Drinking Water Treatment

  • Detention time = basin volume ÷ flow. Conventional treatment typically uses 20–40 minutes of flocculation and 2–4 hours of sedimentation.

  • Surface overflow rate (gpm/ft²) = flow (gpm) ÷ clarifier surface area (ft²); a lower rate yields longer detention and better particle capture.

  • The jar test establishes coagulant dose and target pH; the optimum produces the lowest settled and filtered turbidity at the lowest chemical cost.

  • Alum coagulation works best near pH 5.5–7.5 and consumes roughly 0.45 mg/L of alkalinity as CaCO3 per mg/L of alum applied.

  • Rapid sand filters are designed at 2–4 gpm/ft² and are backwashed at terminal head loss (about 8–10 ft) or on turbidity breakthrough, with 20–30% bed expansion.

  • CT (mg/L·min) = disinfectant residual concentration × contact time; required CT increases as pH rises and decreases as water temperature rises.

  • Chlorine demand = applied dose − residual after the contact period; breakpoint chlorination must be passed before a free chlorine residual persists.

  • For conventional filtration, combined filter effluent turbidity must be ≤0.30 NTU in at least 95% of monthly samples and never exceed 1 NTU.

  • Aeration oxidizes soluble iron (Fe2+ to Fe3+) and strips H2S, CO2, and volatile organics; PAC handles seasonal taste and odor while GAC removes dissolved organics.

Quick reference

Drinking Water Distribution

  • Maintain 20 psi minimum residual pressure at all points under normal demand and fire flow; lower pressures require assessment for contamination risk.

  • A detectable free chlorine residual must persist throughout the system; operators commonly target at least 0.2 mg/L leaving the plant and at dead ends.

  • Flushing scours mains at velocities of 2.5 ft/s or greater; unidirectional flushing moves from clean to dirty areas, valve to hydrant.

  • Hazen-Williams head loss: hf = 10.44 · L · Q^1.85 ÷ (C^1.85 · d^4.87) with Q in cfs and d in ft; C is about 130–140 for new cement-lined or plastic pipe.

  • AWWA C651: newly installed mains receive a 25 mg/L initial chlorine dose held 24 hours, leaving at least 10 mg/L residual, then are flushed and sampled for coliforms.

  • Backflow protection ranking: air gap is absolute protection, followed by reduced-pressure zone, double check, and vacuum breaker; RPZ devices are tested annually.

  • Water hammer surge is governed by closure time versus 2L/a; rapid closure produces the full Joukowsky surge Δp = ρ·a·ΔV and can rupture mains.

  • Storage tank turnover every 2–3 days limits nitrification and chlorine decay; low turnover plus warm water favors biofilm and nitrifying bacteria growth.

  • Leak detection uses acoustic correlation and minimum night flow analysis; a rising night flow with no customer demand indicates unreported leakage.

Quick reference

Wastewater Treatment

  • Primary clarifiers are designed at 600–800 gpd/ft² overflow rate with 1.5–2.5 hours detention and remove about 30% of BOD and 60% of suspended solids.

  • F/M = lb BOD applied per day ÷ lb MLVSS under aeration; conventional activated sludge runs 0.2–0.5 and extended aeration below 0.1.

  • MCRT = lb solids in the aeration system ÷ lb solids leaving daily; nitrification generally needs more than 10 days SRT at 20°C and longer in cold water.

  • Return activated sludge is typically 50–100% of influent flow; SVI of 80–150 mL/g indicates good settling and above 150 indicates bulking.

  • Nitrification consumes 7.14 mg alkalinity as CaCO3 and 4.57 mg O2 per mg NH3-N oxidized; denitrification recovers about 2.86 mg O2 per mg NO3-N.

  • Aeration basin dissolved oxygen is held at 1.5–2.5 mg/L; below 1 mg/L nitrification stalls and filamentous organisms gain a competitive advantage.

  • Anaerobic digestion runs mesophilic at 95–98°F with 20–30 day SRT and 40–50% volatile solids reduction; a volatile acid to alkalinity ratio above 0.3 signals souring.

  • Secondary clarifiers are sized at 400–800 gpd/ft² at average flow with solids loading kept below roughly 25 lb/day/ft².

  • Effluent disinfection is set by NPDES permit limits on fecal coliform; UV systems typically deliver about 30 mJ/cm² to secondary effluent.

Quick reference

Wastewater Collection

  • Gravity sewers are designed for at least 2 ft/s at design flow so solids stay suspended, and no more than 10–15 ft/s to limit abrasion and hydrogen sulfide release.

  • Manning's equation: V = (1.486/n) · R^(2/3) · S^(1/2), with R the hydraulic radius in feet and n about 0.013 for new concrete or plastic sewer pipe.

  • A common minimum slope for an 8-inch sewer is about 0.4% (0.004 ft/ft); always confirm the slope by Manning's equation at design flow.

