FL General Contractor study plan
FL General Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Business and Financial Management & Contract Administration and Project Management
Build a one-page formula sheet covering markup vs. margin, overhead allocation, retainage, and simple/compound interest, then solve 15 practice calculation problems without notes
Reconstruct the Florida Construction Lien Law timeline from memory: Notice to Owner, Notice of Commencement, 90-day lien filing, and the one-year suit deadline, and write each step with its statutory trigger
Draft a mock AIA-style contract summary listing scope, payment terms, change-order procedure, and dispute resolution, then annotate where Florida statute overrides the boilerplate
Classify 20 sample project tasks as schedule-driven or cost-driven and identify which contract clause governs each
Your checkpoint
A single reference sheet (max 4 pages) combining the financial formulas, lien timeline, and contract-clause map, scored at 80% or better on a self-written 25-question quiz
Contract Administration and Project Management & Safety, Codes, and Florida Regulatory Requirements
Sequence a 12-activity critical path for a small commercial build, calculate total float on each path, and identify the activities where a one-day slip moves the completion date
Write the required contents of a written safety program for a Florida jobsite, including fall protection thresholds and excavation protective-system triggers
Map the permitting sequence for a Florida project from notice of commencement through certificate of occupancy, naming the inspecting authority at each step
Explain the contractor licensing and qualifying-agent rules that apply to a Florida general contractor, including the scope limits of a certified vs. registered license
Your checkpoint
A one-page critical-path diagram with float values plus a permitting and licensing checklist that a peer could follow without asking questions
Structures and Structural Systems & Concrete, Masonry, and Metals
Solve 12 beam and column problems for reactions, shear, bending moment, and deflection using standard load combinations
Compare wood, steel, and concrete framing systems on span capability, fire resistance, and connection type, and match each to a building occupancy
Identify reinforcement placement, cover, lap splice, and formwork-removal requirements for a reinforced concrete beam and slab
Differentiate masonry wall types, mortar and grout roles, and the purpose of flashing, weep holes, and control joints
Explain how structural steel connections and bolting/welding inspection requirements differ from concrete placement inspection
Your checkpoint
A worked problem set of 12 structural calculations with free-body diagrams, each answer checked against a second method or a sanity check on magnitude
Site Work, Excavation, and Foundations & Building Envelope, Moisture Protection, and Thermal Systems
Classify soils by grain size and plasticity and select the appropriate foundation type for five described site conditions
Compute lateral earth pressures and size shoring, sloping, and benching for a 10-foot excavation, citing the protective-system trigger depth
Trace water migration through a wall assembly and place water-resistive barrier, flashing, and drainage plane in correct sequence
Compare below-grade waterproofing and dampproofing and justify the choice for a basement, a slab-on-grade, and a retaining wall
Assemble a continuous air, thermal, and vapor control strategy for a wall section and mark where each layer belongs
Your checkpoint
A hand-drawn wall-and-foundation section with every membrane, flashing, and insulation layer labeled and a written justification for each material choice
Carpentry, Roofing, and Finishes & Building Envelope, Moisture Protection, and Thermal Systems
Lay out roof framing members and calculate rafter length, slope, and ridge height for three roof pitches
Sequence a roofing installation from deck to ridge and identify the flashing details at valleys, penetrations, and wall intersections
Specify finish schedules for drywall levels, tile, and flooring, matching each finish to a wet-area or high-traffic condition
Explain how window and door selection, glazing, and installation detailing affect envelope performance and condensation risk
Diagnose five described moisture failures (ice damming, window leak, roof valley, crawlspace, stucco crack) and prescribe the corrective detail
Your checkpoint
A roof and envelope detail package with three pitched-roof framing calculations and five written failure diagnoses, each naming the defective layer
Mechanical, Electrical, and Plumbing Coordination & Safety, Codes, and Florida Regulatory Requirements
Coordinate MEP rough-in sequencing against structural and envelope milestones and list the three most common clash points on a commercial job
Size a simple duct, water, and drain line using standard rules of thumb, and explain why each result needs verification by the trade
Identify electrical load, panel, grounding, and GFCI/AFCI requirements relevant to a general contractor's scope of coordination
Summarize the Florida Building Code chapters that most often drive general contractor decisions, including wind-borne debris, flood, and accessibility provisions
List the inspection hold points a general contractor must schedule and the consequences of covering work before inspection
Your checkpoint
An MEP coordination matrix (trade x milestone) plus a code-and-inspection checklist covering at least 15 hold points with the governing requirement cited
Business and Financial Management & Contract Administration and Project Management & Safety, Codes, and Florida Regulatory Requirements
Run a full cost estimate for a small project including labor, material, equipment, overhead, and profit, then convert it to a bid with a stated contingency
Build a 13-week cash-flow projection and identify the week of maximum working-capital need
Respond to a simulated change-order dispute by drafting the written notice, cost breakdown, and time-extension request
Apply Florida lien and prompt-payment rules to three payment scenarios and state who can recover what
Audit a mock jobsite against 20 OSHA and Florida-specific safety requirements and record each deficiency
Your checkpoint
A complete mock bid package (estimate, schedule of values, cash-flow curve) plus a written change-order response and a 20-item safety audit with corrective actions
Business and Financial Management & Contract Administration and Project Management & Structures and Structural Systems & Site Work, Excavation, and Foundations & Concrete, Masonry, and Metals & Carpentry, Roofing, and Finishes & Building Envelope, Moisture Protection, and Thermal Systems & Mechanical, Electrical, and Plumbing Coordination & Safety, Codes, and Florida Regulatory Requirements
Take two full-length timed practice exams and log every missed question by domain and by error type (knowledge gap, misread, calculation slip)
Re-drill the two weakest domains until each reaches 80% or better on a fresh 20-question set
Recite from memory the ten formulas, timelines, and code thresholds most likely to be tested, without reference material
Simulate exam-day logistics: confirm test-site or remote-proctoring requirements, allowed references, and identification rules
Your checkpoint
A scored error log from both practice exams showing domain-by-domain accuracy, with a written remediation note for every question missed twice
Milestones
Week 2: Score 75% or better on a 30-question self-test drawn only from Business/Financial Management and Contract Administration, with the lien timeline and critical-path float calculations fully correct
Week 4: Explain aloud, without notes, how load travels from roof to footing and where water is stopped at each envelope layer; pass a 20-question structures/sitework/envelope quiz at 75% or better
Week 6: Complete a 40-question mixed quiz across all nine domains at 70% or better, with no domain below 50%, and identify the two domains needing the most week-7 attention
Week 8: Achieve 80% or better on two consecutive full-length timed practice exams, with every domain at or above 70% and no repeated error on a previously logged question