HKIE Professional Assessment - Energy Discipline study materials
HKIE Professional Assessment - Energy Discipline study resources

HKIE Professional Assessment - Energy Discipline cheat sheet

HKIE Professional Assessment - Energy Discipline · Keep the key ideas within reach.

Quick reference

Energy Fundamentals

  • Energy is conserved (First Law); exergy is destroyed by irreversibility, so exergy analysis locates true inefficiency where energy balances show none.

  • Primary energy to delivered energy: conversion chain losses (generation, transmission, distribution) mean site electricity typically carries ~2.5-3x the primary energy of a direct fuel use.

  • SI units: 1 kWh = 3.6 MJ; 1 tonne oil equivalent (toe) = 41.868 GJ; 1 tonne coal equivalent (tce) = 29.308 GJ.

  • Power vs energy: kW is instantaneous rate, kWh is energy over time; demand charges in tariffs are set by maximum kW, consumption charges by kWh.

  • Capacity factor = actual annual energy output / (rated capacity x 8760 h). Typical: nuclear ~90%, offshore wind 40-50%, solar PV 12-20% in Hong Kong latitude.

  • Load factor = average load / peak load over a period; a low load factor signals peaky demand and poor asset utilisation, raising unit cost.

  • Energy return on investment (EROI) = energy delivered / energy invested over lifecycle; EROI below ~3 is generally judged unable to support modern society.

  • Sankey diagrams obey conservation at every node; the width of each flow is proportional to energy rate, so branch widths must sum to the input.

Quick reference

Thermodynamics and Heat Transfer

  • First Law for a steady-flow open system: Q - W = m[(h2 - h1) + (V2^2 - V1^2)/2 + g(z2 - z1)]; neglect kinetic and potential terms for most plant calculations.

  • Carnot efficiency = 1 - Tc/Th with absolute temperatures (K). It is an upper bound for any heat engine operating between those reservoirs; no real cycle reaches it.

  • Second Law: entropy of an isolated system never decreases; for a control volume, entropy generation S_gen = sum(m_out s_out) - sum(m_in s_in) - sum(Q/T_boundary) >= 0.

  • Rankine cycle efficiency is improved by raising boiler pressure/temperature, lowering condenser pressure, and adding feedwater heating (regenerative) or reheat.

  • Conduction: Fourier's law q = -kA dT/dx; plane wall resistance R = L/(kA); cylindrical wall R = ln(r2/r1)/(2 pi k L).

  • Convection: Newton's law q = hA(Ts - Tf); Nusselt number Nu = hL/k links convection to conduction; Nu = C Re^m Pr^n for forced convection correlations.

  • Radiation: q = epsilon sigma A (Ts^4 - Tsurr^4), sigma = 5.67e-8 W/m2K4. Radiation dominates at high temperature and is independent of air movement.

  • Overall heat transfer coefficient: 1/UA = 1/(h1 A1) + R_wall + 1/(h2 A2); the largest resistance controls the design and the fouling allowance.

  • Heat exchanger effectiveness NTU method: effectiveness = actual heat transfer / maximum possible; for counterflow, higher NTU and higher Cr ratio give higher effectiveness.

Quick reference

Energy Conversion Systems and Power Plant Engineering

  • Rankine cycle: pump work is small relative to turbine work; cycle efficiency = (W_turbine - W_pump)/Q_in. Superheat and reheat raise both efficiency and exhaust dryness fraction.

  • Gas turbine Brayton cycle: efficiency depends mainly on pressure ratio and turbine inlet temperature; simple-cycle efficiency ~35-40%, combined cycle (CCGT) 55-62%.

  • Combined cycle: exhaust gas from the gas turbine generates steam in an HRSG for a bottoming steam cycle; overall efficiency is roughly the sum of the two cycles minus losses.

  • Diesel engine indicated thermal efficiency = brake thermal efficiency / mechanical efficiency; specific fuel consumption (g/kWh) = 3.6e6 / (LHV in MJ/kg x efficiency).

  • Boiler efficiency by indirect (loss) method: efficiency = 100 - (dry flue gas loss + moisture loss + unburnt carbon + radiation/convection loss). Flue gas loss dominates; each 20 C reduction in stack temperature saves about 1% fuel.

  • Steam turbine heat rate (kJ/kWh) = 3600 / cycle efficiency; a lower heat rate means better plant performance and is the standard performance-test metric.

  • Cooling: condenser vacuum is set by cooling water temperature plus terminal temperature difference; a 1 C rise in condenser pressure degrades output by roughly 0.5-1% for a steam turbine.