  • Infiltration is groundwater entering through defects; inflow is stormwater from direct connections such as roof drains and manhole covers - both add clear flow to treatment.

  • Lift station wet wells are sized for pump cycle times of at least 5–10 minutes to protect motors, with force mains sized at 2–4 ft/s to keep solids moving.

  • Hydrogen sulfide attacks concrete above the waterline; control with prechlorination, nitrate addition, or covers and scrubbers at force main discharge points.

  • Smoke testing locates inflow sources, dye testing confirms illegal connections, and CCTV inspection identifies cracks, roots, and offset joints.

  • Manholes and wet wells are permit-required confined spaces; test for oxygen, LEL, H2S, and CO before entry and ventilate continuously.

Quick reference

Safety

  • Acceptable confined space entry atmosphere: oxygen 19.5–23.5%, LEL below 10%, hydrogen sulfide below 10 ppm, and carbon monoxide below 35 ppm.

  • Chlorine gas has an IDLH of 10 ppm and requires SCBA; a leaking cylinder forms a yellow-green cloud that hugs low ground.

  • Hydrogen sulfide has an IDLH of 100 ppm, and because it deadens the sense of smell at high concentrations, odor is never a safe warning.

  • Methane's explosive range is 5% to 15% in air; combustible gas meters read % LEL and entry is stopped at 10% LEL.

  • OSHA requires a protective system for trenches 5 ft or deeper, a ladder within 25 ft of lateral travel, and spoil piles set back at least 2 ft from the edge.

  • Lockout/tagout sequence: notify affected workers, shut down, isolate all energy sources, apply locks and tags, release stored energy, then verify zero energy.

  • Emergency eyewash and shower must be reachable within 10 seconds of travel from corrosive chemical handling areas, and flushing continues for 15 minutes.

  • A confined space attendant remains outside the space at all times with a retrieval system or trained rescue team standing by.

  • Fall protection is required at 4 ft in general industry and 6 ft in construction; test the atmosphere before entry and continuously during occupancy.

Quick reference

Regulations

  • Primary MCLs include nitrate 10 mg/L as N, nitrite 1 mg/L, and arsenic 0.010 mg/L; lead action level is 0.015 mg/L and copper 1.3 mg/L at the 90th percentile.

  • Stage 2 DBPR limits are computed as locational running annual averages: total trihalomethanes 80 µg/L and five haloacetic acids 60 µg/L.

  • Under the Total Coliform Rule and RTCR, E. coli is an MCL violation and any positive total coliform triggers repeat sampling and a system assessment.

  • The Surface Water Treatment Rule requires 99.9% (3-log) Giardia and 99.99% (4-log) virus inactivation, demonstrated with CT tables by disinfectant, pH, and temperature.

  • Public notification tiers: Tier 1 within 24 hours, Tier 2 within 30 days, Tier 3 within 90 days or in the annual consumer confidence report.

  • NPDES permits set effluent limits and monitoring; results are reported on monthly discharge monitoring reports that support compliance and enforcement decisions.

  • 40 CFR Part 503 governs biosolids, requiring pathogen reduction, vector attraction reduction, and limits on land application of metals.

  • Operator certification is administered by the state under EPA primacy, with grade levels tied to system complexity and renewal through continuing education units.

  • Clean Water Act pretreatment programs apply categorical standards plus local limits to industrial users and require slug control and periodic inspection.

Quick reference

Laboratory Analysis

  • BOD5 is run at 20°C in the dark for 5 days with seeded dilution water; nitrification is inhibited, and depletion should be at least 2 mg/L with at least 1 mg/L residual remaining.

  • COD uses dichromate digestion for 2 hours at 150°C; COD exceeds BOD5 because it also oxidizes non-biodegradable and reduced inorganic matter.

  • TSS: filter through a glass fiber filter, dry at 103–105°C, and weigh; mg/L = (mg residue × 1000) ÷ mL of sample filtered.

  • pH meters are calibrated with two buffers bracketing the sample (commonly 4, 7, 10), with electrode slope accepted at 95–105% of theoretical.

  • Turbidity is measured nephelometrically against formazin primary standards and reported in NTU; samples are kept out of light and analyzed promptly.

  • Chlorine residual is measured by DPD colorimetry; amperometric titration is used when color, turbidity, or manganese interfere with the colorimetric reading.

  • Coliform analysis uses membrane filtration or enzyme substrate methods; drinking water samples are held at 4°C and analyzed within 8 hours of collection.

  • Typical holding times: BOD 48 hours, TSS 7 days, COD 28 days, nitrate 48 hours, and chlorine residual measured immediately in the field.

  • QA/QC for each batch includes a method blank, duplicate, matrix spike, and calibration verification, with recovery typically accepted within ±15%.