ARC PPE study plan
ARC PPE · Give each week a clear focus.
8 weeks · About 7 hours per week
Practice Management & Project Management
Map every Practice Management and Project Management content area to a one-page outline you write yourself, ranking subtopics by your confidence from 1 to 5.
Draft a two-column comparison of common project delivery methods (design-bid-build, design-build, CM at-risk, IPD) covering risk allocation, cost certainty, and schedule compression.
Calculate fee structures from scratch: given a project construction cost and a percentage fee, derive hourly billing rates that recover a target profit and overhead.
List the contractual documents in a standard owner-architect agreement and note which terms most often create scope disputes.
Your checkpoint
A 4-page handwritten or typed synthesis sheet pairing each delivery method with its fee structure and the three biggest liability risks, plus a self-scored confidence table for all 20 subtopics.
Project Management & Practice Management
Build a critical-path schedule for a small hypothetical project by hand, identifying the critical path, total float, and the effect of a 5-day delay on a non-critical activity.
Write out the steps for processing a change order from request through pricing, approval, and documentation, and identify who signs at each step.
Compare quality-control and quality-assurance workflows in a construction-phase services scope and note where each sits in the schedule.
Draft a risk register with ten risks, each with a likelihood, impact, and mitigation owner.
Your checkpoint
A completed CPM network diagram with forward and backward pass values and a one-page change-order procedure flowchart.
Project Development and Documentation & Programming and Analysis
Assemble a drawing set index for a mid-size commercial project and label each sheet by phase, discipline, and purpose.
Trace the programming process from client interview through area tabulation, and compute net-to-gross ratios for three building types.
Write the coordination checklist you would use to confirm structural, mechanical, and architectural drawings agree at a given milestone.
Explain how building information modeling workflows change the division of responsibility between architect and consultant.
Your checkpoint
A full drawing set index plus a worked area-tabulation spreadsheet showing net assignable area, gross area, and efficiency ratio for one building type.
Project Development and Documentation & Project Planning and Design
Compare three schematic design options for the same program against budget, code, and site constraints, and defend the selection in writing.
Identify the code occupancy classification and construction type for two sample buildings and note the egress implications of each.
Write a sustainability goal statement that ties a rating-system target to specific design decisions and cost implications.
Draft a design review agenda that surfaces owner decisions early enough to avoid redesign.
Your checkpoint
A design decision matrix scoring three schematic options across at least six weighted criteria, with a written recommendation and a milestone check of your practice-exam accuracy so far.
Site Planning and Design & Building Systems and Technology
Evaluate a hypothetical site for zoning setbacks, floor-area ratio, and impervious coverage, and compute the maximum buildable envelope.
Sketch site drainage and grading concepts and explain how slope, soils, and stormwater retention drive layout.
Compare structural systems (steel frame, cast-in-place concrete, mass timber) on span, cost, and coordination impact.
Explain how mechanical, electrical, and plumbing system selection constrains ceiling height, shaft size, and structural bay spacing.
Your checkpoint
A site plan sketch with computed buildable envelope and a one-page systems comparison table linking structural and MEP choices to architectural consequences.
Construction and Evaluation & Building Systems and Technology
Sequence the construction administration tasks that occur from award through substantial completion and place each on a timeline.
Write the procedure for reviewing a submittal, a shop drawing, and a request for information, and state the architect's authority in each.
Describe how commissioning and systems testing are documented at closeout.
Draft a punch list process and explain the difference between substantial and final completion.
Your checkpoint
A construction administration timeline covering award to final completion with every architect action, deliverable, and approval authority annotated.
Professional Practice and Ethics & Practice Management
Work through five ethics scenarios covering conflicts of interest, undisclosed compensation, and competence limits, and write the defensible response to each.
Summarize the architect's standard of care and distinguish it from a warranty of results.
Explain licensure, firm registration, and continuing-education obligations as they affect practice decisions.
Review your earlier confidence table and re-rank every subtopic.
Your checkpoint
A five-scenario ethics response log with cited reasoning principles and an updated confidence table showing movement from week 1.
Programming and Analysis & Project Planning and Design & Project Development and Documentation & Construction and Evaluation & Site Planning and Design & Building Systems and Technology
Complete two full timed practice exams under test conditions and log every missed item by domain.
Re-teach your ten weakest subtopics from scratch without notes, then check your accuracy.
Drill the calculations you got wrong: fee math, area tabulation, FAR, and float.
Write a one-page test-day strategy covering pacing, flagging, and how you handle unfamiliar content.
Your checkpoint
A scored practice-exam log with per-domain accuracy, a rewritten one-page summary for each of your ten weakest subtopics, and a final readiness rating.
Milestones
Week 2: You can build a CPM diagram from scratch and explain float without notes, and you can state the risk allocation of all four delivery methods.
Week 4: Practice-exam accuracy on Practice Management, Project Management, and Programming and Analysis subtopics is at or above 60 percent.
Week 6: You can sequence construction administration from award to closeout and name the architect's authority at each review step.
Week 8: Overall timed practice-exam accuracy is at or above 70 percent with no domain below 60 percent.