EEA Electrician Exam study materials
EEA Electrician Exam study resources

EEA Electrician Exam cheat sheet

EEA Electrician Exam · Keep the key ideas within reach.

Quick reference

Electrical Theory and Fundamentals

  • Ohm's law: E = I × R; power P = E × I = I²R = E²/R. In AC circuits use impedance Z and account for phase angle.

  • Single-phase power: P = E × I × PF. Balanced three-phase: P = √3 × E_line × I_line × PF; apparent power S in VA, reactive power Q in VAR.

  • Series circuit: current is common, resistances add (R_T = R1 + R2 + …), voltage divides proportionally. Parallel: voltage common, conductances add (1/R_T = 1/R1 + 1/R2 + …).

  • Conductor resistance: R = ρL/A with ρ in circular-mil-ohms per foot; R rises with temperature and with length, falls with cross-sectional area.

  • RMS values: for a sine wave, RMS = peak × 0.707 and average = peak × 0.637; RMS is the heating-equivalent value used for power calculations.

  • Frequency and reactance: X_L = 2πfL, X_C = 1/(2πfC), Z = √(R² + (X_L − X_C)²); resonance occurs when X_L = X_C.

  • Power factor = kW/kVA = cos θ; low PF increases current for the same real power, raising conductor and voltage-drop losses.

  • Transformer turns ratio: E_primary/E_secondary = N_primary/N_secondary; current ratio is inverse, and VA is essentially conserved (minus losses).

  • Voltage drop (single phase) ≈ 2 × K × I × L / CM, where K ≈ 12.9 for copper and ≈ 21.2 for aluminum; CM is circular mils of the conductor.

Quick reference

Wiring Methods and Materials

  • Conductor ampacity tables are applied with correction factors for ambient temperature and adjustment factors for more than three current-carrying conductors in a raceway or cable.

  • NM cable (Romex) is limited to dry locations and generally prohibited in wet locations, in raceways outdoors, in hazardous locations, and where subject to physical damage.

  • RMC, IMC, and EMT differ in wall thickness and permitted use; EMT is permitted in concrete and direct sunlight with listed fittings but not where severe corrosion or physical damage requires rigid.

  • Raceway fill: conductors must not exceed the permitted percentage of interior cross-sectional area - one conductor 53%, two 31%, over two 40%.

  • Box fill is calculated from conductor volume allowances plus clamps, support fittings, devices, and equipment grounding conductors; each conductor size has a table volume.

  • Cable and raceway support intervals and securing distances are method-specific; ENT, PVC, and EMT each have their own maximum support spacing and securement rules.

  • Bending radius must not be less than the minimum multiple of the raceway or cable diameter specified for the method; kinks and crushed conduit are violations.

  • Expansion fittings are required where raceways cross building expansion joints and for long straight PVC runs subject to thermal movement.

  • Liquidtight flexible metal conduit is permitted in wet locations with listed fittings; LFMC in lengths over 1.8 m (6 ft) requires an equipment grounding conductor.

Quick reference

Branch Circuits, Feeders, and Service Calculations

  • Standard branch-circuit ratings include 15, 20, 30, 40, and 50 A; the overcurrent device rating generally sets the branch-circuit rating.

  • Receptacle outlets on 15 A and 20 A branch circuits: general-use receptacles must match the circuit rating; a 20 A circuit may use 15 A or 20 A receptacles but a single receptacle must match.

  • Small-appliance and laundry branch circuits are 20 A and must not serve other outlets; kitchen countertop receptacles require GFCI protection.

  • Continuous loads are calculated at 125% for branch-circuit and feeder sizing; the overcurrent device must be at least 125% of continuous load plus 100% of noncontinuous load.

  • General lighting load is based on volt-amperes per square meter (or per square foot) by occupancy type, then demand factors may be applied for dwellings.

  • Standard service calculation method: general lighting + small appliance + laundry + other loads, apply demand factors, add largest motor at 125%, then size service conductors and equipment.

  • Feeder and service conductor sizing uses the larger of the calculated load or the existing load, with ampacity adjusted for ambient temperature and conductor count.

