HKIE Professional Assessment - Electronics Discipline key terms
HKIE Professional Assessment - Electronics Discipline · Get comfortable with the vocabulary.
- Designated Registered Structural Engineer (RSE) sign-off on builder's works
- Related: Minor works system, Registered Electrical Contractor
A statutory certification route under Hong Kong's Buildings Ordinance regime where a registered structural engineer confirms structural adequacy of works; electronics practitioners rarely hold this role but must coordinate with it when installing equipment affecting building structure.
- Minor works system
- Related: Designated Registered Structural Engineer (RSE) sign-off on builder's works
A Hong Kong Buildings Department framework allowing specified small-scale building works to proceed under simplified procedures using prescribed plans and qualified persons, rather than full plan submission and approval.
- Registered Electrical Contractor
- Related: Fixed electrical installation, Minor works system
A contractor registered with Hong Kong's Electrical and Mechanical Services Department to carry out electrical installation work; fixed electrical installations in buildings must generally be undertaken or supervised within this registration framework.
- Fixed electrical installation
- Related: Registered Electrical Contractor, Periodic inspection, testing and certification (PITC)
The permanently installed wiring, switchgear, distribution boards and accessories supplying premises, as distinct from plug-in appliances; in Hong Kong it is subject to periodic inspection, testing and certification requirements.
- Periodic inspection, testing and certification (PITC)
- Related: Fixed electrical installation, Work completion certificate
A recurring statutory safety regime for fixed electrical installations in Hong Kong, requiring inspection and testing by competent persons at intervals set by installation type, followed by issue of a certificate of testing.
- Work completion certificate
- Related: Periodic inspection, testing and certification (PITC), Commissioning
A formal declaration issued after electrical or lift and escalator works are finished, confirming the installation meets applicable safety requirements before it is energised or handed over for use.
- Electromagnetic compatibility (EMC) compliance
- Related: Declaration of conformity, Radiocommunications equipment type approval
Demonstrating that equipment both limits emitted electromagnetic disturbance and tolerates disturbance in its environment, typically through standards-based testing, technical documentation and a declaration of conformity before placing on the market.
- Radiocommunications equipment type approval
- Related: Electromagnetic compatibility (EMC) compliance, Declaration of conformity
A Hong Kong regulatory process under which radio transmitting apparatus must be approved or certified against prescribed technical standards before it may be offered for sale or use on designated frequencies.
- Declaration of conformity
- Related: Electromagnetic compatibility (EMC) compliance, Technical file
A manufacturer's signed statement that a product meets specified standards and directives, supported by test evidence and technical files; it shifts primary verification responsibility onto the supplier rather than a pre-market regulator.
- Technical file
- Related: Declaration of conformity, Design review record
The retained compilation of design information, test reports, risk assessments and labelling evidence that substantiates a product's compliance claims and must be producible to an enforcement authority on request.
- Construction Sites (Safety) Regulations duty
- Related: Occupational safety and health risk assessment, Personal protective equipment (PPE) programme
The Hong Kong safety obligations placed on contractors and site personnel to provide safe systems of work, protective equipment and supervision, breach of which can attract criminal liability independent of civil negligence claims.
- Occupational safety and health risk assessment
- Related: Construction Sites (Safety) Regulations duty, Hierarchy of control
A structured process of identifying hazards in a task or workplace, estimating likelihood and severity of harm, and recording controls; in Hong Kong it underpins statutory safety management and is expected before high-risk work begins.
- Hierarchy of control
- Related: Occupational safety and health risk assessment, Personal protective equipment (PPE) programme
The ordered preference for risk controls: eliminate the hazard, substitute, apply engineering controls, then administrative measures, with personal protective equipment as the last line of defence.
- Personal protective equipment (PPE) programme
- Related: Hierarchy of control, Lockout-tagout (LOTO)
The selection, issue, training, inspection and replacement regime for protective items such as helmets, eye protection and insulated gloves; it is a residual control and does not remove the underlying hazard.
- Lockout-tagout (LOTO)
- Related: Personal protective equipment (PPE) programme, Permit-to-work system
An energy-isolation procedure in which sources are switched off, isolated, locked and tagged by the person working on the equipment, preventing unexpected energisation during maintenance or installation.
- Permit-to-work system
- Related: Lockout-tagout (LOTO), Commissioning
A formal authorisation process for high-risk activities, recording the scope, isolations, precautions and sign-offs required before work starts and confirming safe restoration before the permit is closed.
- Commissioning
- Related: Work completion certificate, Punch list
The staged process of verifying that installed systems function as designed, covering pre-functional checks, energisation, functional performance testing, tuning and documented handover to the client.
- Punch list
- Related: Commissioning, Retention money
A register of outstanding defects or incomplete items identified during inspection and commissioning, each tracked with an owner and close-out date before final acceptance and release of retention.
- Retention money
- Related: Defects liability period, Interim payment certificate
A percentage withheld from interim payments as security for performance and defect rectification, released in stages, commonly half on completion and half after the defects liability period expires.
- Defects liability period
- Related: Retention money, Punch list
A defined period after completion during which the contractor must remedy defects notified by the employer at its own cost, after which the remaining retention and final account are settled.
- Interim payment certificate
- Related: Retention money, Variation order
A periodic valuation and certification of work done, issued by the contract administrator, which fixes the amount and timing of progress payments and triggers payment obligations under the contract.
