EPA Lead Project Designer flashcards
EPA Lead Project Designer · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Lead-based paint definition
- Paint or surface coating with lead concentration ≥1.0 mg/cm² or ≥0.5% by weight, as determined by XRF or laboratory analysis.
- Target housing
- Pre-1978 residential structures, excluding housing for elderly or disabled (unless a child under 6 resides or is expected to reside) and zero-bedroom units.
- Child-occupied facility
- Pre-1978 building visited by the same child under 6 at least 2 days/week, 3 hours/day, combined 6 hours/week, or 60 hours/year.
- Abatement
- Any measure to permanently eliminate lead-based paint or lead-based paint hazards, including removal, enclosure, encapsulation, replacement, and soil removal.
- Interim controls
- Measures to temporarily reduce lead hazards, including specialized cleaning, paint stabilization, and dust control, not intended for permanent elimination.
- RRP Rule threshold
- Renovation disturbing >6 sq ft interior or >20 sq ft exterior of pre-1978 housing or child-occupied facility triggers RRP compliance.
- Blood lead reference value
- 3.5 µg/dL (CDC 2021), the level above which children are considered to have elevated blood lead levels; no safe level exists.
- Lead health effects
- Lead affects the central nervous system, hematopoietic system, and kidneys; in children causes reduced IQ, learning disabilities, and behavioral problems.
- Take-home lead
- Lead dust carried from workplace on clothing, shoes, or body, contaminating homes and vehicles and exposing family members.
- Risk assessment
- On-site investigation to identify lead-based paint hazards (deteriorated paint, dust, soil) and evaluate exposure pathways, leading to hazard control recommendations.
- XRF analysis
- X-ray fluorescence is the primary method for lead-based paint inspection; results in mg/cm² and require validation for inconclusive readings.
- Dust clearance levels
- Floors 10 µg/ft², interior window sills 100 µg/ft², window troughs 400 µg/ft², measured by wipe sampling after abatement.
- Soil clearance levels
- Play areas 400 ppm; other areas 1,200 ppm, based on laboratory analysis of soil samples from bare areas.
- Inspection vs risk assessment
- Inspection identifies presence of lead-based paint; risk assessment identifies hazards and exposure pathways and recommends controls.
- Abatement methods
- Removal, enclosure, encapsulation, replacement, and soil abatement; removal is most permanent.
- Project design specifications
- Written document including scope, hazard control methods, worker protection, clearance requirements, waste management, and regulatory references.
- Containment and engineering controls
- Plastic sheeting, negative air machines, and barriers used to prevent dust migration during abatement.
- Paint stabilization
- Interim control method: repair substrate, remove loose paint, apply primer and finish coat to reduce lead dust hazards.
- Specialized cleaning
- Interim control using HEPA vacuums and wet cleaning methods to remove lead dust from surfaces.
- Interim control maintenance
- Ongoing maintenance and reevaluation required after interim controls; maintenance plan must be provided to occupants.
- OSHA lead PEL
- Permissible exposure limit for lead in construction: 50 µg/m³ as an 8-hour time-weighted average (29 CFR 1926.62).
- Respiratory protection levels
- Half-mask APR with HEPA up to 10× PEL; full-face APR up to 50× PEL; supplied-air for higher exposures.
- Medical surveillance triggers
- Required for workers exposed above action level (30 µg/m³) for more than 30 days per year; includes blood lead testing and medical exams.
- Blood lead removal criteria
- 50 µg/dL for general workers; 30 µg/dL for workers planning children; return at 40 µg/dL (general) or 25 µg/dL (workers planning children).
- Clearance testing
- Post-abatement verification including visual inspection and dust sampling (and soil sampling if soil abatement) to ensure hazards are below regulatory levels.
- Clearance failure response
- If clearance fails, cleanup and retesting are required until clearance is achieved; work must continue until levels meet standards.
- Project closeout documentation
- Includes clearance report, waste disposal manifests, notification of completion, and final report with remaining hazards and maintenance recommendations.
- Lead waste hazardous classification
- Lead-based paint waste is hazardous if it exhibits toxicity characteristic (TCLP lead ≥5 mg/L) or corrosivity; otherwise managed as solid waste.
- Waste handling requirements
- Containerize, label, and transport by licensed hauler to approved facility; retain manifests for at least 3 years.
- On-site decontamination
- Use HEPA vacuums and wet cleaning to remove lead dust from tools, equipment, and PPE before leaving work area.
- Occupant notification pamphlet
- Owners and occupants must receive EPA/HUD/CDC lead hazard information pamphlet before abatement or renovation.
- Abatement notification timing
- Notify EPA or authorized state program at least 5 business days before abatement (3 days for emergency).