  • Demand factors reduce calculated load for ranges, dryers, and multiple dwelling units; optional calculation methods may produce a smaller service when conditions are met.

  • Voltage drop on branch circuits and feeders is a design consideration; recommended total drop is about 3% on a branch circuit and 5% overall.

Quick reference

Grounding and Bonding

  • System grounding connects the grounded circuit conductor to earth at the service; equipment grounding bonds non-current-carrying metal parts to provide a low-impedance fault path.

  • The service neutral (grounded conductor) is bonded to the enclosure and grounding electrode system at the service disconnect only; downstream panels must have separate neutral and ground bars.

  • Grounding electrode system items include metal underground water pipe, metal frame of the building, concrete-encased electrode, ground ring, rod/pipe electrodes, and plate electrodes.

  • The grounding electrode conductor is sized from the largest service conductor using the applicable table; the bonding jumper to a water pipe is sized per the same rules.

  • Equipment grounding conductor sizing is based on the rating of the overcurrent device protecting the circuit, not on the phase conductor ampacity alone.

  • Bonding jumpers are required around water meters, at metallic gas piping, and across removable or insulating sections of metallic raceways and fittings.

  • A grounding electrode conductor to a made electrode (rod, pipe, plate) is not required to be larger than 6 AWG copper; rod electrodes must be driven to at least 2.4 m (8 ft) unless rock is encountered.

  • GFCI protection and equipment grounding are distinct: GFCI protects people from line-to-ground shock, while the EGC provides the fault-return path for overcurrent clearing.

  • Bonding of service equipment, metal raceways, and enclosures must ensure electrical continuity; listed bonding fittings and jumpers are used where continuity is not assured.

Quick reference

Overcurrent Protection and Short-Circuit Current Ratings

  • Standard overcurrent device ratings: 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 110, 125, 150, 175, 200 A and upward.

  • The next-higher-standard-rating rule permits the next standard device above the calculated load when the load does not exceed 800 A and other conditions are met.

  • Continuous loads require the overcurrent device to be at least 125% of the continuous load plus 100% of noncontinuous load.

  • Short-circuit current rating (SCCR) of equipment must equal or exceed the available fault current at the point of installation; series-rated systems use listed combinations.

  • Fuses and circuit breakers must be selected so their interrupting rating is adequate for the available fault current at their line terminals.

  • Coordination is achieved by time-current curves: the upstream device should not trip before the downstream device for a fault in the downstream zone.

  • Overcurrent devices must be readily accessible, not exposed to physical damage, and installed in the orientation specified by the listing (breakers usually not upside down).

  • Series-rated equipment must be marked with the series combination rating; replacing a breaker with an unlisted type voids the rating.

  • Ground-fault protection of equipment (GFPE) at service levels (commonly 1000 A and above) limits damage from arcing ground faults; it does not replace GFCI.

Quick reference

Motors, Controls, and HVAC Equipment

  • Motor branch-circuit conductors are sized at 125% of the motor full-load current from the applicable table; the overload device is sized from the nameplate current.

  • Short-circuit and ground-fault protection for motors is sized from the FLC table using percentages by motor type and starting method; the next standard size may be used if the calculated size is not standard.

  • Motor overload protection protects the motor from overheating; it is separate from branch-circuit short-circuit protection and is set per nameplate or table values.

  • The motor disconnecting means must be in sight from the controller and motor, and within the distances specified; a lockable disconnect may be permitted where not in sight under conditions.

  • A controller is required for each motor; horsepower-rated switches or manual starters are used where permitted, and the controller must be capable of starting and stopping the motor.

  • A/C and refrigeration equipment: branch-circuit conductor ampacity is at least 125% of the rated-load current or the nameplate minimum circuit ampacity (MCA).

  • The nameplate maximum overcurrent protective device (MOP) rating may be used to size the branch-circuit protection for hermetic refrigerant motor-compressors.

  • Motor circuits require an equipment grounding conductor and bonding of the motor frame; flexible connections to motors must be listed for the purpose.

