HKIA/ARB PA Paper 5 flashcards
HKIA/ARB PA Paper 5 · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Building Authority
- The Director of Buildings under the Buildings Ordinance (Cap 123); approves building plans, issues consents, and may make closure or demolition orders for unauthorised works.
- Section 24 order
- A removal or alteration order served by the Building Authority on the owner of an unauthorised building work; it takes effect on service and non-compliance is an offence.
- Minor works designation
- Under Cap 123N, designated minor works follow simplified requirements; Schedule 1 works need notification before commencement rather than full plan approval.
- Limitation period
- Six years for simple contract and tort claims, twelve years for deeds, under the Limitation Ordinance (Cap 347); time runs from the cause of action.
- Negligence elements
- Duty of care, breach measured against a reasonably competent architect, causation of the loss, and recoverable damage; all four must be established.
- Fire Safety Code 2011
- The Code of Practice for Fire Safety in Buildings 2011 addresses means of escape, fire-resisting construction, and means of access for firefighting and rescue.
- Authorised person
- A person appointed by the Building Authority under s.3 of the Buildings Ordinance to supervise building works and certify compliance on the Authority's behalf.
- Occupation approval
- The Building Authority's approval permitting occupation of a new building; it follows notice of completion and precedes lawful occupation under the Buildings Ordinance.
- Architects Registration Ordinance
- Cap 408 establishes the Architects Registration Board, the register of architects, and the restriction on using the title 'architect' without registration.
- Professional misconduct
- A breach of the professional code or standards that the Architects Registration Board may investigate, with sanctions including reprimand, conditions, suspension or removal.
- Plan refusal appeal
- Under s.16 of the Buildings Ordinance, a person aggrieved by a refusal of plans may appeal to the Appeal Tribunal within the period prescribed.
- Form BA14
- The notice of commencement of building works given to the Building Authority; works must not start before the notice and any required consent are in place.
- Conflict of interest
- A personal or financial interest that could bias professional judgement; the architect must disclose it and, where necessary, decline the engagement.
- PDPO access request
- Under Cap 486, a data subject may request access to personal data; the data user must comply within 40 days, subject to statutory exemptions.
- HKIA Conditions of Engagement
- The professional institute's standard terms for architect appointments, covering scope, fees, and the division of responsibilities between client and architect.
- Competence limit
- A professional obligation not to accept work outside the architect's field of expertise without obtaining specialist advice or associating a qualified specialist.
- Lump-sum contract
- A contract where the contractor agrees a fixed price for defined works; the employer bears design risk and the contractor bears construction risk.
- Design-and-build
- A procurement route where one contractor is responsible for both design and construction, bearing design risk for the works it designs.
- Extension of time
- An award of additional time for completion where a relevant event delays the works; it protects the contractor from liquidated damages for that period.
- Liquidated damages
- A pre-agreed sum payable for delay; it must be a genuine pre-estimate of loss, otherwise it is an unenforceable penalty.
- Variation valuation
- Valued first at contract rates, then at rates derived from them, then by fair valuation; the instruction should precede the work unless urgency applies.
- Interim certificate
- The architect's periodic certification of work done and sums due; it must be issued within the contract period and supports progress payment.
- Practical completion
- The stage when the works are complete except for minor defects; it starts the defects liability period and releases part of the retention.
- Security of payment
- The Construction Industry Council regime requiring a payment response within the contract period and providing adjudication where the response is unpaid.
- Novation
- The replacement of one party to a contract by another with consent of all parties; common when the employer's architect transfers to a design-and-build contractor.
- OTTV
- Overall thermal transfer value: a measure of heat gain through the building envelope, capped for prescribed buildings under the Building (Energy Efficiency) Regulation.
- BEAM Plus
- A Hong Kong green building assessment covering site aspects, energy, water, materials, indoor environmental quality and innovations, with a provisional design-stage rating.
- Fire resistance period
- The period in minutes for which an element resists fire, determined by element type, building height and use; distinct from a tested assembly's rating.
- Concrete grade
- Specified by cube strength at 28 days; the grade, cover and exposure class must be consistent with the Code of Practice for Structural Use of Concrete.
- Curtain wall testing
- Performance tests for air permeability, watertightness and wind resistance; design wind pressure is taken from the Code of Practice on Wind Effects.
- Sustainable Building Design Guidelines
- Practice notes APP-151 and APP-152 set requirements on building separation, setback, site coverage and greenery, with gross floor area concessions for compliance.