HKIA/ARB PA Paper 3 key terms
HKIA/ARB PA Paper 3 · Get comfortable with the vocabulary.
- Authorized Person (AP)
- Related: Registered Structural Engineer (RSE), Buildings Ordinance (BO), Supervision Plan
A person registered under the Buildings Ordinance to prepare and submit building plans and supervise building works on behalf of a client. Registration requires prescribed qualifications and experience, and the AP carries statutory duties for compliance.
- Registered Structural Engineer (RSE)
- Related: Authorized Person (AP), Buildings Ordinance (BO), Structural Plan Submission
An engineer registered under the Buildings Ordinance to design and certify structural elements of building works. The RSE submits structural plans, calculations and supervision reports, and shares statutory responsibility with the AP for structural safety.
- Registered Specialist Contractor (RSC)
- Related: Registered General Building Contractor (RGBC), Buildings Ordinance (BO), Site Supervision
A contractor registered under the Buildings Ordinance for a specific category of specialized works, such as foundation, demolition, site formation or ground investigation. Only a registered specialist in the relevant category may carry out those works.
- Registered General Building Contractor (RGBC)
- Related: Registered Specialist Contractor (RSC), Supervision Plan, Buildings Ordinance (BO)
A contractor registered under the Buildings Ordinance to carry out general building works and to be appointed for building projects. The RGBC must be engaged for works requiring notification and is subject to site supervision requirements.
- Buildings Ordinance (BO)
- Related: Authorized Person (AP), Occupation Permit (OP), Buildings Department (BD)
The principal Hong Kong legislation controlling the design, construction, alteration and demolition of buildings. It sets out plan submission, approval, consent, supervision, occupation and enforcement requirements, supported by subsidiary regulations.
- Buildings Department (BD)
- Related: Buildings Ordinance (BO), Occupation Permit (OP), Unauthorized Building Works (UBW)
The government department that administers the Buildings Ordinance, processes plan approvals and consents, inspects sites, and enforces against unauthorized building works and dangerous buildings. It is the approving authority for most building submissions.
- Occupation Permit (OP)
- Related: Temporary Occupation Permit (TOP), Buildings Department (BD), Certificate of Completion
Approval issued by the Building Authority allowing a completed building or part to be occupied. It is granted after satisfactory inspection and confirmation that required works, drainage and safety provisions comply with approved plans.
- Temporary Occupation Permit (TOP)
- Related: Occupation Permit (OP), Buildings Department (BD)
A permit allowing partial or conditional occupation of a building before the full Occupation Permit is issued. It is granted when the Building Authority is satisfied that the relevant part is safe to occupy, subject to stated conditions.
- Unauthorized Building Works (UBW)
- Related: Buildings Department (BD), Buildings Ordinance (BO)
Building works carried out without the required approval or consent, or contrary to approved plans. UBWs include illegal rooftop structures and unauthorized alterations, and are subject to removal or rectification orders enforced by the Building Authority.
- Lease Conditions
- Related: Plot Ratio, Site Coverage, Outline Zoning Plan (OZP)
Conditions in a government land lease that govern the use, development, height, plot ratio and other restrictions on a site. Compliance is separate from Buildings Ordinance approval, and breaches may require modification or waiver.
- Outline Zoning Plan (OZP)
- Related: Town Planning Board (TPB), Lease Conditions, Planning Permission
A statutory town plan showing permitted land uses and development restrictions for an area. It indicates zones, uses always permitted, and uses requiring planning permission from the Town Planning Board.
- Town Planning Board (TPB)
- Related: Outline Zoning Plan (OZP), Planning Permission
The statutory body that prepares and oversees outline zoning plans and decides applications for planning permission and reviews. Its decisions affect whether a proposed development use is permissible on a site.
- Plot Ratio
- Related: Site Coverage, Gross Floor Area (GFA), Lease Conditions
The ratio of total gross floor area of a building to the area of the site on which it stands. It is a principal development control limiting building bulk, set by lease conditions, zoning plans or practice notes.
- Site Coverage
- Related: Plot Ratio, Gross Floor Area (GFA)
The proportion of a site area covered by the building footprint at a specified level. It controls the extent of built-over area and is used with plot ratio to regulate massing, daylight and open space.
- Gross Floor Area (GFA)
- Related: Plot Ratio, Site Coverage, Lease Conditions
The total floor area of a building measured to defined rules, including all floors but excluding certain exempted areas. GFA is the basis for plot ratio calculations and for determining permissible development intensity.
- Planning Permission
- Related: Town Planning Board (TPB), Outline Zoning Plan (OZP)
Consent from the Town Planning Board to carry out development or a use that is not always permitted under the relevant outline zoning plan. It must be obtained before the use or development proceeds.
- Means of Escape
- Related: Fire Resistance Rating (FRR), Code of Practice for Fire Safety
The continuous route from any point in a building to a place of safety, comprising exit routes, protected corridors, staircases and final exits. Design requirements address travel distance, exit width and protection from fire.
