Kwun Tong's 1972 Shing Yip Industrial Building is scheduled for lease renewal in 18 months. The owner has offered the vacant first three floors to a charitable consortium at a below-market rent of HK$180,000 a month, but only if the consortium commits to a single use for five years. Three proposals are on the table: a 120-bed youth hostel for low-income students, a community arts hub with 14 studios, or 45 transitional housing units for families awaiting public rental. The building's fire systems need HK$6 million of upgrading whichever option is chosen. Nearby residents complain about noise from late-night arts events; the district council wants visible poverty relief; youth groups say hostel places would reduce cross-border study costs; and the fire services department will not approve temporary housing above the second floor without a second staircase. The consortium has one meeting to shortlist one option.

1. Identify the two most important criteria the consortium should use to compare the three proposals, and explain why each criterion creates a trade-off with the other.

Read the worked answer

Two criteria are (a) depth of poverty relief per public dollar and (b) speed and safety of delivery. They trade off because the option with the largest headline benefit - 45 transitional homes - is also the one most exposed to the fire-code constraint: temporary housing above the second floor needs a second staircase, so the usable unit count may fall or the works may be delayed. The 120-bed hostel avoids that specific ban but still needs HK$6 million of fire upgrading and may produce less family-sized support. The arts hub is probably the quickest and least safety-critical, but 14 studios produce weaker and less measurable poverty relief. A simple bed count therefore favours the hostel or housing, while a feasibility test may favour the arts hub. The consortium should not treat the three proposals as equally ready; it must compare benefit, risk, and the five-year lease commitment together.

2. Recommend one option and justify it using at least two stakeholders and one constraint.

Read the worked answer

Recommendation: shortlist the youth hostel, conditional on a funded fire upgrade and a noise-management plan. It serves 120 low-income students, which is a larger direct beneficiary group than the 45 transitional units and is more clearly linked to poverty relief than 14 arts studios. It also responds to the youth groups' concern about study costs, and a five-year commitment gives the operator time to recover set-up costs. The district council's demand for visible poverty relief is met better than by the arts hub. However, the hostel is not automatically safe: the consortium must obtain the Fire Services Department's approval before signing, budget the HK$6 million upgrade inside the lease, and agree a night-time noise protocol with nearby residents so that late returns do not create a new complaint channel. Transitional housing should not be dismissed; it should be kept as the fallback if the second-staircase cost makes the 45 units unviable. This is a judgement under constraints, not a claim that hostels are always better than housing.

3. Explain one condition the consortium should attach to its recommendation and how it would reduce a risk.

Read the worked answer

One condition is a staged occupancy permit tied to completion of the fire upgrade. The consortium should not receive the full 120-bed licence until the new staircase, alarm system, and evacuation drill have been certified. This reduces the risk that the five-year lease is signed on a promise of safety but occupied before works are finished. Operationally, the consortium could open only the lower floors first, with a cap of 40 beds, and increase numbers after inspection. A second condition is a community liaison group with residents, the operator, and the district council, meeting monthly for the first year, to handle noise and queueing complaints. These conditions do not remove the trade-off between speed and safety, but they make the risk visible and assign responsibility. If either condition fails, the consortium should switch to the arts hub rather than occupy an uncertified building.