EXIN LSSA Lean Six Sigma Yellow Belt study plan
EXIN LSSA Lean Six Sigma Yellow Belt · Give each week a clear focus.
8 weeks · About 6 hours per week
Lean and Six Sigma fundamentals and concepts & The DMAIC improvement cycle
Define Lean and Six Sigma in your own words and explain how the two approaches complement each other in a single improvement effort
Distinguish the five Lean principles (value, value stream, flow, pull, perfection) and give a workplace example of each
Distinguish the Six Sigma principle of reducing variation from the Lean principle of removing waste, and state which one addresses a given scenario
List the five DMAIC phases in order and write one sentence describing the purpose and main output of each
Explain the difference between DMAIC and a simple PDCA quick-fix cycle and state when each is appropriate
Your checkpoint
A one-page comparison sheet: Lean vs Six Sigma definitions, the five Lean principles with examples, and a five-row DMAIC table (phase, purpose, key output)
Lean and Six Sigma fundamentals and concepts & The DMAIC improvement cycle
Memorize the classic eight wastes (TIMWOODS) and produce two concrete examples of each from a process you know
Describe the five Lean principles as they apply to a service or administrative process, not just manufacturing
Explain the concepts of value-added versus non-value-added activity and classify ten activities from your own work
Walk through a DMAIC case end to end and identify which phase each described activity belongs to
Identify the main Yellow Belt terminology (CTQ, VOC, SIPOC, root cause, countermeasure, control plan) and write a one-line definition for each
Your checkpoint
A waste-spotting log with at least 16 entries (two per waste type) drawn from your own work area, each classified as value-added or non-value-added
Define phase: problem definition, VOC, charters and stakeholders
Translate a vague complaint into a specific, measurable problem statement with location, time frame, and magnitude
Write a SMART problem statement and a matching goal statement for the same issue and check that they align
Collect Voice of the Customer from at least three stakeholders and convert each statement into a measurable CTQ
Draft a project charter containing problem, goal, scope, team, timeline, and expected benefit
Map the stakeholders for your chosen project and classify each as supportive, neutral, or resistant with a short engagement action
Your checkpoint
A complete draft project charter (one page) for a real or realistic workplace problem, including problem statement, goal with metric and target, scope boundaries, CTQs, and stakeholder list
Measure phase: data collection, measurement basics and process mapping
Build a SIPOC diagram for your project process with at least four steps and clear supplier and customer entries
Draw a detailed flowchart of the current process and mark decision points and rework loops
Distinguish discrete from continuous data and select the right data type for each of your CTQs
Write an operational definition for each metric so that two people would measure it the same way
Design a simple data collection plan and check sheet, including who collects, how often, and where
Your checkpoint
A measurement package for your project: SIPOC, current-state flowchart, and a data collection plan with operational definitions for every metric
Measure phase: data collection, measurement basics and process mapping & Analyze phase: root cause analysis and waste identification
Explain the components of measurement system analysis (accuracy, repeatability, reproducibility) at a Yellow Belt level and describe why a poor measurement system undermines the project
Calculate basic descriptive statistics (mean, median, range, standard deviation) for a small data set and interpret what they say about variation
Collect or simulate at least 20 data points for your project metric and summarize them in a simple run chart or histogram
Construct a cause-and-effect (fishbone) diagram for your problem with at least four categories and multiple causes per category
Apply the 5 Whys to at least two branches of the fishbone to reach a testable root cause
Your checkpoint
An analysis worksheet containing your summarized data (chart or table), a completed fishbone diagram, and a 5 Whys chain that ends in a verified or testable root cause
Analyze phase: root cause analysis and waste identification
Use a Pareto chart or ranking to separate the vital few causes from the trivial many and justify your focus
Verify a suspected root cause against data rather than assumption and document the evidence
Apply the 5S principles to a workspace or information flow and describe the before and after state
Select improvement countermeasures using brainstorming and impact-effort screening, and reject at least one weak idea with a reason
Describe how poka-yoke (error proofing) and standard work reduce the chance of a defect recurring
Your checkpoint
A root-cause and countermeasure summary: prioritized causes with supporting data, plus a shortlist of two to three countermeasures with the expected effect on the metric for each
Improve phase: improvement and waste-elimination tools & Control phase: standardization, monitoring and sustaining gains
Build a simple improvement plan that assigns each countermeasure an owner, a due date, and a success measure
Pilot one countermeasure on a small scale and record the before-and-after metric values
Write a control plan identifying the metric, the monitoring method, the frequency, the owner, and the reaction plan when the metric drifts
Create a standard operating procedure or one-point lesson that captures the new way of working
Explain how visual management and a short daily check sustain gains after the project team disbands
Your checkpoint
A control plan plus a one-page standard work document for the improved process, including a reaction plan for out-of-target results
Control phase: standardization, monitoring and sustaining gains & Yellow Belt roles, teamwork and project support
Describe the Yellow Belt role in a DMAIC team: what a Yellow Belt contributes, what a Green Belt owns, and what a Black Belt or Master Black Belt does
Explain how to hand off project results and lessons learned to the process owner and document the closure
Complete a full timed practice exam and score it by domain to find weak areas
Review every missed question, write the correct concept in your own words, and re-test those topics
Summarize your end-to-end project in a short storyboard using the DMAIC headings
Your checkpoint
A closed-out project storyboard (problem, data, root cause, countermeasure, control) plus a scored practice exam with a written list of weak domains and the concepts you corrected
Milestones
Week 2: Without notes, list the eight wastes, the five DMAIC phases, and the five Lean principles correctly, and score at least 80% on a short self-quiz covering domains 1 and 2
Week 4: Your project charter is complete enough that a colleague can restate the problem, the goal metric, and the scope boundaries after reading it once, and your measurement plan has operational definitions for every CTQ
Week 6: You can show a data-backed link from at least one root cause to the problem metric, and your prioritized cause list is justified with a Pareto or ranking rather than opinion
Week 8: You score at least 80% on a full timed practice exam, have a completed control plan and storyboard, and can explain the Yellow Belt versus Green Belt versus Black Belt responsibilities from memory