FL General Contractor key terms
FL General Contractor · Get comfortable with the vocabulary.
- Retainage
- Related: Substantial Completion, Schedule of Values
A percentage of each progress payment withheld by the owner until substantial or final completion, protecting the owner against liens and incomplete work while reducing the contractor's cash flow.
- Schedule of Values
- Related: Retainage, Change Order
An itemized breakdown of the contract sum allocated to work components, used to evaluate progress payment requests and to track costs against the contract amount.
- Change Order
- Related: Constructive Change, Schedule of Values
A written, signed modification to the contract documents adjusting scope, price, or time, executed by the owner and contractor after agreement on the adjustment.
- Constructive Change
- Related: Change Order, Differing Site Conditions
A change resulting from owner direction, defective plans, or differing site conditions without a formal change order; the contractor may pursue equitable adjustment through written notice and documentation.
- Differing Site Conditions
- Related: Constructive Change, Geotechnical Report
Subsurface or physical conditions materially different from those shown in the contract documents or unusual for the work, entitling the contractor to notice and possible adjustment.
- Substantial Completion
- Related: Retainage, Punch List
The stage when the work is sufficiently complete for its intended use, triggering warranty start, release of retainage, and the punch list process.
- Punch List
- Related: Substantial Completion, Final Payment
A written list of incomplete or deficient items identified at substantial completion that the contractor must correct before final acceptance and final payment.
- Final Payment
- Related: Punch List, Lien Waiver
The last payment under the contract, made after all punch list work, closeout documents, and lien releases are accepted by the owner.
- Lien Waiver
- Related: Notice to Owner, Final Payment
A document in which a party relinquishes lien rights, typically conditioned on receipt of payment; unconditional waivers take effect immediately upon signing.
- Notice to Owner
- Related: Lien Waiver, Construction Lien
A Florida statutory notice given by a subcontractor or supplier to the owner within 45 days of first furnishing labor or materials, preserving lien rights on the property.
- Construction Lien
- Related: Notice to Owner, Lien Waiver
A statutory claim against real property recorded by an unpaid party who furnished labor or materials, subject to strict Florida notice, recording, and foreclosure deadlines.
- Bid Bond
- Related: Performance Bond, Payment Bond
A surety instrument guaranteeing that a bidder will enter the contract and furnish required bonds if awarded; failure may expose the bidder to the difference in price.
- Performance Bond
- Related: Bid Bond, Payment Bond
A surety bond securing the contractor's completion of the contract according to its terms, giving the owner a remedy if the contractor defaults.
- Payment Bond
- Related: Performance Bond, Construction Lien
A surety bond protecting subcontractors and suppliers by ensuring they are paid for labor and materials furnished on bonded construction work.
- Critical Path Method
- Related: Float, Baseline Schedule
A scheduling technique identifying the longest sequence of dependent activities; delay to any critical activity delays project completion unless the network is adjusted.
- Float
- Related: Critical Path Method, Baseline Schedule
The amount of time an activity can slip without delaying the project completion date; total float differs from free float, which affects only the next activity.
- Baseline Schedule
- Related: Critical Path Method, Float
The approved initial project schedule against which actual progress and delay claims are measured, updated only through formal revision.
- Geotechnical Report
- Related: Differing Site Conditions, Bearing Capacity
A soils investigation report describing subsurface strata, groundwater, bearing capacity, and recommendations that inform foundation design and excavation methods.
- Bearing Capacity
- Related: Geotechnical Report, Spread Footing
The maximum pressure soil or rock can support without shear failure or excessive settlement, used to size footings and determine allowable foundation loads.
- Spread Footing
- Related: Bearing Capacity, Pile Foundation
A shallow foundation that distributes column or wall loads over a widened base area so soil pressure stays within the allowable bearing capacity.
- Pile Foundation
- Related: Spread Footing, Bearing Capacity
A deep foundation using driven or drilled elements to transfer loads through weak upper soils to competent strata or by friction along the pile shaft.
- Dewatering
- Related: Shoring, Hydrostatic Pressure
Controlled removal of groundwater from an excavation using pumps, wells, or wellpoints to keep the work dry and stable during construction.
- Shoring
- Related: Dewatering, Excavation Safety
Temporary support systems such as bracing, sheeting, or underpinning that prevent soil collapse and protect adjacent structures during excavation.
- Excavation Safety
- Related: Shoring, Competent Person
Practices including sloping, benching, or shoring of trenches, spoil pile setbacks, and competent person inspections required to protect workers from cave-ins.
- Competent Person
- Related: Excavation Safety, Fall Protection
An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective action, required for excavation, scaffolding, and fall protection inspections.
- Fall Protection
- Related: Competent Person, Excavation Safety
Systems and procedures, such as guardrails, personal fall arrest, and controlled access zones, required where workers are exposed to falls of six feet or more.
