EPA Lead Project Designer study materials
EPA Lead Project Designer study resources

EPA Lead Project Designer cheat sheet

EPA Lead Project Designer · Keep the key ideas within reach.

Quick reference

Regulatory Framework and Program Requirements

  • Lead-based paint (LBP) is paint or other surface coating with lead concentration ≥1.0 mg/cm² or ≥0.5% by weight.

  • Target housing: pre-1978 residential structures, excluding housing for elderly or disabled (unless a child under 6 resides or is expected to reside) and zero-bedroom units.

  • Child-occupied facility: pre-1978 building visited by same child under 6 at least 2 days/week, 3 hours/day, combined 6 hours/week, or 60 hours/year.

  • EPA certification required for firms performing abatement, renovation, or lead hazard evaluation; individuals must be certified as inspectors, risk assessors, project designers, supervisors, or workers.

  • Abatement: any measure to permanently eliminate lead-based paint or lead-based paint hazards, including removal, enclosure, encapsulation, replacement, and soil removal.

  • Interim controls: measures to temporarily reduce lead hazards, including specialized cleaning, paint stabilization, and dust control.

  • Renovation, Repair, and Painting (RRP) Rule applies to renovations disturbing >6 sq ft interior or >20 sq ft exterior of pre-1978 housing or child-occupied facilities.

  • Clearance levels: floors 10 µg/ft², interior window sills 100 µg/ft², window troughs 400 µg/ft², and soil 400 ppm (play areas) or 1,200 ppm (other areas).

  • Project designer certification requires completion of an accredited training course and passing a third-party exam; certification is valid for 3 years.

Quick reference

Health Effects of Lead Exposure and Hazard Recognition

  • Lead exposure primarily affects the central nervous system, hematopoietic system, and kidneys; children are more vulnerable due to developing brains and higher absorption rates.

  • Blood lead level (BLL) reference value: 3.5 µg/dL (CDC, 2021); no safe BLL has been identified.

  • Lead crosses the placenta and can affect fetal development; maternal exposure is a risk factor for preterm birth and low birth weight.

  • Acute lead poisoning symptoms include abdominal pain, constipation, fatigue, headache, and in severe cases encephalopathy, seizures, and coma.

  • Chronic low-level exposure in children is associated with reduced IQ, learning disabilities, attention deficits, and behavioral problems.

  • Lead hazard recognition includes deteriorated paint, friction and impact surfaces, dust on floors and sills, bare soil, and take-home lead from occupations.

  • Occupations with potential lead exposure include painting, construction, plumbing, auto repair, battery manufacturing, and smelting; take-home lead can contaminate vehicles and homes.

  • Chelation therapy is used for severe lead poisoning but does not reverse all cognitive effects; prevention is primary.

Quick reference

Lead Hazard Evaluation, Risk Assessment, and Inspection Data Interpretation

  • Risk assessment identifies lead-based paint hazards (deteriorated paint, dust, soil) and evaluates exposure pathways; inspection identifies presence of lead-based paint.

  • X-ray fluorescence (XRF) is the primary method for lead-based paint inspection; results are reported in mg/cm² and must be validated with laboratory analysis for inconclusive readings.

  • Laboratory analysis of paint samples by atomic absorption spectroscopy (AAS) or inductively coupled plasma (ICP) reports percent lead by weight.

  • Dust sampling uses wipe methods; clearance levels: floors 10 µg/ft², interior sills 100 µg/ft², troughs 400 µg/ft².

  • Soil sampling: play areas clearance 400 ppm; other areas 1,200 ppm; samples collected from bare soil areas and analyzed by laboratory.

  • Risk assessment includes visual inspection, dust and soil sampling, and may include paint testing; results guide hazard control recommendations.

  • Inspection reports must include location, substrate, condition, and testing method for each component; risk assessment reports must include hazard identification and recommended actions.

  • False negatives can occur with XRF due to substrate interference; false positives may occur with lead-based paint under layers; proper calibration and verification required.

Quick reference

Abatement Project Design and Specification Writing

  • Abatement project design includes scope of work, hazard control methods, worker protection, clearance requirements, and waste management.

  • Specifications must reference applicable regulations (e.g., EPA, OSHA, state/local) and require certified personnel and firms.

  • Abatement methods: removal (most permanent), enclosure (covering with rigid material), encapsulation (coating with sealant), replacement (removing component and installing new), and soil abatement.

  • Design must include containment and engineering controls (e.g., negative air machines, plastic sheeting) to prevent dust migration.

  • Clearance testing is required after abatement; visual inspection must show no dust, debris, or deteriorated paint.

  • Specifications should include pre-abatement inspection data, work practices, cleanup procedures, and post-abatement verification.

  • Project designer must ensure abatement plan is site-specific and addresses occupant protection, notification, and relocation if necessary.

  • Written specifications must include submittal requirements, quality assurance/quality control, and contingency plans for unexpected hazards.