- Fire Resistance Rating (FRR)
- Related: Means of Escape, Compartmentation, Code of Practice for Fire Safety
A measure of how long a building element resists fire, expressed in minutes and based on stability, integrity and insulation criteria. Required ratings depend on element type, building use and compartmentation strategy.
- Compartmentation
- Related: Fire Resistance Rating (FRR), Means of Escape
Division of a building into fire compartments by fire-resisting walls, floors and doors to limit fire and smoke spread. It protects escape routes, limits fire size and provides time for evacuation and firefighting.
- Code of Practice for Fire Safety
- Related: Means of Escape, Fire Resistance Rating (FRR)
A set of codes issued by the Buildings Department covering means of escape, fire resistance, means of access and firefighting installations. They provide deemed-to-comply standards for fire safety design of buildings.
- Universal Accessibility
- Related: Barrier-Free Access, Design Manual: Barrier Free Access
Design approach ensuring buildings and facilities can be used by people with disabilities and others with varied needs. It covers accessible routes, ramps, lifts, toilets and signage, supported by design manuals and regulations.
- Barrier-Free Access
- Related: Universal Accessibility, Design Manual: Barrier Free Access
Provision of routes and facilities without steps or obstructions so that people with mobility impairments can reach and use a building. Requirements include gradients, widths, handrails, tactile guidance and accessible lift provision.
- Design Manual: Barrier Free Access
- Related: Barrier-Free Access, Universal Accessibility
A Buildings Department publication setting out detailed requirements for accessible building design, including dimensions for ramps, entrances, corridors, sanitary fittings and lifts. It is a key reference for compliance and for plan checking.
- Sustainable Building Design
- Related: BEAM Plus, Building Energy Code
Design that reduces environmental impact through energy efficiency, passive design, renewable energy, waste reduction and healthy indoor environments. In Hong Kong it is encouraged through green building assessment and practice guidelines.
- BEAM Plus
- Related: Sustainable Building Design, Building Energy Code
A voluntary green building assessment scheme used in Hong Kong, rating buildings on aspects such as site, energy, water, materials and indoor environment. Certification is often used to demonstrate sustainability performance.
- Building Energy Code
- Related: Sustainable Building Design, BEAM Plus
A code setting minimum energy efficiency requirements for building services installations and building envelope design. Compliance is demonstrated through prescribed methods, calculations and declarations submitted with building plans.
- Supervision Plan
- Related: Site Supervision, Authorized Person (AP), Registered Structural Engineer (RSE)
A plan prepared by the AP and RSE setting out the supervision and inspection arrangements for building works, including personnel, frequency and stages of inspection. It must be submitted and followed during construction.
- Site Supervision
- Related: Supervision Plan, Registered General Building Contractor (RGBC)
The ongoing inspection and monitoring of construction by qualified personnel to ensure works comply with approved plans, the Buildings Ordinance and good practice. Records of inspections and tests form part of statutory reporting.
- Form of Contract
- Related: Conditions of Contract, Bills of Quantities
The standard or bespoke document that sets out the parties, scope, price, time, risk allocation and dispute provisions for a construction project. Selection of an appropriate form shapes administration and liabilities.
- Conditions of Contract
- Related: Form of Contract, Extension of Time (EOT), Variation Order
The clauses governing rights and obligations under a construction contract, including payment, variations, extensions of time, defects and dispute resolution. They allocate risk between employer and contractor.
- Bills of Quantities
- Related: Form of Contract, Variation Order
A priced document listing measured quantities of work items, used for tendering and valuation. It provides a common basis for pricing, interim payments and valuation of variations.
- Variation Order
- Related: Conditions of Contract, Bills of Quantities
A written instruction issued under the contract to change the works, such as altering design, quantity or quality. It must follow contractual procedures and is valued for payment, often using rates in the priced documents.
- Extension of Time (EOT)
- Related: Conditions of Contract, Liquidated Damages
An adjustment to the contractual completion date granted for qualifying delay events beyond the contractor's control. An EOT relieves liability for liquidated damages for the period of excusable delay.
- Liquidated Damages
- Related: Extension of Time (EOT), Conditions of Contract
A pre-agreed sum payable by the contractor for each day of delay beyond the completion date, representing the employer's estimated loss. The amount must be a genuine pre-estimate to be enforceable.
- Interim Payment
- Related: Retention Money, Bills of Quantities
A periodic payment made during construction for work done and materials, based on measured valuations. It is subject to certification and contractual time limits, with retention often deducted.
- Retention Money
- Related: Interim Payment, Defects Liability Period
A percentage of each payment withheld by the employer as security for performance and defect rectification. It is released in stages, typically on practical completion and at the end of the defects liability period.
- Defects Liability Period
- Related: Retention Money, Practical Completion
A period after completion during which the contractor must rectify defects notified by the employer. It defines the scope of the contractor's maintenance obligation and the timing of final retention release.
- Practical Completion
- Related: Defects Liability Period, Retention Money
The stage at which the works are complete to a standard fit for their intended use, subject only to minor defects. It triggers possession, release of part of retention and the start of the defects liability period.