destination alternates go in field 16 only when required by the rules.

  • Field 19 carries supplementary information: endurance in hours/minutes, persons on board, emergency radio, survival equipment, and dinghies.

  • A CHG message amends speed, level, route or EET; a CNL cancels the FPL; DEP/ARR messages are sent by ATS, not by the pilot.

  • If a flight is delayed beyond the filed EOBT by more than 30 minutes (or the State-prescribed limit), the FPL must be amended or refiled.

  • An FPL becomes active at EOBT; after airborne the pilot uses position reports and, where required, ADS-C/CPDLC to maintain the ATS picture.

  • A flight plan must be closed on arrival, or SAR action may be initiated; closing is automatic at controlled aerodromes with ATS.

Quick reference

Fuel Planning: Policy and Reserves

  • Trip fuel = fuel from take-off to landing at destination, computed along the planned route with forecast winds and planned levels.

  • Contingency fuel = 5% of trip fuel, or 3% with a suitable en-route alternate, or a statistical/time-based equivalent where approved by the operator's authority.

  • Alternate fuel = fuel from destination go-around to landing at the destination alternate, including approach, missed approach and climb.

  • Final reserve fuel: 30 minutes holding at 1500 ft above the alternate aerodrome in ISA conditions (turbine aircraft); it must be protected and never planned for use.

  • Taxi fuel covers APU/engine start, taxi-out and taxi-in; it is not part of trip fuel and is excluded from the fuel-to-destination calculation.

  • Additional fuel is added when the fuel required to reach a suitable alternate from the most critical point exceeds trip + contingency + alternate + final reserve.

  • Extra fuel is discretionary and commanded by the commander; it is not a substitute for any mandatory reserve.

  • Minimum fuel and MAYDAY FUEL: declare MINIMUM FUEL when landing would be below final reserve; declare MAYDAY FUEL when predicted landing fuel is below final reserve.

Quick reference

Pre-Flight Planning: Routes, Levels and Airspace

  • IFR flights normally follow the ATS route structure; airway designators (e.g. A, B, G, R, L, M, N, UL, UN) encode type and region.

  • Airway levels are constrained by semicircular cruising level tables (odd/even thousands) based on magnetic track; RVSM applies between FL290 and FL410.

  • Airspace classes A to G differ in ATC service and clearance requirements; class A is IFR only, class G is uncontrolled with no clearance required.

  • Prohibited, restricted and danger areas (P, R, D) are published in State AIPs; temporary reservations (TRA/TSA) are notified by NOTAM or AUP.

  • Minimum en-route altitudes (MEA/MORA) must be respected; MORA is a 1000 ft (2000 ft in mountainous terrain) obstacle clearance over a 10 NM grid.

  • Route selection considers NOTAM closures, airway restrictions, overflight permits, and ETOPS/EDTO diversion capability for twin-engine aircraft.

  • Level selection balances winds aloft, temperature deviation, tropopause height, and step-climb opportunities against fuel burn.

Quick reference

Navigation Plan Calculations

  • True airspeed (TAS) from IAS/Mach corrected for pressure altitude and temperature; use the flight computer or AFM tables.

  • Wind triangle: track (T) and wind velocity (W/V) give heading (H) and groundspeed (GS); drift = T - H, sign convention matters.

  • GS = TAS + wind component along track; headwind reduces GS, tailwind increases it.

  • Leg time = distance / GS; total elapsed time = sum of leg times + taxi + climb/descent allowances.

  • Crab angle = arcsin( (W/V sin(W - T)) / TAS ); wind correction angle is applied opposite to drift.

  • For multi-leg routes, recompute wind triangle at each significant point where wind or track changes; do not reuse a single GS.

  • Time to equal time point (ETP): t = (D x GS_out) / (GS_out + GS_in) when the two GS are known for the two directions.

Quick reference

Airplane Performance in Planning

  • Take-off performance from AFM charts: field length, climb gradient (2nd segment), obstacle clearance, and tyre speed limits; must satisfy all four.

  • Climb: use AFM climb tables for time, fuel, and distance for each segment (take-off, en-route, approach); integrated into trip fuel.

  • Cruise: long-range cruise (LRC) versus maximum-range cruise (MRC) versus high-speed cruise; LRC gives about 1% better specific range than MRC at higher speed.

  • Descent and approach fuel are included in trip fuel; use AFM descent tables for time, fuel and distance from cruise level to approach.

