Egypt Engineering Consultant Civil case studies
Egypt Engineering Consultant Civil · Put your knowledge to work in context.
The Egypt Engineering Consultant Civil credential is the civil-discipline consultant grade awarded through the Egyptian engineering syndicate (نقابة المهندسين) system. It marks a practising civil engineer as qualified to take professional responsibility for design, review and supervision decisions - signing off structural, geotechnical and infrastructure work, advising clients, and acting as the responsible consultant on projects. The Egypt Engineering Consultant Civil case studies are 5 cases and about 3,963 words.
1Archive Conversion on an Existing Flat-Plate Floor
A 1998 flat-plate office building in Mohandeseen, Cairo, has 220 mm slabs, 400 × 400 mm columns on a 6.0 × 6.0 m grid, fcu = 30 MPa, 20 mm cover and 16 mm bottom bars. The owner is converting the third floor into a compact archive.
829 words, about 4 min2Dewatering Next to a 1930s Masonry Building in Alexandria
A five-basement tower is under construction in Alexandria, 40 m from a three-storey 1930s masonry building on shallow strip footings. The excavation is 18 m deep and supported by an 800 mm diaphragm wall taken 30 m below ground.
760 words, about 4 min3Steel Mezzanine Substitution in a 1975 Concrete Warehouse
An 8 m × 15 m steel mezzanine is being inserted into a 1975 reinforced-concrete warehouse in Shoubra, Cairo, to create an archive and office. The new floor is at +4.5 m.
825 words, about 4 min4Subsurface Drainage and Pump Station for a Saline Delta Block
A 3,000-feddan (1 feddan = 4,200 m²) irrigated area in Beheira, Nile Delta, has a water table rising to 0.8 m below ground and progressive salinisation. You are asked to design a subsurface drainage system with a drainage coefficient of 4 mm/day, discharging through a new pump station to a main drain.
770 words, about 4 min5Nonconforming Concrete, a Friend Owner and a Offered Gift
You are the consultant for a private school in 6th of October City. The contractor cast 42 columns and 9 beams for the ground floor using concrete from a batching plant that was not the one approved in the mix design.
779 words, about 4 min