EPLE flashcards
EPLE · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Conflict of interest
- A situation where a professional's private or financial interest could improperly influence judgment on a client or public matter; the standard remedy is prompt written disclosure and recusal from the decision.
- Paramountcy of public welfare
- The ethical rule that public safety, health, and welfare take precedence over obligations to an employer or client when the two conflict; it is the first canon in most engineering codes.
- Seal and signature
- A licensee's formal attestation that work was prepared or directly supervised by that licensee and meets the applicable standard; it creates personal accountability and cannot be delegated.
- Certificate of authorization
- A permit issued to a firm, rather than an individual, allowing it to offer engineering services; the firm must typically name a licensed professional responsible for the work.
- Continuing professional development
- Mandatory ongoing learning required to maintain licensure; licensees must usually complete a set number of hours per renewal cycle and retain verifiable records of participation.
- Standard of care
- The degree of care and skill a reasonably competent professional would exercise in similar circumstances; it is judged against ordinary practice, not perfection or the highest available standard.
- Negligence elements
- A claim requires a duty of care owed, a breach of the standard of care, causation of loss, and actual damage; failure to prove any one element defeats the claim.
- Limitation period
- The statutory deadline for commencing legal action, running from the act or from discovery depending on jurisdiction; it is generally distinct from and shorter than contractual warranty periods.
- Privity of contract
- The doctrine that only parties to a contract may sue on it; tort duties can nonetheless extend to foreseeable third parties who rely on the professional's work.
- Compliance as a floor
- Meeting a published code or regulation satisfies the legal minimum but does not by itself defeat a negligence claim; a higher standard may still apply in the circumstances.
- Field review
- A site visit to confirm general conformance with design intent and to observe progress; it does not certify the contractor's means, methods, or workmanship quality.
- Shop drawing review
- A contractor submittal reviewed for consistency with design intent; review does not transfer design responsibility to the reviewer or relieve the contractor of compliance obligations.
- Delegation and supervision
- Assigning tasks to others is permitted when the delegate is competent and supervised; the delegating licensee retains full accountability for the accuracy of the output.
- Adopted edition rule
- Codes are incorporated into regulation by reference to a specific edition; the edition cited in the permit or statute governs, not the most recent edition published.
- As-built records
- Documents reflecting the actual constructed condition, prepared separately from design drawings and clearly labelled; they are not a substitute for the sealed design record.
- Informed consent
- Obtaining a client's agreement after disclosing material risks, reasonable alternatives, and cost implications in terms the client can understand and act upon.
- Documented assumptions
- Written statements of the inputs and conditions the professional relied on; they transfer responsibility when client-supplied data proves wrong and support later claims defence.
- Signatory authority
- The delegated power of an individual to bind an organization to instructions or contract changes; it should be confirmed in writing before acting on client direction.
- Single point of contact
- A named individual per party through whom instructions flow, preventing conflicting direction from reaching the field and preserving a clear communication record.
- Written confirmation of instruction
- The practice of recording verbal client direction in a memo or email within a defined interval, creating an auditable trail for scope and change disputes.
- Hierarchy of controls
- The ordered sequence of risk controls: elimination, substitution, engineering controls, administrative controls, and personal protective equipment as the least effective last resort.
- Independent check
- Review of calculations and drawings by a second competent person not involved in the original work; the primary defence against single-point design error.
- Quality assurance versus control
- Quality assurance manages the processes that prevent error; quality control inspects and tests outputs. A defensible program requires both, not one alone.
- Residual risk acceptance
- Documenting the risk remaining after controls are applied and obtaining sign-off from an authorized party, rather than assuming the risk has been eliminated.
- Non-punitive error reporting
- A reporting regime that protects reporters from discipline so near misses surface; punitive regimes suppress reporting and allow latent errors to accumulate.
- Commingling of funds
- Mixing client or trust money with the firm's operating funds; generally prohibited by regulation and treated as a serious ethical breach.
- Fee independence from liability
- The principle that professional liability exposure is unaffected by the fee charged; low-fee engagements carry the same standard of care as high-fee work.
- Flow-down clauses
- Contract provisions that pass insurance, confidentiality, and standard-of-care obligations from the prime agreement to subconsultants, keeping obligations consistent through the chain.
- Key-person risk
- The exposure created when a firm depends on one individual; succession planning and documented procedures protect clients if that person leaves or is incapacitated.
- Recovery point objective
- The maximum acceptable volume of data loss measured in time; it sets backup frequency, while recovery time objective sets the acceptable restoration downtime.
- Least privilege access
- Granting users only the access needed for their current role, reviewed at role change and contract end rather than only at termination.
- Litigation hold
- A directive suspending routine destruction of records relevant to an actual or anticipated dispute; deleting held records can constitute spoliation and attract sanctions.