  • Landing performance: landing distance required (LDR) must be within the declared landing distance available (LDA) with the required factor.

  • Performance-limited take-off mass and landing mass must be checked against field length, obstacle, climb and brake energy limits.

  • Use the correct chart conditions: pressure altitude, OAT, wind component, runway slope, contamination; interpolate linearly between chart lines.

Quick reference

Mass and Balance

  • Maximum structural masses: MTOM, MLM, MZFM, MRW; the planned mass must not exceed any applicable limit.

  • MZFM = MTOM minus fuel; it protects the wing structure when fuel is low and the fuselage is heavy.

  • Centre of gravity (CG) must lie within the certified forward and aft limits for take-off and landing; forward CG raises stall speed and pitch forces, aft CG reduces stability.

  • Loading: compute moments (mass x arm) for each station, sum, and divide by total mass to get CG; use the load sheet and trim sheet.

  • Regulated take-off mass (RTOM) is the lower of MTOM, performance-limited TOM, and field-length-limited TOM.

  • Regulated landing mass (RLM) is the lower of MLM and landing-performance-limited LM.

  • Last-minute changes (LMC) must be reflected on the load sheet; the commander signs the final load sheet before departure.

Quick reference

In-Flight Monitoring and Replanning

  • Position reports include identification, position, time, level, next position and ETA; ADS-C/CPDLC may replace voice reports where approved.

  • Revised estimates are transmitted to ATS when the ETA at the next point differs from the filed estimate by a prescribed margin (typically 2-3 minutes).

  • Diversion decision: compare fuel required to reach the alternate against fuel remaining; use the ETP or critical point as the decision boundary.

  • Alternate planning: the destination alternate must be forecast to be above landing minima at ETA; en-route alternates must meet runway and approach requirements.

  • Fuel monitoring: compare actual fuel burn to planned burn at each waypoint; a persistent positive deviation requires a replan or diversion.

  • Replanning in flight may involve a new route, level or alternate; the ATS flight plan must be amended (CHG) and the operator informed.

  • Equal time point (ETP) and point of no return (PNR) define when diversion to an alternate becomes critical; compute with actual winds.

Quick reference

Flight Documentation

  • Operational flight plan (OFP) contains route, levels, winds, temperatures, fuel figures, mass data, and alternates; signed by the commander.

  • Load sheet: dry operating mass, traffic load, take-off fuel, trip fuel, take-off mass, landing mass, CG position, and LMC entries.

  • ATS flight plan (FPL) is the filed ICAO form; the pilot retains a copy and must be able to produce it.

  • Meteorological documentation: TAF, METAR, SIGMET, AIRMET, winds/temperatures aloft, and significant weather charts.

  • NOTAM documentation: check for runway closures, navaid outages, airspace restrictions, and temporary obstacles along the route.

  • AIP and route manuals provide airway structure, ATS units, and State rules; Jeppesen or equivalent charts are the standard reference.

  • Documentation must be retained for the operator's prescribed period; the commander is responsible for its accuracy.

Quick reference

Long-Range and Extended-Range Planning

  • ETOPS/EDTO applies to twin-engine (and some four-engine) aircraft operating more than 60 minutes from a suitable alternate at the one-engine-inoperative cruise speed.

  • EDTO diversion time is the approved maximum time from the ETP to the alternate at the approved one-engine-inoperative speed, in ISA conditions.

  • Equal time point (ETP): the point where time to the two alternates is equal; computed with forecast winds for the diversion speed.

  • Critical fuel scenario: fuel required from the ETP to the alternate with one engine inoperative, decompression, and icing, plus reserves.

  • En-route alternates for EDTO must meet runway, approach, weather, and rescue/fire-fighting requirements at the planned ETA.

  • EDTO entry/exit points define the segment where the diversion time limit applies; they are planned and filed in the FPL route.

  • If an EDTO alternate becomes unavailable in flight, replan to the next suitable alternate and inform ATS and the operator.

Quick reference

Practical Flight-Planning Exercise

  • Step 1: select route and levels; obtain winds and temperatures for the planned levels.

  • Step 2: compute TAS, GS, leg times, and total elapsed time for each leg.

  • Step 3: compute trip fuel from leg times and fuel flow; add contingency, alternate, final reserve, taxi, and additional fuel.

  • Step 4: check take-off, climb, cruise, descent, and landing performance against AFM charts and declared distances.

  • Step 5: compute mass and balance; verify MTOM, MLM, MZFM, and CG limits; produce the load sheet.

