FOA CFOS/DAS · Give each week a clear focus.
8 weeks · About 6 hours per week
Fiber Optic Network Design
Map the FOA CFOS/DAS domain-1 outline into a personal checklist of subtopics, marking each item as known, shaky, or unknown
Define optical power budget terms in your own words: launch power, connector loss, splice loss, fiber attenuation, margin, and receiver sensitivity
Compute three sample link power budgets by hand at 850 nm, 1310 nm, and 1550 nm using published attenuation values
Set up a formula sheet and unit-conversion reference (dB vs dBm, mW to dBm) that you will reuse all eight weeks
Your checkpoint
A dated one-page power-budget worksheet with three worked links and a subtopic checklist scored known/shaky/unknown
Fiber Optic Network Design
Compare multimode and single-mode fiber types by core size, bandwidth, and typical reach, and justify a choice for three described campus scenarios
Calculate bandwidth-distance limits and modal dispersion effects for a given multimode link length
Select connector and splice types for indoor, outdoor, and high-density environments, stating one tradeoff for each choice
Sketch two physical topologies (star and ring) and annotate where redundancy and failure points sit
Your checkpoint
A two-page design memo recommending fiber type, connectors, and topology for three distinct scenarios with numeric justification
Fiber Optic Network Design
Explain how link-loss budgets feed into standards-based reach limits and where margin is deliberately reserved
Size a cable plant for a described building, estimating sheath counts, spare fibers, and pathway capacity
Identify documentation a designer must produce: loss budget, route map, fiber assignment chart, and as-built records
Distinguish design constraints that come from codes, environment, and customer requirements, and note how each changes the budget
Your checkpoint
A complete design package for one fictional building: loss budget, fiber assignment chart, and route sketch with spare-fiber rationale
Fiber Optic Network Design & Project Planning and Management
Review your week 1-3 deliverables and close every subtopic still marked shaky or unknown
Draft a work breakdown structure for a fiber installation project, decomposing to tasks of one day or less
Sequence WBS tasks into a dependency network and identify the critical path
Estimate labor hours per task using a stated productivity assumption and flag the riskiest estimate
Your checkpoint
A WBS with dependency network and critical path for a 40-fiber campus link, plus a one-paragraph risk note
Project Planning and Management
Build a project schedule with durations, milestones, and float, then identify which delays consume float versus move the end date
Define acceptance-testing criteria (insertion loss, ORL, length) and write them as pass/fail clauses
Plan a testing and commissioning sequence that respects when splicing, termination, and certification can occur
List safety and permit requirements that gate the schedule and state the lead time for each
Your checkpoint
A one-page schedule with milestones, float values, and a pass/fail acceptance-test clause set
Project Planning and Management
Write a communication plan naming stakeholders, reporting cadence, and escalation triggers
Describe how to handle a change order: who approves, what gets re-baselined, and how cost and schedule impact is documented
Identify the records a project manager must collect for handover and explain why each matters to the owner
Practice a short verbal status update covering scope, schedule, cost, and risk in under two minutes
Your checkpoint
A stakeholder communication plan plus a change-order template with fields for cost, schedule, and approval
Fiber Optic Network Design & Project Planning and Management
Re-derive two power budgets from memory and check them against your week 1 worksheet
Walk through a full project scenario end to end, from requirements to design to schedule to handover, noting where the two domains interact
Build a 30-question self-test mixing design calculations and project-management judgment calls, then score it
Revisit every item you missed and write the corrected reasoning in one sentence each
Your checkpoint
A scored 30-question self-test with one-sentence corrections for every miss
Fiber Optic Network Design & Project Planning and Management
Condense both domains into a single review sheet of formulas, standards references, and decision rules
Complete two timed practice sets under exam conditions and record your pacing
Target your two weakest subtopics with focused re-study and re-test them
Restate the ten concepts you are least confident about and confirm each against a reliable source
Your checkpoint
A final one-page review sheet plus timed practice scores showing improvement over the week
Milestones
Week 2: You can compute a link power budget unaided and defend a fiber-type choice with numbers
Week 4: Domain 1 design package is complete and every checklist item is marked known or resolved
Week 6: You can produce a schedule with critical path and a pass/fail acceptance clause without notes
Week 8: Timed practice scores are stable and rising, and no subtopic remains marked unknown