FOA CFOS/C · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fiber optic technology fundamentals and the fiber optic workforce

  • Explain how total internal reflection, numerical aperture, and core/cladding index difference determine light guidance in multimode and singlemode fiber

  • Distinguish singlemode from multimode (step-index vs graded-index) and OM1-OM5 vs OS1/OS2 in terms of core size, wavelength, bandwidth, and typical reach

  • Identify attenuation and dispersion mechanisms and state typical loss per kilometer at 850, 1310, and 1550 nm

  • Map the roles of installer, splicer, tester, inspector, and project manager across a typical deployment so you can describe who owns each task

Your checkpoint

A one-page fiber-physics cheat sheet (index, NA, core sizes, wavelength/loss table, and role map) self-quizzed to 90% recall without notes

Week 2

Fiber optic technology fundamentals and the fiber optic workforce & Premises cabling and communications cabling

  • Compare loose-tube, tight-buffered, ribbon, and armored cable constructions and select the right one for riser, plenum, aerial, and direct-buried routes

  • Read and apply the color-code sequences for 12-fiber and 24-fiber cables and for single-fiber and ribbon splices

  • Identify connector families (LC, SC, ST, MPO/MTP) and polish styles (PC, UPC, APC) and explain why APC cannot mate with UPC

  • Select patch cords, pigtails, cassettes, and enclosures that match a given cable type and polarity requirement

Your checkpoint

A component selection worksheet covering five scenario descriptions (one per cable environment) with justified cable, connector, and polish choices

Week 3

Premises cabling and communications cabling & Fiber optic cable plant installation standards and workmanlike installation

  • Size and route pathways and spaces (conduit fill, bend radius, tray loading) for a sample building run per common codes and standards practice

  • Plan a horizontal and backbone cabling topology including entrance facility, cross-connects, and consolidation point placement

  • Write a sequence of work for a cable pull that protects fiber: pull tension limits, bend radius minimums, lubricants, and support spacing

  • List fire-rating and marking requirements that apply to plenum, riser, and general-purpose cable and where each is permitted

Your checkpoint

A two-page installation method statement for a 12-floor riser plus horizontal distribution, including pathway sizing, pull plan, and fire-rating table

Week 4

Fiber optic cable plant installation standards and workmanlike installation

  • Demonstrate correct fiber preparation: strip lengths, cleaning sequence, cleave angle tolerance, and splice protection

  • Compare fusion splicing and mechanical splicing and justify a choice for singlemode backbone versus multimode horizontal work

  • Describe connector field-termination methods (anaerobic adhesive, epoxy/polish, splice-on) and their inspection and loss implications

  • Identify workmanship defects (cracked ferrule, epoxy bead, offset cleave, jacket damage, wrong bend radius) and state the corrective action for each

Your checkpoint

A scored workmanship inspection checklist applied to 10 described or photographed defects, with correct cause and corrective action for at least 9 of 10

Week 5

Fiber optic testing, inspection, cleaning and loss budgets

  • Explain insertion loss, reflectance, and ORL measurement principles and choose the correct test method (one-jumper, two-jumper, reference-cord) for a given link

  • Set up and interpret an OLTS test against a loss budget, including test-wavelength selection and bidirectional reporting

  • Compute a link loss budget from component loss allowances and compare it to measured loss to pass or fail a link

  • Interpret OTDR traces: events, dead zones, ghosts, gainers, and how launch and receive cables affect the measurement

  • Apply inspection and cleaning procedure at every mating point and describe when a scope inspection is mandatory

Your checkpoint

A completed loss-budget spreadsheet plus pass/fail verdicts for six sample links, each with a written justification of method, wavelengths, and margin

Week 6

Fiber optic testing, inspection, cleaning and loss budgets & Fiber optic network design and project management

  • Design a test plan for a project: sampling, 100% versus sampled testing, documentation, and acceptance criteria

  • Translate a customer requirement into a network architecture: point-to-point, PON, or centralized versus distributed split, with justification

  • Produce a link-loss design calculation that includes connector pairs, splice count, cable length, and maintenance margin

  • Identify documentation deliverables (as-builts, test reports, labeling scheme, warranty package) and who signs off on each

Your checkpoint

A design-and-test package for one hypothetical campus link: architecture choice, loss budget with margin, test plan, and documentation list

Week 7

Fiber optic network design and project management & Fiber optic technology fundamentals and the fiber optic workforce

  • Build a work breakdown structure and schedule for a fiber project, sequencing pathway, pull, splice, test, and closeout with dependencies

  • Estimate labor hours and material quantities for a defined scope and identify the top three cost and schedule risks

  • Explain safety and workforce practices: laser safety classes, eye protection, confined space, ladder and aerial work, and disposal of fiber scraps

  • Rehearse explaining a technical recommendation to a non-technical stakeholder in under two minutes

Your checkpoint

A project plan for a 200-link deployment: WBS, schedule, labor estimate, risk register, and a one-paragraph stakeholder summary

Week 8

Fiber optic technology fundamentals and the fiber optic workforce & Premises cabling and communications cabling & Fiber optic cable plant installation standards and workmanlike installation & Fiber optic testing, inspection, cleaning and loss budgets & Fiber optic network design and project management

  • Review weak areas flagged in weeks 1-7 and re-derive any missed calculations from scratch

  • Complete timed mixed-domain practice sets and log every error by domain and root cause

  • Recite the key numeric limits (bend radius, pull tension, loss allowances, wavelength/loss pairs, cleave angle) from memory

  • Confirm exam-day logistics, allowed references, and a pacing strategy for the question count

Your checkpoint

A final error log showing at least 90% accuracy on the last timed mixed-domain set, plus a one-page numeric-limits recall sheet

Milestones

Week 2: Score 85% or higher on a 30-question self-test covering only domains 1 and 2, with no notes

Week 4: Complete the workmanship checklist at 90% accuracy and correctly state pull-tension and bend-radius limits from memory

Week 6: Produce a loss budget that matches an independently recalculated answer within 0.2 dB and correctly pass/fail all six practice links

Week 8: Achieve 90% or higher on a full-length timed mixed-domain practice set and show the error log trending down across the final three sets