HKIE Professional Assessment - Control, Automation & Instrumentation Discipline study materials
HKIE Professional Assessment - Control, Automation & Instrumentation Discipline study resources

HKIE Professional Assessment - Control, Automation & Instrumentation Discipline cheat sheet

HKIE Professional Assessment - Control, Automation & Instrumentation Discipline · Keep the key ideas within reach.

Quick reference

Control Systems Theory and Design

  • PID equation (ideal/parallel): u(t) = Kp e(t) + Ki ∫e dt + Kd de/dt, with Ki = Kp/Ti and Kd = Kp·Td; Laplace form C(s) = Kp(1 + 1/(Ti s) + Td s).

  • Closed-loop transfer function for negative feedback: T(s) = G(s)H(s)/(1 + G(s)H(s)); characteristic equation 1 + G(s)H(s) = 0 determines stability.

  • Routh-Hurwitz criterion: necessary condition all coefficients of characteristic polynomial positive; sufficient condition first column of Routh array has no sign changes.

  • Bode stability margins: gain margin = −20 log|G(jωpc)| where phase = −180°; phase margin = 180° + ∠G(jωgc) where |G(jωgc)| = 1 (0 dB).

  • Ziegler-Nichols ultimate gain method: with P-only control at ultimate gain Ku and period Pu, PID settings Kp = 0.6Ku, Ti = 0.5Pu, Td = 0.125Pu.

  • Second-order step response: percent overshoot ≈ 100·exp(−ζπ/√(1−ζ²)); settling time (2% band) ≈ 4/(ζωn).

  • Final value theorem: steady-state error e_ss = lim_{s→0} s·E(s) for a stable closed loop; type 0 gives finite error to step, type 1 to ramp, type 2 to parabola.

  • For a first-order plus dead time process G(s) = K e^{−θs}/(τs+1), the θ/τ ratio > 1 indicates dead-time-dominant dynamics where PID tuning is difficult and model-based control (Smith predictor) may be needed.

  • Anti-windup is required whenever integral action is present and the actuator can saturate; common methods are back-calculation and conditional integration (integrator clamping).

Quick reference

Process Instrumentation and Measurement

  • 4–20 mA current loop: 4 mA represents live zero (0%), 20 mA represents 100%; current signalling is preferred over voltage because loop current is independent of cable resistance within compliance limits.

  • Maximum loop resistance R_max = (Vsupply − Vmin_transmitter)/0.020 A; for a 24 V supply and 12 V minimum transmitter voltage, R_max = 600 Ω.

  • RTD (Pt100) resistance: R(T) ≈ R0(1 + αT) with α ≈ 0.00385 /°C; at 100 °C R ≈ 138.5 Ω. Three-wire or four-wire connections compensate lead resistance.

  • Thermocouple Seebeck effect: voltage depends on the temperature difference between measuring and reference junctions; cold-junction compensation is mandatory.

  • Orifice plate flow: Q ∝ √(ΔP); square-root extraction is needed to linearise the signal before control or totalisation.

  • Differential pressure level measurement: ΔP = ρgh; for closed tanks, the low-pressure leg must be filled and the transmitter zero elevated or suppressed to compensate the wet leg.

  • Accuracy, repeatability, hysteresis, and drift are distinct specifications; total probable error is often taken as the root-sum-square of independent contributions.

  • Intrinsic safety: energy-limiting barriers or galvanic isolators limit voltage and current so that no spark or thermal effect can ignite the hazardous atmosphere; entity parameters (Uo, Io, Co, Lo) must match the hazardous-area device.

Quick reference

Industrial Automation

  • PLC scan cycle: read inputs → execute program → update outputs → housekeeping/communications; worst-case response time is at least one full scan plus input filter delay.

  • Ladder logic contacts in series implement AND, contacts in parallel implement OR, and normally-closed contacts implement NOT; seal-in (latching) circuits use a parallel contact around a start pushbutton.

  • Safety-related outputs must not rely on standard PLC logic alone; safety functions belong in a safety PLC or hardwired safety relay with diagnostics.

  • PID function blocks in PLCs require bumpless transfer between manual and automatic, output limiting, and anti-windup; cycle time must be shorter than the process dominant time constant.

  • Sequential control is best expressed as a state machine (SFC/grafcet); each step has actions and transition conditions, and the sequence must define safe states on fault.

  • Industrial Ethernet (PROFINET, EtherNet/IP) is non-deterministic by nature; use managed switches, VLANs, and prioritisation (QoS) for control traffic.