- Variation order
- Related: Interim payment certificate, Extension of time claim
A written instruction changing the scope, quantity, quality or timing of contracted work; without proper authority and documentation it may not be recoverable as additional payment.
- Extension of time claim
- Related: Liquidated damages, Variation order
A contractor's request to extend the completion date for delay caused by an excusable event, supported by records and programme analysis, which protects against liquidated damages for that period.
- Liquidated damages
- Related: Extension of time claim, Defects liability period
A pre-agreed sum payable per period of culpable delay, representing a genuine forecast of the employer's loss; it must not be a penalty or it becomes unenforceable.
- Conflict of interest declaration
- Related: Fiduciary duty to client, Whistleblowing
A written disclosure of any financial or personal interest that could influence professional judgement, made promptly to the client or employer so that the situation can be managed or the member withdrawn.
- Fiduciary duty to client
- Related: Conflict of interest declaration, Fitness for purpose versus reasonable skill and care
The obligation to act in the client's legitimate interests, avoid undisclosed gain, keep information confidential and give impartial technical advice even where it conflicts with the engineer's commercial convenience.
- Fitness for purpose versus reasonable skill and care
- Related: Fiduciary duty to client, Design review record
Two distinct standards of professional obligation: an absolute promise that the result will suit a stated purpose, versus a duty to exercise the competence expected of a reasonably competent practitioner in comparable circumstances.
- Whistleblowing
- Related: Conflict of interest declaration, Construction Sites (Safety) Regulations duty
Reporting suspected wrongdoing, unsafe practice or regulatory breach to an appropriate internal or external authority, which professional codes protect when done in good faith and through proper channels.
- Design review record
- Related: Technical file, Verification and validation
Documented evidence that a design was checked at defined stages by competent persons independent of the originator, covering calculations, interfaces, assumptions and resolution of comments.
- Verification and validation
- Related: Design review record, Test coverage
Verification confirms a design meets its specified requirements; validation confirms the resulting system meets the user's actual need in the intended operating environment. Both need planned evidence, not opinion.
- Signal integrity
- Related: Controlled impedance stackup, Eye diagram
The preservation of waveform quality along an interconnect, degraded by reflections, crosstalk, attenuation and ground bounce; controlled impedance, termination and return-path continuity are the usual countermeasures.
- Controlled impedance stackup
- Related: Signal integrity, Eye diagram
A printed circuit board layer arrangement in which trace width, dielectric thickness and spacing are chosen so that transmission lines present a target characteristic impedance, agreed with the fabricator and verified by test coupons.
- Eye diagram
- Related: Signal integrity, Bit error rate
An overlay of many signal transitions on a common time base, whose opening indicates margin against timing jitter and amplitude noise; mask tests define pass or fail limits.
- Bit error rate
- Related: Eye diagram, Link budget
The proportion of received bits that are wrong over a defined interval; it links link-budget, noise and equalisation performance to a measurable acceptance criterion, often quoted at a specified confidence.
- Link budget
- Related: Bit error rate, Fade margin
An accounting of gains and losses from transmitter through channel to receiver, showing the margin above the minimum required received level, including antenna gain, path loss and implementation losses.
- Fade margin
- Related: Link budget, Bit error rate
The extra received signal strength designed in above the minimum threshold, providing headroom against fading, ageing and interference so that availability targets are met over the system's life.
- Nyquist criterion and aliasing
- Related: Quantisation noise, Finite impulse response (FIR) filter
Sampling a band-limited signal at more than twice its highest frequency preserves information; sampling slower folds high frequencies onto low ones as aliasing, which anti-alias filtering must prevent before conversion.
- Quantisation noise
- Related: Nyquist criterion and aliasing, Effective number of bits
The error introduced when a continuous amplitude is rounded to discrete levels; for an ideal converter it approximates uniform noise, giving roughly six decibels of signal-to-noise improvement per added bit.
- Effective number of bits
- Related: Quantisation noise, Test coverage
A measured figure of converter performance derived from signal-to-noise-and-distortion ratio, capturing real impairments such as clock jitter and nonlinearity that ideal bit-count specifications hide.
- Finite impulse response (FIR) filter
- Related: Nyquist criterion and aliasing, Watchdog timer
A digital filter whose output depends only on present and past inputs, giving guaranteed stability and exactly linear phase when coefficients are symmetric, at the cost of more computation.
- Watchdog timer
- Related: Finite impulse response (FIR) filter, Mean time between failures
A hardware counter that resets the processor unless periodically serviced by software, recovering embedded systems from hangs; it must be serviced from a proven-alive code path, not an interrupt blindly.
- Mean time between failures
- Related: Failure modes and effects analysis, Availability
The expected operating time between successive failures of a repairable system, computed from component failure rates; it describes reliability, not the lifetime of an individual unit.
- Availability
- Related: Mean time between failures, Failure modes and effects analysis
The fraction of time a system is operable, combining reliability and maintainability; it is often expressed as uptime over total time and improved by redundancy or faster repair.
- Failure modes and effects analysis
- Related: Mean time between failures, Verification and validation
A systematic tabulation of how each part or function can fail, its local and system effects, and its severity, occurrence and detection ratings, used to prioritise design and test effort.