The Egyptian Mechanical Engineering Consultant qualification is the credential that lets an experienced mechanical engineer practise as a consultant - signing, stamping and taking professional responsibility for HVAC, plumbing, fire protection, power and energy designs submitted for building permits and private commissions in Egypt. It is aimed at engineers who already hold a recognised engineering degree, have completed the practical experience required by the Egyptian Syndicate of Engineers, and now want to move from supervised design work into independent consultancy. The Egypt Engineering Consultant Mechanical case studies are 5 cases and about 4,535 words.
1Hotel Chilled-Water Plant Held at 25 °C / 66% RH in Coastal Summer
A 96-room beach hotel in Alexandria runs a two-chiller plant (2 × 350 kW screw chillers, chilled water 7/12 °C) serving four AHUs. Since June, complaints about stuffiness and condensation on ceiling diffusers have risen; handheld meters show 25 °C and 66% RH in guest rooms against a design of 24 °C and 50% RH.
917 words, about 5 min2Combined Domestic and Fire Water System in a 14-Storey New Cairo Tower
A 14-storey residential tower in New Cairo (45 m to the roof) has a combined domestic and fire water system. The basement houses a domestic booster set (2 duty + 1 standby) drawing from a 120 m³ underground tank, and a fire pump taking suction from the same tank through a common manifold.
896 words, about 4 min3Cooling Tower Water Balance and Rising Condenser Approach at a Pharmaceutical Plant
A pharmaceutical plant in Borg El Arab rejects 1,500 kW through an open induced-draft cooling tower. Circulating water is 260 m³/h with a 5 K range and a 3 K approach; the tower serves the chiller condenser and a process water loop.
904 words, about 5 min4CHP Feasibility and Night-Time Load Collapse at a Concrete Products Factory
A ready-mix concrete and block factory in 6th of October City buys electricity at EGP 2.35/kWh and burns diesel at EGP 14.5/litre in two boilers (85% efficiency, LHV 35.8 MJ/litre) that supply process hot water. The factory runs 6,000 h/yr with an average electrical load of 900 kW and a continuous hot-water demand of 700 kW at 90 °C.
872 words, about 4 min5Late Shop Drawings, Late Chillers and a Request to Over-Certify in Assiut
A consultant administers a FIDIC-based contract (Red Book 1999, as amended) for a hospital HVAC package in Assiut. The contractor submitted a claim 45 days after the event alleging a 35-day delay and EGP 4.2 million of additional cost, caused by the Engineer approving plant-room shop drawings 21 days late and by the Employer delivering the imported chillers 40 days late.