- Concrete Slump Test
- Related: Water-Cement Ratio, Curing
A field consistency test measuring the vertical settlement of a standard concrete cone, used to judge workability against the specified slump range.
- Water-Cement Ratio
- Related: Concrete Slump Test, Curing
The mass of water divided by the mass of cementitious material in a mix; lower ratios increase strength and durability but reduce workability.
- Curing
- Related: Water-Cement Ratio, Concrete Slump Test
Maintaining adequate moisture and temperature after concrete placement so cement hydration continues and the concrete develops specified strength and durability.
- Reinforcement Cover
- Related: Curing, Hydrostatic Pressure
The concrete depth between the outer surface and the nearest reinforcing steel, protecting bars from corrosion and fire and ensuring bond.
- Mortar Joint
- Related: Flashing, Weep Hole
The layer of mortar between masonry units whose thickness and tooling affect bond, compressive strength, and water penetration resistance.
- Weep Hole
- Related: Flashing, Mortar Joint
A small opening in masonry or cladding that drains accumulated moisture from behind the wall assembly to the exterior.
- Flashing
- Related: Weep Hole, Air Barrier
Sheet metal or membrane installed at roof, wall, and opening intersections to direct water away from joints and prevent moisture intrusion into the building envelope.
- Air Barrier
- Related: Flashing, Vapor Retarder
A continuous system of materials that limits uncontrolled air leakage through the building envelope, improving energy performance and moisture control.
- Vapor Retarder
- Related: Air Barrier, Hydrostatic Pressure
A low-permeability material placed to limit moisture vapor diffusion through an assembly, positioned according to climate to avoid trapping moisture.
- Hydrostatic Pressure
- Related: Dewatering, Vapor Retarder
The pressure exerted by standing or flowing water against a surface, which below-grade waterproofing and drainage systems must resist and relieve.
- Wind Uplift
- Related: Flashing, Load Path
The upward force wind exerts on roof coverings and cladding, requiring attachment and edge detailing designed for the site's wind speed.
- Load Path
- Related: Shear Wall, Wind Uplift
The continuous route by which gravity, wind, and seismic forces travel from the point of application through structural members to the foundation.
- Shear Wall
- Related: Load Path, Wind Uplift
A wall designed to resist lateral forces in its own plane, transferring wind and seismic loads down to the foundation through diaphragm and collector action.
- Coordination Drawing
- Related: Clash Detection, Sleeve
A combined drawing overlaying structural, mechanical, electrical, and plumbing systems to identify clashes and establish routing and penetration locations before installation.
- Clash Detection
- Related: Coordination Drawing, Sleeve
The process of comparing building models or drawings to find physical conflicts between systems, such as ductwork intersecting structural beams, before construction.
- Sleeve
- Related: Coordination Drawing, Firestop
A pipe or formed opening cast or drilled through concrete or masonry to allow a service line to pass while preserving structure and allowing sealing.
- Firestop
- Related: Sleeve, Fire-Resistance Rating
An approved material or assembly that seals penetrations and joints in rated walls and floors to maintain the fire-resistance rating of the barrier.
- Fire-Resistance Rating
- Related: Firestop, Life Safety Plan
The period, in hours, that a building element resists fire exposure under standardized testing, governing structural protection and separation requirements.
- Life Safety Plan
- Related: Fire-Resistance Rating, Certificate of Occupancy
A drawing showing egress paths, exit widths, travel distances, and rated separations used to demonstrate code compliance and coordinate construction.
- Certificate of Occupancy
- Related: Life Safety Plan, Notice of Commencement
An official document issued after inspection confirms a building complies with applicable codes and approved plans, permitting legal occupancy.
- Notice of Commencement
- Related: Notice to Owner, Construction Lien
A Florida document recorded and posted before starting improvements, identifying the owner, contractor, surety, and lender for lien law purposes.
- Building Permit
- Related: Certificate of Occupancy, Notice of Commencement
Written authorization from the local building department to construct or alter work in accordance with approved plans and applicable Florida codes.
- Threshold Building
- Related: Special Inspector, Building Permit
A Florida building over three stories or 50 feet in height, or of assembly occupancy with occupant load over 500, requiring special inspector oversight.
- Special Inspector
- Related: Threshold Building, Building Permit
A Florida-licensed architect or engineer, or qualified firm, retained to perform threshold building inspections and report findings to the building official.
- Quality Assurance Plan
- Related: Special Inspector, Submittal
A documented program defining inspection, testing, and acceptance procedures used to verify that materials and workmanship meet the contract documents.
- Submittal
- Related: Quality Assurance Plan, Coordination Drawing
Product data, shop drawings, or samples submitted by the contractor for the designer's review to confirm compliance before fabrication or installation.