  • Step 6: verify fuel versus performance-limited mass; iterate if the planned mass exceeds a limit.

  • Step 7: file the ATS flight plan and complete the operational flight plan; brief the crew on alternates and reserves.

Quick reference

Flight Plans: Content, Filing and ATS Form (supplement)

  • FPL item 7 (aircraft identification) uses the registration or the operator's 3-letter designator plus flight number.

  • Item 8 (flight rules and type of flight) encodes IFR/VFR/Y/Z and scheduled/non-scheduled/private.

  • Item 9 (type of aircraft and wake turbulence category) uses ICAO type designators (e.g. B738, A320) and L/M/H/J.

  • Item 10 (equipment) lists COM/NAV/SSR capabilities; item 18 (other information) carries EET/ALTN, REG/, SEL/, and ETOPS/EDTO data.

  • Item 13 (departure aerodrome and time) uses the EOBT in UTC; item 16 gives destination and total EET.

  • Item 15 route field uses the format: significant point, airway designator, significant point; change of level is encoded as /FLxxx.

  • FPL must be filed with the ATS unit serving the departure aerodrome; the unit forwards it to adjacent FIRs.

Quick reference

Fuel Planning: Policy and Reserves (supplement)

  • Fuel policy must ensure that at any point the fuel remaining is at least the fuel required to reach the destination alternate plus final reserve.

  • For a destination with no suitable alternate, the fuel required to hold for 30 minutes at 1500 ft above the destination is added.

  • Isolated aerodrome procedure: additional fuel to fly to a suitable alternate if the destination becomes unavailable.

  • Fuel tankering may be used for cost reasons but must not compromise the required reserves or landing mass.

  • Fuel density (kg/L) varies with temperature; use the actual density for uplift calculations, not a fixed 0.8 kg/L.

  • In-flight fuel checks: compare fuel remaining with the planned figure at each waypoint; log deviations and act on trends.

  • If the destination alternate is not required (weather above minima), the alternate fuel may be omitted only if the operator's policy permits.

Quick reference

Pre-Flight Planning: Routes, Levels and Airspace (supplement)

  • Airway direction is defined by the semicircular rule: magnetic tracks 000-179 use odd levels, 180-359 use even levels.

  • RVSM airspace (FL290-FL410) requires approved equipment, height-keeping performance, and pilot training.

  • Reduced vertical separation minima apply only to approved aircraft; non-approved aircraft must fly outside RVSM levels.

  • Airspace classes: A (IFR only), B (IFR and VFR, all separated), C (IFR separated from VFR), D (IFR/VFR, traffic info), E (IFR separated, VFR info), F (advisory), G (uncontrolled).

  • Special use airspace: prohibited (P), restricted (R), danger (D), temporary reserved (TRA), temporary segregated (TSA).

  • Overflight permits are required for many States; check the AIP and the operator's permit database before filing.

  • Route charges and Eurocontrol IFPS validation may reject an FPL if the route does not comply with the RAD (Route Availability Document).

Quick reference

Navigation Plan Calculations (supplement)

  • Mach number = TAS / local speed of sound; speed of sound depends on temperature only (approx. 38.94 x sqrt(T) kt with T in Kelvin).

  • Conversion: 1 NM = 1.852 km; 1 kt = 1 NM/h; 1 ft = 0.3048 m.

  • Wind component along track = W/V speed x cos(wind direction - track); crosswind = W/V speed x sin(wind direction - track).

  • Drift angle = arcsin(crosswind / TAS); heading = track - drift (for wind from the left, add drift).

  • GS = TAS x cos(drift) + wind component along track; for small drift, GS approx TAS + wind component.

  • Time to climb/descent from AFM tables must be added to the cruise leg time for total elapsed time.

  • Fuel burn = fuel flow x time; for a leg, fuel = FF x (distance / GS).

Quick reference

Airplane Performance in Planning (supplement)

  • Take-off distance required (TODR) must not exceed TODA; take-off run required (TORR) must not exceed TORA.

  • Second segment climb gradient: 2.4% for two-engine, 2.7% for three-engine, 3.0% for four-engine aircraft (CS-25).

  • Obstacle clearance: net take-off flight path must clear all obstacles by 35 ft vertically.

  • Landing distance required (LDR) must not exceed LDA; the LDR is the greater of the actual landing distance and 1.67 x the actual landing distance (dry) or 1.92 x (wet).

