FOA CFOS/O · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fiber optic cable plant installation (outside plant)

  • Sketch a full outside plant route from a central office to a first splice point, labeling trench, duct, aerial, and building-entry segments with their depth or clearance requirements

  • List the physical forces and environmental loads (tension, bend radius, crush, water ingress, UV, temperature swing) that an OSP cable must survive, and state where each is controlled in installation

  • Compare direct-buried, duct, aerial, and submarine installation environments and write one paragraph per environment on what the installer must protect

  • Build a one-page glossary of OSP plant terms (handhole, pedestal, slack loop, splice closure, NID, conduit fill) and self-quiz until you can define each from memory

Your checkpoint

A hand-drawn or CAD route map of a 2 km hypothetical OSP span with all segment types, depths, and hardware callouts annotated and a 1-page glossary attached

Week 2

Outside plant fiber optic cable types and hardware

  • Classify at least six OSP cable constructions (loose tube, tight buffer, armored, toneable, figure-8, microduct) by jacket material, strength member type, and intended environment

  • Match each cable construction to the hardware it terminates into: closures, pedestals, handholes, aerial strand and lashing, and building entrance

  • Explain how water-blocking (gel vs. dry) and rodent protection change handling, storage, and splice practice

  • Practice identifying cable by reading a printed jacket legend and translate the legend into a compatibility decision for a given route

Your checkpoint

A comparison table of 8 OSP cable types with columns for strength member, jacket, water blocking, typical environment, and matching hardware, plus 10 self-written identification flashcards

Week 3

Cable placement, pulling and air-blowing installation methods

  • Calculate maximum pulling tension and minimum bend radius for three sample cables using their published specs, and state the safety factor you would apply

  • Sequence a duct-pull job end to end: mandrel and brush proofing, pull-line placement, lubricant choice, tension monitoring, and slack management

  • Describe air-blowing installation parameters (duct condition, cable stiffness, airflow, feed rate) and predict when blowing will stall

  • Draft a pre-installation site survey checklist that a crew lead would actually use before pulling or blowing cable

Your checkpoint

A written installation method statement for one duct route including tension calculation, lubricant and pull-line plan, blowing parameters, and an abort criterion, reviewed against the cable datasheet

Week 4

Cable placement, pulling and air-blowing installation methods & OSP safety practices and workmanship standards

  • Demonstrate or verbally rehearse the correct use of pull grips, swivels, breakaway links, and figure-8 slack loops with a partner critiquing technique

  • Identify the confined-space, trenching, and aerial-work hazards on your practice route and match each to a control measure (shoring, gas monitoring, fall protection, traffic control)

  • Explain laser safety classes and when eye protection or optical power shutdown is required during placement and testing

  • Write the emergency response sequence for a cable strike, a fall, and an RF or optical exposure incident

Your checkpoint

A completed job hazard analysis (JHA) form for the week 3 route covering at least 10 hazards with controls, plus a pass/fail self-check of your pulling technique against a written rubric

Week 5

Splicing, termination and connector cleaning

  • Perform a fusion splice on loose-tube single-mode fiber and document cleave angle, splice loss estimate, and splice protection sleeve placement

  • Assemble a mechanical splice and compare its loss and rework characteristics against the fusion splice

  • Terminate a connector by both field-install and pre-terminated pigtail methods, then inspect each end with a scope and grade it against a standard pass/fail chart

  • Execute the wet-dry-clean inspection cycle and explain why dry cleaning alone fails on contaminated endfaces

Your checkpoint

A splice and termination log recording 4 fusion splices, 2 mechanical splices, and 4 connector terminations with measured or estimated loss values and scope inspection grades for every endface

Week 6

Testing and troubleshooting OSP cable plants (loss, OTDR, fault location)

  • Set a reference on an OTDR, choose pulse width and range for a 2 km and a 20 km span, and explain the tradeoff between dead zone and dynamic range

  • Interpret an OTDR trace by locating connectors, splices, bends, and a reflective event, and convert distance readings into physical fault locations

  • Perform a bidirectional loss test with a light source and power meter and calculate link loss budget against a design allowance

  • Diagnose three injected faults (dirty connector, tight bend, bad splice) from trace and loss data alone

Your checkpoint

A troubleshooting report on three fault scenarios with OTDR trace screenshots or sketches, bidirectional loss measurements, and a written root-cause conclusion for each

Week 7

Testing and troubleshooting OSP cable plants (loss, OTDR, fault location) & Fiber optic cable plant installation (outside plant)

  • Build a complete acceptance test package for the week 1 route: loss budget, OTDR baselines in both directions, and documentation fields required for handover

  • Calculate a link loss budget from component losses and compare it to measured values, flagging any span that fails

  • Locate a simulated break using OTDR distance, then verify the physical location against route records and slack accounting

  • Review workmanship against standard practices for cable support spacing, bend radius, slack storage, and closure sealing

Your checkpoint

A mock acceptance package for the 2 km route containing loss budget, bidirectional OTDR results, fault location worksheet, and a workmanship punch list of at least 8 items

Week 8

Fiber optic cable plant installation (outside plant) & Outside plant fiber optic cable types and hardware & Cable placement, pulling and air-blowing installation methods & Splicing, termination and connector cleaning & Testing and troubleshooting OSP cable plants (loss, OTDR, fault location) & OSP safety practices and workmanship standards

  • Re-derive from memory the key numbers for each domain: bend radii, pulling tension limits, loss budgets, splice loss targets, and clearance depths

  • Complete a timed 60-question mixed practice set and categorize every miss by domain

  • Re-teach your three weakest subtopics aloud or in writing without notes, then correct the gaps you find

  • Assemble a one-page pre-exam reference sheet limited to what you can legally bring and what you must memorize

Your checkpoint

A scored 60-question practice exam with error analysis by domain and a personal one-page memory sheet covering all six domains

Milestones

Week 2: Can name the strength member, jacket, and water-blocking method for 6 OSP cable types and match each to its hardware without notes

Week 4: Can state maximum pulling tension and minimum bend radius for a given cable from its datasheet and complete a JHA unaided

Week 5: Achieves a passing scope grade on at least 3 of 4 connector endfaces and can explain each failure mode observed

Week 6: Correctly identifies all three injected faults from OTDR and loss data with written root cause

Week 8: Scores at least 80 percent on the mixed 60-question set with no single domain below 70 percent