  • Combustion stoichiometry: for a hydrocarbon CxHy, theoretical air moles O2 = x + y/4 per mole fuel; excess air ~3-10% for gas, 10-20% for oil, 20-40% for coal in practice.

  • Plant auxiliaries (ID/FD fans, pumps, mills) consume 5-10% of gross output; net output = gross output - auxiliary load, and net efficiency is the figure used in performance guarantees.

Quick reference

Renewable and Low-Carbon Energy Technologies

  • Solar PV: module rated at STC (1000 W/m2, 25 C, AM1.5). Power temperature coefficient is typically -0.3 to -0.45 %/K, so cell temperature above 25 C reduces output.

  • PV yield estimate: annual kWh = installed kWp x peak sun hours x performance ratio (PR). PR of 0.75-0.85 accounts for temperature, soiling, inverter and wiring losses.

  • Wind power in the swept area: P = 0.5 rho A V^3 Cp. Betz limit Cp = 16/27 = 0.593; modern turbines achieve Cp 0.35-0.45 and cut-in/cut-out typically 3-4 m/s and 25 m/s.

  • Wind energy is proportional to the cube of wind speed, so a 10% speed error gives about a 33% energy error; site wind measurement campaigns of at least 12 months are standard.

  • Solar thermal: flat plate collectors suit low temperature (<80 C); evacuated tube and concentrating collectors reach higher temperatures; efficiency falls as the collector-to-ambient temperature difference rises.

  • Hydropower: P = rho g Q H eta; small hydro needs head and flow data over a full hydrological year, and design flow is usually set near the flow exceeded 30-40% of the time.

  • Biomass and waste-to-energy: net calorific value on a wet basis is lower than dry basis; moisture content directly reduces combustion temperature and boiler efficiency.

  • Grid integration: variable renewables require firm capacity, flexibility and curtailment rules; Hong Kong's CLP and HK Electric schemes set feed-in tariff rates by technology and capacity band.

  • Hydrogen: electrolysis efficiency 60-80% (LHV); round-trip efficiency via fuel cell is typically 30-40%, so hydrogen suits long-duration or hard-to-abate uses rather than routine storage.

Quick reference

Energy Efficiency, Auditing and Demand-Side Management

  • Energy audit hierarchy: preliminary (walk-through) identifies saving opportunities; detailed audit measures and verifies them with sub-metering, trend logs and regression against production or weather.

  • Energy baseline: use regression of consumption against drivers (degree days, tonnes produced, occupancy). Adjust baseline for changes in conditions before claiming savings (IPMVP Option C whole-facility or Option B retrofit isolation).

  • Simple payback = capital cost / annual saving. Life-cycle cost and NPV must be used where equipment life exceeds payback by a wide margin; include maintenance and energy escalation.

  • Load profile analysis: coincident peak and load duration curve determine whether a measure reduces demand charges, energy charges, or both. Shifting load does not save energy by itself.

  • Demand-side management: peak clipping, valley filling, load shifting and strategic conservation. Interval metering at 15-30 minute resolution is the basic data source.

  • Motor and drive savings: affinity laws give flow proportional to speed, head to speed squared, power to speed cubed. A VSD at 80% speed uses about 51% of full-speed power.

  • Lighting: efficacy in lm/W; LED 100-150 lm/W versus fluorescent 60-90 lm/W. Lighting power density (W/m2) is the code metric; controls add 20-40% savings in daylit or intermittently occupied spaces.

  • Compressed air is among the most expensive utilities; leaks typically waste 20-30% of output. Measure with a no-load run-down test or ultrasonic leak detection.

  • Measurement and verification requires an uncertainty statement; savings smaller than twice the metering uncertainty should not be claimed as verified.

Quick reference

Building Services, HVAC and Electrical Energy Systems

  • Cooling load components: conduction through envelope, solar gain through glazing, internal gains (people, lighting, equipment), ventilation and infiltration latent and sensible loads. Peak load sets plant size; annual energy sets operating cost.

  • Chiller efficiency: COP = cooling output / electrical input. kW/RT = 3.517 / COP; a chiller at 0.6 kW/RT has COP about 5.9. Water-cooled chillers typically 0.55-0.65 kW/RT, air-cooled 0.9-1.1 kW/RT.

  • Chilled water supply/return temperature difference: a low delta-T syndrome raises pumping energy and forces more chillers on. Design delta-T is commonly 5-7 C for standard systems.

  • Fan and pump laws: power varies with the cube of speed; system curve intersection determines the actual operating point, so throttling wastes energy where VSD control is possible.

