- DPMO
- Defects Per Million Opportunities. Calculated as defects divided by (units multiplied by opportunities per unit), then multiplied by one million. It normalizes defect counts across processes of different complexity.
- Rolled Throughput Yield
- The product of the first-pass yields of every step in a process. It reveals hidden rework and inspection losses that a final yield figure conceals.
- Takt time
- Available production time divided by customer demand, expressed as time per unit. It sets the pace a process must run at to meet customer requirements without overproducing.
- Eight wastes (TIMWOODS)
- Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and unused Skills. These are the non-value-adding activities Lean targets for elimination or reduction.
- Y equals f of x
- The output Y of a process is a function of its input variables x. Six Sigma projects identify and control the critical x's that drive variation in the output.
- Six sigma defect level
- A process performing at six sigma produces about 3.4 defects per million opportunities, accounting for the conventional 1.5 sigma long-term shift from the short-term mean.
- DMAIC phases
- Define, Measure, Analyze, Improve, Control. A structured improvement cycle for existing processes with unknown root causes, with tollgate reviews between phases.
- DMADV
- Define, Measure, Analyze, Design, Verify. Used for designing new products or processes, or when an existing process cannot be fixed to meet specifications.
- Tollgate review
- A checkpoint at the end of each DMAIC phase where the sponsor and belt confirm the required deliverables exist before work proceeds to the next phase.
- PDCA cycle
- Plan, Do, Check, Act. The improvement logic underlying DMAIC: plan the change, run it, verify results, and standardize or adjust accordingly.
- Problem statement
- A factual description of what is wrong, where, when, and how much, supported by data and business impact. It must not name a cause or a solution.
- SMART goal
- A goal that is Specific, Measurable, Achievable, Relevant, and Time-bound, stated with a baseline value, a target value, and a deadline.
- VOC to CTQ
- Voice of the Customer is translated into Critical to Quality requirements by converting customer needs into measurable characteristics with specification limits the process must meet.
- SIPOC diagram
- Suppliers, Inputs, Process, Outputs, Customers. A high-level map that defines project boundaries and shows what the process receives and delivers.
- Project charter
- The document authorizing a project: business case, problem and goal statements, scope boundaries, team roles, milestones, and expected benefits.
- Stakeholder analysis
- Mapping stakeholders by influence and interest to decide engagement level. High-influence, high-interest parties such as the sponsor need close involvement.
- Continuous versus discrete data
- Continuous data is measured on a scale, such as time or weight. Discrete data is counted, such as pass or fail, or number of defects.
- Operational definition
- A precise description of how a characteristic is measured, including what is included and excluded, the instrument, and the recording method, so collectors produce consistent data.
- Gage R&R
- A measurement system study separating repeatability, variation when one appraiser measures the same item twice, from reproducibility, variation between different appraisers measuring the same items.
- Attribute agreement
- A study of how consistently appraisers make pass or fail judgments on the same items, compared against each other and against a known standard.
- Swimlane flowchart
- A process map with one lane per role or department, showing handoffs and who performs each step. It exposes waiting and transport waste at boundaries.
- Cp and Cpk
- Cp compares specification width to process spread. Cpk also accounts for how far the process mean sits from the specification center, so it is lower when off-center.
- Five Whys
- Repeatedly asking why a problem occurs until the systemic root cause is reached. Each answer must be supported by evidence, not assumption.
- Fishbone diagram
- A cause-and-effect diagram grouping candidate causes under Man, Machine, Material, Method, Measurement, and Environment to structure brainstorming before data verification.
- Pareto principle
- Roughly 80 percent of effects come from 20 percent of causes. A Pareto chart ranks causes by frequency or cost so effort targets the vital few.
- Value-added test
- A step is value-adding only if it changes form or function, the customer cares about it, and it is done right the first time.
- Stratification
- Splitting data into subgroups by shift, machine, operator, or supplier to reveal where a problem concentrates and which cause is most likely.
- Poka-yoke
- Error-proofing that prevents a defect from being created or passed downstream, using devices such as guide pins, sensors, limit switches, or forced sequences.
- 5S
- Sort, Set in order, Shine, Standardize, Sustain. A workplace organization method that reduces motion and waiting waste and makes abnormal conditions visible.
- SMED
- Single-Minute Exchange of Die. A method that separates internal setup, done while the machine is stopped, from external setup, and converts internal tasks to external to shorten changeovers.
- Standard work
- Documented current best method specifying sequence, cycle time, and standard in-process inventory. It provides a stable baseline for further improvement.
- Control chart
- A time-ordered plot with a centerline and control limits at plus and minus three sigma, used to separate common-cause from special-cause variation in a process.
- Control plan
- A document listing each controlled characteristic with its target or specification, measurement method, sampling frequency, owner, and reaction plan when results deviate.
- Yellow Belt role
- A team member who applies basic Lean Six Sigma tools, collects and validates data, maps processes, and supports Green and Black Belts rather than leading complex projects alone.
- Tuckman stages
- Forming, Storming, Norming, Performing, and Adjourning. The predictable sequence of team development that a project team passes through.
- RACI matrix
- Responsibility, Accountability, Consulted, Informed. A chart assigning each project task to roles, with exactly one person accountable per task.