EXIN LSSA Green Belt Practical flashcards
EXIN LSSA Green Belt Practical · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- DPMO formula
- Defects per million opportunities equals defects divided by total opportunities, multiplied by one million. Total opportunities equals units multiplied by opportunities per unit.
- Cpk interpretation
- Cpk measures how well a stable process fits within specification limits, accounting for centering. Values below 1.0 indicate the process produces defects; 1.33 is a common minimum target.
- Rolled throughput yield
- RTY multiplies the first-pass yields of every process step. Because yields multiply, a long process with many high-yield steps can still deliver a low overall yield.
- Gauge R&R threshold
- Gauge repeatability and reproducibility below 10 percent of tolerance or process variation is generally acceptable. Between 10 and 30 percent is conditionally acceptable; above 30 percent requires measurement system action.
- Takt time
- Takt time equals available production time divided by customer demand rate. It sets the pace each process must meet to satisfy demand without building inventory.
- Little's Law
- Average work-in-process equals throughput multiplied by average flow time. At constant throughput, reducing WIP proportionally shortens lead time through the process.
- Seven wastes
- Overproduction, waiting, transport, overprocessing, inventory, motion, and defects, often plus unused talent. Overproduction is considered worst because it generates the other wastes.
- SMED principle
- Single-minute exchange of die separates setup work into internal activities that require machine stoppage and external activities that can occur while running. Converting internal to external reduces changeover time.
- Type I and II errors
- Type I error rejects a true null hypothesis and is controlled by alpha. Type II error fails to reject a false null and is related to power, which equals one minus beta.
- p-value meaning
- The probability of observing data at least as extreme as the sample if the null hypothesis were true. Reject the null when the p-value is below the chosen alpha.
- ANOVA purpose
- Analysis of variance tests whether three or more group means are equal. A significant F test shows at least one mean differs; post-hoc tests identify which pairs differ.
- R-squared meaning
- In regression, R-squared is the proportion of variation in the response explained by the model. Adjusted R-squared penalizes added predictors and is used to compare models.
- Chi-square independence test
- Compares observed counts in a contingency table with expected counts computed from row and column totals. It tests whether two categorical variables are associated.
- Full factorial runs
- A two-level full factorial experiment with k factors requires two raised to the k power runs before replication. Adding center points tests for curvature.
- FMEA risk priority number
- RPN equals severity multiplied by occurrence multiplied by detection. Higher RPN values indicate higher priority for corrective action, though high severity alone can also demand action.
- Control chart selection
- Use I-MR charts for individual measurements, X-bar and R charts for small subgroups, and p, np, c, or u charts for attribute data depending on sample size constancy.
- Control versus specification limits
- Control limits are computed from process data, typically at three sigma from the centerline. Specification limits come from customer or design requirements and are not interchangeable with control limits.
- Ppk versus Cpk
- Ppk uses overall standard deviation and suits initial capability studies. Cpk uses within-subgroup variation and suits ongoing capability assessment of a stable process.
- SIPOC diagram
- A high-level map showing Suppliers, Inputs, Process, Outputs, and Customers. It defines project scope boundaries before detailed process mapping begins.
- SMART goal statement
- A project goal that is specific, measurable, achievable, relevant, and time-bound, stating the target metric, baseline, and completion date without naming causes or solutions.
- Cost of poor quality
- Costs from prevention, appraisal, internal failure, and external failure. External failure costs, such as warranty and recalls, are typically the most damaging to the organization.
- Operational definition
- A precise statement of what is measured, how, by whom, and the decision rule applied. It makes measurements repeatable across appraisers and shifts.
- Five Whys technique
- Repeatedly asking why a problem occurs to trace it to a systemic cause. Stop when the cause is actionable and within the team's control, then verify with data.
- Fishbone diagram categories
- A cause-and-effect diagram commonly organized by Man, Machine, Material, Method, Measurement, and Environment. Teams brainstorm causes in each category before validating them with data.
- Theory of constraints
- Identify the bottleneck, exploit it, subordinate other processes to its pace, elevate its capacity, then repeat. Improving non-bottleneck steps does not raise system throughput.
- OEE calculation
- Overall equipment effectiveness equals availability multiplied by performance multiplied by quality. World-class performance is often cited near 85 percent.
- Kano model classes
- Features are must-be, performance, or delighter. Missing must-be features cause dissatisfaction, while delighters please when present but are not expected.
- QFD house of quality
- Quality function deployment translates customer requirements into technical characteristics using a relationship matrix, aligning design decisions with what customers value.
- Central limit theorem
- Sample means tend toward a normal distribution as sample size grows, regardless of population shape. This enables normal-based inference with adequately sized samples.
- Normal distribution rule
- About 68 percent of values fall within one standard deviation of the mean, 95 percent within two, and 99.7 percent within three.
- Kanban pull signal
- A card or signal authorizing upstream replenishment based on downstream consumption. Card counts are set from demand during lead time plus a safety buffer.
- Heijunka level scheduling
- Leveling production volume and product mix over time to smooth demand variation, reduce inventory buffers, and support stable pull systems.