GAQM CPD flashcards
GAQM CPD · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Triple constraint
- The interdependent limits of scope, time, and cost. Adjusting any one forces a compensating change in at least one other, while quality and risk act as balancing factors.
- Critical path
- The longest total duration path through the project network. It determines the shortest possible project completion time and normally carries zero total float.
- Total float
- The amount of time an activity can be delayed without delaying the project finish date. Calculated as late start minus early start, or late finish minus early finish.
- Free float
- Time an activity can slip without delaying the early start of any successor. It equals successor early start minus this activity's early finish and never exceeds total float.
- PERT expected duration
- A weighted three-point estimate using optimistic, most likely, and pessimistic values: expected duration equals (O + 4M + P) divided by six.
- Cost variance
- Earned value minus actual cost. A positive result means the project is spending less than the value earned; a negative result indicates a cost overrun.
- Schedule performance index
- Earned value divided by planned value. A value below one means less work has been completed than planned at that point in the schedule.
- Cost performance index
- Earned value divided by actual cost. A value below one means the project is receiving less value per unit of money spent than planned.
- Estimate at completion
- Forecast total project cost. If current cost performance continues, it equals budget at completion divided by the cost performance index.
- To-complete performance index
- The efficiency needed on remaining work to hit a stated budget. Above one means remaining work must be performed more efficiently than so far.
- Contingency reserve
- Budget held for accepted, identified risks. It is included in the cost baseline and released as those specific risk events pass or are resolved.
- Management reserve
- Budget for unidentified scope and unplanned work. It sits above the cost baseline and normally requires sponsor or senior management approval before use.
- Firm-fixed-price contract
- A contract with a fixed total price for defined scope. The seller bears most cost risk, so it suits well-understood requirements and stable specifications.
- Cost-reimbursable contract
- The buyer pays allowable actual costs plus a fee, bearing most cost risk. It suits evolving scope where requirements cannot be priced up front.
- Time and materials contract
- The buyer pays per hour or unit plus materials, often with a not-to-exceed cap. Risk is shared and scope must be tightly controlled.
- Risk mitigation
- A threat response that reduces the probability or impact of a risk event before it occurs, for example by prototyping or adding redundancy.
- Risk transfer
- A threat response shifting ownership of a risk to a third party, such as insurance, warranties, or fixed-price contracting. The risk itself still exists.
- Opportunity exploitation
- A response for positive risks that seeks to ensure the opportunity is realized, for example assigning the most capable resources to finish early.
- Project charter
- A document formally authorizing the project and giving the project manager authority to apply organizational resources to project activities.
- Scope baseline
- The approved scope statement, work breakdown structure, and WBS dictionary. Any change to these components requires formal change control.
- Work package
- The lowest level of the work breakdown structure, where cost and duration can be reliably estimated, scheduled, monitored, and controlled.
- Validate Scope
- The process of formalizing acceptance of completed deliverables with the customer. It focuses on acceptance, whereas Control Quality focuses on correctness.
- Change control board
- A group with authority to review, approve, reject, or defer change requests. Its decisions are recorded in the change log and reflected in baselines.
- Pareto chart
- A histogram ordered by frequency showing that a small number of causes produce most defects. It directs quality effort to the highest-impact causes first.
- Control chart
- A run chart with upper and lower control limits showing process stability over time. Points outside limits or nonrandom patterns signal special-cause variation.
- Tuckman ladder
- The team development sequence of forming, storming, norming, performing, and adjourning. Storming typically produces the most conflict over roles and authority.
- Communications channels
- The number of possible communication paths among stakeholders, calculated as n times (n minus one) divided by two, where n is the stakeholder count.
- Lessons learned register
- A repository of knowledge gained during the project, updated throughout rather than only at closure, and used to improve current and future work.
- Rolling wave planning
- Progressive elaboration in which near-term work is planned in detail while distant work is planned at a higher level until more information is available.
- Resource leveling
- A scheduling technique that adjusts start and finish dates to resolve resource over-allocation. It may extend the critical path and change the project finish date.
- Fast tracking
- Schedule compression by overlapping activities that would normally run sequentially. It increases risk and rework and works best where activities can genuinely overlap.
- Closing process group
- The process group that obtains final acceptance, archives project records, releases team and resources, and confirms all contractual obligations are complete.