EXIN LSSA Lean Six Sigma Yellow Belt study materials
EXIN LSSA Lean Six Sigma Yellow Belt study resources

EXIN LSSA Lean Six Sigma Yellow Belt study plan

EXIN LSSA Lean Six Sigma Yellow Belt · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Lean and Six Sigma fundamentals and concepts & The DMAIC improvement cycle

  • Define Lean and Six Sigma in your own words and explain how the two approaches complement each other in a single improvement effort

  • Distinguish the five Lean principles (value, value stream, flow, pull, perfection) and give a workplace example of each

  • Distinguish the Six Sigma principle of reducing variation from the Lean principle of removing waste, and state which one addresses a given scenario

  • List the five DMAIC phases in order and write one sentence describing the purpose and main output of each

  • Explain the difference between DMAIC and a simple PDCA quick-fix cycle and state when each is appropriate

Your checkpoint

A one-page comparison sheet: Lean vs Six Sigma definitions, the five Lean principles with examples, and a five-row DMAIC table (phase, purpose, key output)

Week 2

Lean and Six Sigma fundamentals and concepts & The DMAIC improvement cycle

  • Memorize the classic eight wastes (TIMWOODS) and produce two concrete examples of each from a process you know

  • Describe the five Lean principles as they apply to a service or administrative process, not just manufacturing

  • Explain the concepts of value-added versus non-value-added activity and classify ten activities from your own work

  • Walk through a DMAIC case end to end and identify which phase each described activity belongs to

  • Identify the main Yellow Belt terminology (CTQ, VOC, SIPOC, root cause, countermeasure, control plan) and write a one-line definition for each

Your checkpoint

A waste-spotting log with at least 16 entries (two per waste type) drawn from your own work area, each classified as value-added or non-value-added

Week 3

Define phase: problem definition, VOC, charters and stakeholders

  • Translate a vague complaint into a specific, measurable problem statement with location, time frame, and magnitude

  • Write a SMART problem statement and a matching goal statement for the same issue and check that they align

  • Collect Voice of the Customer from at least three stakeholders and convert each statement into a measurable CTQ

  • Draft a project charter containing problem, goal, scope, team, timeline, and expected benefit

  • Map the stakeholders for your chosen project and classify each as supportive, neutral, or resistant with a short engagement action

Your checkpoint

A complete draft project charter (one page) for a real or realistic workplace problem, including problem statement, goal with metric and target, scope boundaries, CTQs, and stakeholder list

Week 4

Measure phase: data collection, measurement basics and process mapping

  • Build a SIPOC diagram for your project process with at least four steps and clear supplier and customer entries

  • Draw a detailed flowchart of the current process and mark decision points and rework loops

  • Distinguish discrete from continuous data and select the right data type for each of your CTQs

  • Write an operational definition for each metric so that two people would measure it the same way

  • Design a simple data collection plan and check sheet, including who collects, how often, and where

Your checkpoint

A measurement package for your project: SIPOC, current-state flowchart, and a data collection plan with operational definitions for every metric

Week 5

Measure phase: data collection, measurement basics and process mapping & Analyze phase: root cause analysis and waste identification

  • Explain the components of measurement system analysis (accuracy, repeatability, reproducibility) at a Yellow Belt level and describe why a poor measurement system undermines the project

  • Calculate basic descriptive statistics (mean, median, range, standard deviation) for a small data set and interpret what they say about variation

  • Collect or simulate at least 20 data points for your project metric and summarize them in a simple run chart or histogram

  • Construct a cause-and-effect (fishbone) diagram for your problem with at least four categories and multiple causes per category

  • Apply the 5 Whys to at least two branches of the fishbone to reach a testable root cause

Your checkpoint

An analysis worksheet containing your summarized data (chart or table), a completed fishbone diagram, and a 5 Whys chain that ends in a verified or testable root cause

Week 6

Analyze phase: root cause analysis and waste identification

  • Use a Pareto chart or ranking to separate the vital few causes from the trivial many and justify your focus

  • Verify a suspected root cause against data rather than assumption and document the evidence

  • Apply the 5S principles to a workspace or information flow and describe the before and after state

  • Select improvement countermeasures using brainstorming and impact-effort screening, and reject at least one weak idea with a reason

  • Describe how poka-yoke (error proofing) and standard work reduce the chance of a defect recurring

Your checkpoint

A root-cause and countermeasure summary: prioritized causes with supporting data, plus a shortlist of two to three countermeasures with the expected effect on the metric for each

Week 7

Improve phase: improvement and waste-elimination tools & Control phase: standardization, monitoring and sustaining gains

  • Build a simple improvement plan that assigns each countermeasure an owner, a due date, and a success measure

  • Pilot one countermeasure on a small scale and record the before-and-after metric values

  • Write a control plan identifying the metric, the monitoring method, the frequency, the owner, and the reaction plan when the metric drifts

  • Create a standard operating procedure or one-point lesson that captures the new way of working

  • Explain how visual management and a short daily check sustain gains after the project team disbands

Your checkpoint

A control plan plus a one-page standard work document for the improved process, including a reaction plan for out-of-target results

Week 8

Control phase: standardization, monitoring and sustaining gains & Yellow Belt roles, teamwork and project support

  • Describe the Yellow Belt role in a DMAIC team: what a Yellow Belt contributes, what a Green Belt owns, and what a Black Belt or Master Black Belt does

  • Explain how to hand off project results and lessons learned to the process owner and document the closure

  • Complete a full timed practice exam and score it by domain to find weak areas

  • Review every missed question, write the correct concept in your own words, and re-test those topics

  • Summarize your end-to-end project in a short storyboard using the DMAIC headings

Your checkpoint

A closed-out project storyboard (problem, data, root cause, countermeasure, control) plus a scored practice exam with a written list of weak domains and the concepts you corrected

Milestones

Week 2: Without notes, list the eight wastes, the five DMAIC phases, and the five Lean principles correctly, and score at least 80% on a short self-quiz covering domains 1 and 2

Week 4: Your project charter is complete enough that a colleague can restate the problem, the goal metric, and the scope boundaries after reading it once, and your measurement plan has operational definitions for every CTQ

Week 6: You can show a data-backed link from at least one root cause to the problem metric, and your prioritized cause list is justified with a Pareto or ranking rather than opinion

Week 8: You score at least 80% on a full timed practice exam, have a completed control plan and storyboard, and can explain the Yellow Belt versus Green Belt versus Black Belt responsibilities from memory