  • Redundancy: hot standby requires bumpless switchover; redundant controllers, power supplies, and networks must be tested for switchover time against the process tolerance.

Quick reference

PLC/SCADA and DCS

  • SCADA architecture: field devices → RTUs/PLCs → communication network → SCADA server (historian, alarms) → HMI clients; DCS integrates control and HMI in a proprietary, engineered system.

  • Alarm management per ISA-18.2: alarms must be actionable, prioritised, and rationalised; target fewer than ~6 alarms per operator per hour in steady state and less than 150 alarms per day.

  • OPC UA provides secure, platform-independent data exchange with built-in authentication and encryption; classic OPC DA relies on DCOM and is a security risk.

  • Historian data compression (swinging-door or exception reporting) reduces storage; verify that the deadband does not hide important process excursions.

  • DCS redundancy typically includes redundant controllers, I/O buses, and power; SCADA redundancy is often server-level with hot standby and mirrored historians.

  • Time synchronisation (NTP/IEEE 1588 PTP) is essential for sequence-of-events recording; without it, alarm and trip timestamps across devices cannot be correlated.

Quick reference

Safety Instrumented Systems and Functional Safety

  • IEC 61508 defines functional safety lifecycle and SIL 1–4; IEC 61511 applies it to the process industry. SIL is a measure of risk reduction, not of equipment quality.

  • PFDavg targets: SIL 1 = 10⁻¹ to 10⁻², SIL 2 = 10⁻² to 10⁻³, SIL 3 = 10⁻³ to 10⁻⁴, SIL 4 = 10⁻⁴ to 10⁻⁵ (low-demand mode).

  • Architectural constraints: HFT and SFF determine the maximum SIL for a subsystem; a simplex (1oo1) element with low diagnostic coverage is generally limited to SIL 2.

  • Proof test interval T: PFDavg ≈ λDU·T/2 for a 1oo1 element; doubling the proof-test interval roughly doubles the average probability of failure on demand.

  • Safety function components: sensor, logic solver, and final element; the final element often dominates the unreliability, so valve partial-stroke testing is valuable.

  • Common-cause failure must be addressed with diversity, physical separation, and a beta factor in reliability modelling; redundant identical devices are not fully independent.

  • SIS independence: the safety function must be independent of the basic process control system; shared sensors or shared final elements require justification and risk assessment.

Quick reference

Fieldbus, Industrial Networks and Cybersecurity

  • Fieldbus comparison: PROFIBUS DP (RS-485, up to 12 Mbit/s, 32 nodes per segment without repeater), Foundation Fieldbus H1 (31.25 kbit/s, power and data on the same pair), HART (4–20 mA with FSK digital signal superimposed).

  • PROFIBUS DP segment rules: max 32 devices per segment, 120 Ω termination at both physical ends, repeaters for longer distance; max 1200 m at 93.75 kbit/s.

  • HART: digital signal ±0.5 mA FSK at 1200 baud; allows multidrop (current fixed at 4 mA) but then no analogue control signal.

  • Cybersecurity defence in depth: network segmentation (zones and conduits per IEC 62443), firewalls between IT and OT, DMZ for historians and remote access, no direct internet exposure of PLCs.

  • IEC 62443 roles: asset owner, system integrator, product supplier; security levels SL 1–4 describe protection against increasingly capable attackers.

  • Patch management in OT is constrained by availability; compensating controls include virtual patching, application allow-listing, and strict change control.

  • WirelessHART and ISA100.11a use mesh topologies with time-synchronised channel hopping; battery life and update rate must be engineered.

Quick reference

Control Valves, Actuators and Final Elements

  • Valve flow coefficient: Cv = Q √(SG/ΔP) with Q in US gpm and ΔP in psi; Kv (metric) = 0.865 Cv.

  • Inherent characteristic: linear, equal percentage, and quick opening; equal percentage is preferred for most process control because it gives approximately linear installed characteristic.

  • Rangeability is the ratio of maximum to minimum controllable flow; typical globe valve rangeability is 30:1 to 50:1.

  • Fail-safe action: spring-return actuators fail closed (air-to-open) or fail open (air-to-close); the choice is a safety decision, not a control preference.

  • Cavitation occurs when vena contracta pressure falls below vapour pressure; flashing is when downstream pressure remains below vapour pressure. Both cause damage and noise.

  • Valve sizing must consider choked flow: for gas, check that pressure drop does not exceed the choked limit (ΔP > 0.5·P1 for air/gas); use the appropriate ISA/IEC sizing equations.

  • Positioner improves positioning accuracy and speed of response; a smart positioner provides diagnostics such as friction, deadband, and travel deviation.

