EXIN CDCS study materials
EXIN CDCS study resources

EXIN CDCS flashcards

EXIN CDCS · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Availability formula
Availability = MTBF / (MTBF + MTTR). It expresses the fraction of time a system is operational, where MTBF is mean time between failures and MTTR is mean time to repair.
Tier III characteristic
Concurrently maintainable: every component can be removed or replaced for planned maintenance without shutting down IT load. It uses dual power paths but only one is active at a time.
Tier IV characteristic
Fault tolerant: the site sustains an unplanned failure of any single component without affecting IT load. It provides two simultaneously active power paths and compartmentalized infrastructure.
Tier II characteristic
Redundant capacity components: critical systems include N+1 spares, but the site still needs a shutdown for some maintenance. It has a single distribution path with redundant components.
2N redundancy
Two complete, independent systems each sized for full load, with no dependency between them. Failure of one system leaves the other fully capable of carrying the entire load.
PUE definition
Power Usage Effectiveness = total facility power divided by IT equipment power. A ratio of 1.0 means all power reaches IT; lower values indicate better energy efficiency, not higher availability.
DCiE definition
Data Centre Infrastructure Efficiency = 1 / PUE, expressed as a percentage. It is the reciprocal of Power Usage Effectiveness and represents the share of facility power delivered to IT equipment.
WUE definition
Water Usage Effectiveness = annual water consumption in litres divided by IT equipment energy in kWh. It quantifies cooling water intensity and complements PUE as a sustainability metric.
Double-conversion UPS
An online UPS rectifies mains to DC and inverts back to AC continuously, so the load always runs on conditioned power. It isolates IT from sags, surges, and frequency variation.
Line-interactive UPS
A UPS that conditions voltage with an automatic voltage regulator and transfers to battery on outage. It is cheaper than double conversion but offers less isolation from power quality problems.
Hot aisle containment
Physical enclosure of the hot aisle so hot exhaust air returns directly to the cooling units. It prevents mixing with cold supply air, improving delta-T and cooling efficiency.
Rack Cooling Index
RCI measures how well rack inlet temperatures comply with ASHRAE limits. RCI-high scores overheating risk; RCI-low scores overcooling. Values near 100% indicate good airflow management.
ASHRAE inlet envelope
Recommended range for IT equipment inlet air, roughly 18 to 27 degrees Celsius with humidity limits. Operating inside this envelope allows wider cooling setpoints and energy savings.
RTO definition
Recovery Time Objective: the maximum acceptable time to restore a service after disruption. It is derived from business impact analysis and drives redundancy and failover design choices.
RPO definition
Recovery Point Objective: the maximum acceptable amount of data loss measured in time. It determines backup frequency and whether replication must be synchronous or asynchronous.
Business Impact Analysis
A process that identifies critical business functions and quantifies the impact of their loss over time. Its outputs set recovery priorities, RTO, and RPO for IT services.
Risk treatment options
Four standard responses to identified risk: avoid the activity, mitigate or reduce likelihood/impact, transfer via insurance or contract, or accept and monitor the residual risk.
Residual risk
The risk remaining after controls have been applied. It must be documented, assigned an owner, and accepted formally, because controls rarely eliminate risk entirely.
ISO/IEC 27001
An international standard specifying requirements for an Information Security Management System. It uses a risk-based approach with controls for confidentiality, integrity, and availability of information.
EN 50600 series
European standard for data centre facilities and infrastructures. It defines availability and protection classes, covering power distribution, environmental control, security, and operational processes.
ANSI/TIA-942
A telecommunications infrastructure standard for data centres. It defines rated levels and addresses cabling, topology, redundancy, and site infrastructure for telecom spaces and data halls.
Security zones
Layered physical areas with progressively stricter access, such as perimeter, building, computer room, and rack. Each boundary requires its own access control and monitoring controls.
Two-person rule
A control requiring two authorized individuals to be present for sensitive actions or access to critical areas. It reduces insider threat and enables independent verification of activity.
Least privilege
A security principle granting users only the access needed for their role and no more. It limits the blast radius of compromised credentials and simplifies access reviews.
Clean agent suppression
Fire suppression using electrically non-conductive extinguishing agents that leave no residue, suitable for occupied IT spaces. Examples include inert gas blends and fluorinated ketones.
VESDA detection
Very Early Smoke Detection Apparatus: an aspirating system that continuously samples air through pipes to a laser detector. It detects incipient fire before visible smoke appears.
Incident versus problem
An incident is an unplanned interruption or degradation of service requiring rapid restoration. A problem is the underlying cause of one or more incidents, investigated through root cause analysis.
Cold, warm, hot sites
Disaster recovery site types ordered by readiness. Cold has space and power only, warm has partial equipment and data, hot is fully equipped with near-real-time data replication.
DCIM system
Data Centre Infrastructure Management software that tracks assets, connections, power chains, and capacity across the facility. It supports change planning and prevents overloading circuits or racks.
BMS versus EPMS
BMS monitors and controls building systems such as cooling and humidity. EPMS focuses on electrical power distribution, metering, breaker status, and UPS or generator performance.
Lock-out tag-out
A safety procedure isolating energy sources and applying personal locks and tags before maintenance. It prevents accidental energization and is mandatory for electrical work in data centres.
Arc flash assessment
A study calculating incident energy at electrical equipment, setting arc flash boundaries and required PPE. It informs labelling and safe work practices for energized equipment maintenance.
Data sanitization levels
NIST SP 800-88 defines clear, purge, and destroy. Clear removes data for reuse, purge protects against laboratory recovery, and destroy renders media unusable, each with differing assurance.