  • Brake energy limit: the maximum kinetic energy the brakes can absorb; limits the landing mass at high gross mass and high speed.

  • Tyre speed limit: the maximum ground speed at which the tyres can operate; limits take-off mass at high altitude/high temperature.

  • Use the correct chart for the aircraft variant and engine type; do not mix charts between variants.

Quick reference

Mass and Balance (supplement)

  • Dry operating mass (DOM) = basic mass + crew + crew baggage + catering + potable water; it is the mass before traffic load and fuel.

  • Traffic load = passengers + baggage + cargo + mail; it is added to DOM to give zero-fuel mass (ZFM).

  • Take-off mass (TOM) = ZFM + take-off fuel; landing mass (LM) = TOM - trip fuel.

  • MZFM limit protects the wing root bending moment; it is most critical when fuel is low and payload is high.

  • CG limits are published as a envelope in %MAC or as a moment/arm diagram; the loaded CG must be inside the envelope for take-off and landing.

  • Forward CG increases stall speed, pitch force, and trim drag; aft CG reduces static stability and can cause pitch-up.

  • Load sheet must be signed by the commander or the load controller; LMC changes must be recorded and the CG rechecked.

Quick reference

In-Flight Monitoring and Replanning (supplement)

  • Position report format: aircraft identification, position, time, flight level, next position and ETA.

  • ADS-C automatic position reporting may replace voice reports in oceanic and remote airspace where approved.

  • Revised ETA must be transmitted when the difference from the filed estimate exceeds the State-prescribed margin (often 2-3 minutes).

  • Diversion to an alternate requires a new ATS clearance and a CHG message to the FPL.

  • Fuel check at each waypoint: compare actual fuel remaining with the planned figure; log the difference and trend.

  • If fuel remaining at destination is predicted below final reserve, declare MINIMUM FUEL; if below final reserve, declare MAYDAY FUEL.

  • Replanning may involve a new ETP, alternate, or level; update the OFP and inform the operator.

Quick reference

Flight Documentation (supplement)

  • OFP must include route, levels, winds, temperatures, fuel figures, mass data, alternates, and the commander's signature.

  • Load sheet: DOM, traffic load, take-off fuel, trip fuel, TOM, LM, CG, and LMC entries.

  • ATS flight plan (FPL) is the filed ICAO form; the pilot retains a copy and must be able to produce it on request.

  • Meteorological documentation: TAF, METAR, SIGMET, AIRMET, winds/temperatures aloft, and significant weather charts.

  • NOTAM documentation: runway closures, navaid outages, airspace restrictions, and temporary obstacles along the route.

  • AIP and route manuals provide airway structure, ATS units, and State rules; Jeppesen or equivalent charts are the standard reference.

  • Documentation must be retained for the operator's prescribed period; the commander is responsible for its accuracy.

Quick reference

Long-Range and Extended-Range Planning (supplement)

  • ETOPS/EDTO threshold: 60 minutes from a suitable alternate at the one-engine-inoperative cruise speed for twin-engine aircraft.

  • EDTO diversion time is the approved maximum time from the ETP to the alternate at the approved one-engine-inoperative speed, in ISA conditions.

  • Equal time point (ETP): the point where time to the two alternates is equal; computed with forecast winds for the diversion speed.

  • Critical fuel scenario: fuel required from the ETP to the alternate with one engine inoperative, decompression, and icing, plus reserves.

  • En-route alternates for EDTO must meet runway, approach, weather, and rescue/fire-fighting requirements at the planned ETA.

  • EDTO entry/exit points define the segment where the diversion time limit applies; they are planned and filed in the FPL route.

  • If an EDTO alternate becomes unavailable in flight, replan to the next suitable alternate and inform ATS and the operator.

Quick reference

Practical Flight-Planning Exercise (supplement)

  • Step 1: select route and levels; obtain winds and temperatures for the planned levels.

  • Step 2: compute TAS, GS, leg times, and total elapsed time for each leg.

  • Step 3: compute trip fuel from leg times and fuel flow; add contingency, alternate, final reserve, taxi, and additional fuel.

  • Step 4: check take-off, climb, cruise, descent, and landing performance against AFM charts and declared distances.

  • Step 5: compute mass and balance; verify MTOM, MLM, MZFM, and CG limits; produce the load sheet.

  • Step 6: verify fuel versus performance-limited mass; iterate if the planned mass exceeds a limit.

  • Step 7: file the ATS flight plan and complete the operational flight plan; brief the crew on alternates and reserves.