Quick reference

Building Automation and Environmental Control

  • BACnet is the dominant building automation protocol; objects and services model devices; MS/TP is RS-485 at 9.6–76.8 kbit/s, BACnet/IP runs over Ethernet.

  • AHU control: supply air temperature control via cooling/heating coil valves, static pressure control via supply fan VFD, and economiser free cooling when outdoor air enthalpy is suitable.

  • Chiller sequencing and staging: lead/lag rotation, minimum run times, and demand limiting; condenser water temperature reset improves chiller efficiency.

  • VAV terminal control: airflow measured by differential pressure across an inlet probe; minimum and maximum airflow setpoints must respect ventilation requirements.

  • Indoor air quality: CO₂ demand-controlled ventilation typically targets 800–1000 ppm; ASHRAE Standard 62.1 gives ventilation rates per person and per floor area.

  • Fire and smoke control: stairwell pressurisation, smoke exhaust, and damper control must interface with the fire alarm system and be tested under a documented cause-and-effect matrix.

  • Energy metering and sub-metering: tenant billing, M&V per IPMVP, and trend logging of kWh, kW, and run hours support energy performance contracts.

Quick reference

Project Engineering

  • Project phases: feasibility → basic engineering (FEED) → detailed engineering → procurement → construction → commissioning → handover; each phase has defined deliverables and gate reviews.

  • Instrument index, I/O list, loop diagrams, cable schedules, termination diagrams, and cause-and-effect matrices are core deliverables; the C&E matrix is the basis for SIS testing.

  • Factory acceptance test (FAT) verifies the system against specification before shipment; site acceptance test (SAT) verifies installed performance and interfaces.

  • Loop checking confirms continuity, polarity, calibration, and correct signal scaling from field device to control system; it is documented per loop.

  • Commissioning sequence: mechanical completion → punch list → cold commissioning (water/air) → hot commissioning (process fluids) → performance test.

  • Change control: any change after design freeze must be assessed for cost, schedule, safety, and cybersecurity impact; undocumented changes are a major source of project failure.

  • Earned value management: CPI = EV/AC and SPI = EV/PV; values below 1.0 indicate cost or schedule overrun.

Quick reference

Standards and Codes of Practice

  • IEC 61511 (process industry SIS), IEC 61508 (generic functional safety), IEC 62443 (industrial cybersecurity), IEC 61131-3 (PLC programming languages), IEC 61850 (substation automation).

  • ISA-18.2 (alarm management), ISA-88 (batch control), ISA-95 (enterprise-control integration), ISA-101 (HMI design), ISA-84 (SIS, aligned with IEC 61511).

  • Hazardous area classification: IEC 60079 series; Zone 0/1/2 for gas, Zone 20/21/22 for dust; equipment marking includes Ex ia/ib/d/e and temperature class T1–T6.

  • ATEX Directive 2014/34/EU for equipment and 1999/92/EC for workplace; in Hong Kong, the Factories and Industrial Undertakings (Dangerous Substances) Regulations and local fire services requirements apply.

  • Electrical installations: IEC 60364 and local wiring regulations (e.g., HKIE/EMSD guidance and the Electricity Ordinance in Hong Kong).

  • Pressure equipment: ASME VIII or PED 2014/68/EU depending on jurisdiction; instrument air quality per ISO 8573-1.

  • Documentation standards: P&ID symbols per ISA-5.1; instrument identification letters per ISA-5.1 (e.g., FT = flow transmitter, FIC = flow indicating controller).

Quick reference

Professional Practice, Ethics and Legal Responsibilities

  • HKIE Code of Conduct: members must act with integrity, competence, and objectivity, and must not misrepresent their qualifications or experience.

  • Duty to public safety and health overrides commercial pressure; if a design is unsafe, the engineer must report it through the appropriate channel, including to the client and, if necessary, the authorities.

  • Conflict of interest must be declared in writing and managed; accepting undisclosed benefits from suppliers is a breach of professional conduct.

  • Confidentiality: client information must not be disclosed without consent except where required by law or where public safety is at risk.

  • Legal liability: designers owe a duty of care; negligence requires a duty, a breach, causation, and damage. Contracts may limit liability but cannot exclude liability for death or personal injury.

  • Statutory duties in Hong Kong: Occupational Safety and Health Ordinance, Factories and Industrial Undertakings Ordinance, and the Electricity Ordinance impose duties on employers and designers.

  • Continuing professional development (CPD) is a requirement of HKIE membership; records should be kept and declared honestly.