  • Motor full-load current tables differ for DC motors, single-phase, and polyphase; use the table matching the motor type rather than the nameplate FLA for conductor sizing.

Quick reference

Special Occupancies, Locations, and Equipment

  • Hazardous (classified) locations are classified by Class (I gases/vapors, II dusts, III fibers), Division or Zone, and Group; equipment must be listed for the specific classification.

  • Class I Division 1 requires explosionproof or intrinsically safe equipment; Division 2 requires equipment suitable for the location and non-arcing under normal conditions.

  • Bathrooms, garages, outdoors, crawl spaces, and kitchens have specific GFCI and receptacle requirements; receptacles near sinks and in damp locations need GFCI and appropriate covers.

  • Swimming pools, spas, and fountains require equipotential bonding of metal parts and specific receptacle distances and GFCI protection.

  • Health care facilities use redundant grounding and isolated power systems in critical care areas; receptacle types and grounding requirements are more stringent.

  • Assembly, theatrical, and motion picture locations have specific rules for stage wiring, portable switchboards, and grounding of portable equipment.

  • Service stations, bulk storage plants, and spray areas have classified-location boundaries; seals and conduit requirements apply at boundaries.

  • Solar photovoltaic systems require rapid shutdown provisions, listed DC-rated equipment, and labeling; PV conductors are considered energized at all times in sunlight.

  • Battery storage, electric vehicle supply equipment, and marinas have dedicated article requirements for disconnects, GFCI/GFPE, and bonding.

Quick reference

Electrical Safety, Codes, and Standards

  • The NEC is organized into articles and chapters; Chapter 1–4 are general, Chapters 5–7 cover special occupancies, special conditions, and special equipment, and Chapter 9 contains tables and annexes.

  • Article 90 covers scope and enforcement; Article 100 defines terms such as 'listed', 'labeled', 'approved', and 'identified', which control code interpretation.

  • Lockout/tagout, PPE, and energized-work permits are covered by workplace safety standards (OSHA 1910 Subpart S) in addition to the NEC.

  • Arc flash risk assessment determines incident energy and arc flash boundary; PPE categories and approach boundaries are based on the calculated incident energy.

  • The NEC is not a design manual; it sets minimum requirements, and local amendments and the authority having jurisdiction (AHJ) may impose stricter rules.

  • Permits and inspections are required before covering work; the AHJ interprets the code and may require listed products and approved installation methods.

  • Approved equipment must be listed by a recognized testing laboratory; field modifications to listed equipment may void the listing.

  • Working clearances in front of electrical equipment are based on voltage, condition, and whether the equipment is live; the depth and width of the working space are specified.

  • Temporary wiring, flexible cords, and extension cords have restrictions on use as permanent wiring and on passing through walls, ceilings, or floors.

Quick reference

Load Calculations and Plan Interpretation

  • Read the drawing set in order: site plan, floor plans, power/lighting plans, panel schedules, single-line diagram, and specifications; cross-check panel schedules against the single-line.

  • Calculate dwelling general lighting load from floor area × 3 VA per square foot (about 33 VA/m²), then apply demand factors for the dwelling unit.

  • Small-appliance and laundry circuits: two or more 20 A small-appliance circuits at 1500 VA each plus one laundry circuit at 1500 VA in the standard method.

  • Range and dryer demand factors apply to household electric ranges and clothes dryers; the nameplate rating and table demand factors determine the load.

  • The optional dwelling calculation method permits a different load aggregation and may reduce service size; it must be applied consistently and documented.

  • Panel schedule checks: verify connected load, demand load, spare breaker spaces, bus rating, and that the main breaker equals or exceeds the calculated demand.

  • Single-line diagram checks: service voltage and phase, service disconnect rating, grounding electrode conductor, and feeder sizes to subpanels.

  • Plan symbols: duplex receptacle, GFCI receptacle, switch, junction box, panel, and motor connections must be matched to the legend; verify homerun counts and circuit numbers.

  • Verify available fault current on the utility or transformer data and confirm equipment SCCR and breaker interrupting ratings meet or exceed it.