Quick reference

Interim Controls and Hazard Control Strategies

  • Interim controls are temporary measures to reduce lead hazards and are not intended to permanently eliminate lead-based paint.

  • Interim control methods include paint stabilization, specialized cleaning, dust control, soil covering (e.g., mulch, grass), and safe work practices.

  • Paint stabilization includes repairing substrate, removing loose paint, and applying primer and finish coat.

  • Specialized cleaning uses HEPA vacuums and wet cleaning methods; cleaning verification may be used instead of clearance for interim controls (if allowed by regulation).

  • Interim controls require ongoing maintenance and reevaluation; a maintenance plan must be provided to occupants.

  • Hazard control strategies should prioritize areas with highest risk: friction/impact surfaces, child-accessible areas, and bare soil.

  • Interim controls are not appropriate for severe hazards; abatement may be required.

  • Education of occupants on lead-safe cleaning and hygiene is a key component of interim control strategies.

Quick reference

Worker Protection, Safety, and Occupational Health

  • OSHA Lead Standard (29 CFR 1926.62) applies to construction work; permissible exposure limit (PEL) is 50 µg/m³ as an 8-hour time-weighted average.

  • Employer must conduct exposure monitoring if lead is present; if exposure exceeds PEL, engineering controls, work practices, and respiratory protection are required.

  • Respiratory protection: half-mask APR with HEPA filters for exposures up to 10× PEL; full-face APR up to 50× PEL; supplied-air for higher levels.

  • Protective clothing: disposable coveralls, head covers, shoe covers, and gloves; must be removed before leaving work area.

  • Medical surveillance required for workers exposed above action level (30 µg/m³) for more than 30 days per year; includes blood lead testing and medical exams.

  • Blood lead level removal criteria: 50 µg/dL for general workers; 30 µg/dL for workers planning to have children; return at 40 µg/dL (general) or 25 µg/dL (workers planning children).

  • Hygiene facilities: wash hands and face before eating, drinking, or smoking; no eating in work area; change clothes and shower at end of shift if exposed.

  • Training required annually on lead hazards, safe work practices, and use of personal protective equipment.

Quick reference

Clearance, Post-Abatement Verification, and Project Closeout

  • Clearance is the process of verifying that abatement or interim controls have been completed and that lead hazards are below regulatory levels.

  • Clearance testing includes visual inspection and dust sampling (and soil sampling if soil abatement was performed).

  • Clearance levels: floors 10 µg/ft², interior sills 100 µg/ft², troughs 400 µg/ft², soil 400 ppm (play areas) or 1,200 ppm (other).

  • Clearance must be performed by a certified inspector or risk assessor (or certified clearance technician if allowed).

  • If clearance fails, cleanup and retesting are required until clearance is achieved.

  • Post-abatement verification includes confirming work completion, proper waste disposal, and that containment was removed.

  • Project closeout documentation includes clearance report, waste disposal manifests, and notification of completion.

  • Final report must include clearance results, any remaining hazards, and recommendations for ongoing maintenance.

Quick reference

Waste Handling, Disposal, and Site Decontamination

  • Lead-based paint waste is regulated as hazardous waste under RCRA if it exhibits the toxicity characteristic (TCLP lead ≥5 mg/L) or is corrosive; otherwise it may be managed as solid waste.

  • Waste must be containerized, labeled, and transported by a licensed hauler to an approved disposal facility.

  • On-site decontamination: workers must use HEPA vacuums and wet cleaning to remove lead dust from tools, equipment, and PPE before leaving the work area.

  • Waste water from cleanup must be filtered or treated to remove lead before disposal; never discharge to storm drains.

  • Containment materials (plastic sheeting, tape) must be disposed of as lead-contaminated waste.

  • Site decontamination includes cleaning floors, windows, and surfaces outside the work area if contamination spread occurred.

  • Waste manifests and disposal records must be retained for at least 3 years.

  • Proper waste handling prevents environmental contamination and take-home lead exposure.

Quick reference

Recordkeeping, Notifications, and Reporting Requirements

  • Occupant notification: owners and occupants must receive a lead hazard information pamphlet (EPA/HUD/CDC) before abatement or renovation.

  • Notification to EPA or authorized state program required at least 5 business days before abatement (or 3 days for emergency).

  • Records to maintain: certification, training certificates, inspection/risk assessment reports, abatement plans, clearance reports, waste manifests, and medical surveillance records.

  • Records must be retained for at least 3 years (some states require longer).

  • Blood lead level reporting: employers must provide employees with written medical opinions and notify them of exposure monitoring results.

  • Real estate disclosure: sellers and landlords must disclose known lead-based paint hazards to buyers/renters of pre-1978 housing.

  • Reporting to EPA: certified firms must notify EPA of changes in information (e.g., address, personnel) within 30 days.

  • All notifications and reports must be in writing and available for inspection by regulatory authorities.