  • Hong Kong Building Energy Code (BEC) under the Buildings Energy Efficiency Ordinance sets prescriptive requirements for HVAC, lighting, and power; designers may instead meet the performance-based route via whole-building energy simulation.

  • Fresh air: ASHRAE 62.1 or local code sets minimum outdoor air per person and per floor area. Demand-controlled ventilation using CO2 sensors saves energy where occupancy varies.

  • Power factor: kVA = kW / pf. Power factor correction to 0.95+ avoids utility penalties and reduces cable and transformer losses; capacitors are sized in kVAr = kW (tan phi1 - tan phi2).

  • Electrical distribution losses: I^2 R losses fall with voltage; transformer no-load loss is continuous, so lightly loaded transformers should be de-energised or replaced with high-efficiency units.

  • Harmonics from VSDs and LED drivers cause neutral overheating and transformer derating; total harmonic distortion limits are typically 5% voltage at the point of common coupling.

Quick reference

Energy Economics, Policy, Regulation and Carbon Management

  • Levelised cost of energy (LCOE) = sum of discounted costs / sum of discounted energy output. It ignores system integration cost, so it is not a full comparison of dispatchable versus variable generation.

  • NPV and IRR: accept projects with positive NPV at the hurdle rate; IRR is the discount rate giving zero NPV, and it can mislead when comparing projects of different scale or timing.

  • Carbon intensity: grid emission factor in kg CO2e/kWh. Hong Kong's CLP and HK Electric factors are published annually and are used in BEAM Plus and government carbon audits.

  • Scope 1 (direct combustion and fugitive), Scope 2 (purchased electricity, heat, steam) and Scope 3 (value chain) follow the GHG Protocol; Scope 2 may be reported location-based or market-based.

  • Carbon offsets and renewable energy certificates must be additional, verifiable and retired; buying certificates does not remove the need to measure and reduce direct emissions first.

  • Hong Kong policy instruments: feed-in tariff, renewable energy certificates, BEAM Plus certification, the Buildings Energy Efficiency Ordinance and the Energy Efficiency Ordinance registration scheme for prescribed products.

  • Marginal abatement cost curve: rank measures by cost per tonne CO2e abated; negative-cost measures are those with net financial benefit over life and should be pursued first.

  • Electricity tariff structure: CLP and HK Electric tariffs combine a basic charge (energy) and a fuel clause adjustment (fuel cost pass-through); demand charges apply to larger customers.

  • Discount rate choice matters: a 3% versus 8% rate can reverse the ranking of long-life renewables against short-life efficiency measures.

Quick reference

Energy Project Management, Safety and Environmental Compliance

  • Project lifecycle: feasibility, design, tender, construction, commissioning, handover, operation. Energy performance guarantees should be tied to defined test conditions and measurement methods.

  • Commissioning: functional performance testing verifies that systems meet design intent; retro-commissioning of existing buildings typically yields 5-15% energy savings.

  • Hazardous energy control (lockout/tagout) is mandatory before work on rotating plant, electrical panels or pressurised steam systems; isolation must be verified by test, not assumption.

  • Confined space entry into boilers, tanks and ducts requires atmosphere testing (O2 19.5-23.5%), permit-to-work, standby person and rescue plan.

  • Hong Kong statutory framework: Factories and Industrial Undertakings Ordinance and its subsidiary regulations, the Electricity Ordinance, the Boilers and Pressure Vessels Ordinance, and the Air Pollution Control Ordinance.

  • Environmental compliance: Air Pollution Control Ordinance caps emissions from specified processes; noise from fixed plant is controlled under the Noise Control Ordinance with permitted levels at noise sensitive receivers.

  • Environmental Impact Assessment Ordinance requires designated projects to pass the EIA process and obtain an environmental permit before construction.

  • Risk register with probability and consequence scoring; safety integrity for high-hazard controls follows a defined safety lifecycle with documented proof testing.

  • Contract forms: HKIA/HKIS standard forms, NEC4 for collaborative delivery; liquidated damages, retention and performance bonds allocate schedule and performance risk.

Quick reference

Professional Practice, Ethics and Engineering Judgement

  • HKIE members are bound by the Code of Conduct: honesty and integrity, competence within one's field, public safety and health first, and disclosure of conflicts of interest.

  • Signing and sealing work certifies personal technical responsibility. A member should only sign work they have personally supervised or reviewed, and should record the basis of the judgement.

  • Whistleblowing duty: where a member becomes aware of a practice endangering public safety, the obligation is to report internally first and to the authority if not resolved.

  • Conflict of interest: declare in writing, withdraw from decision-making, and never accept benefits that could influence judgement; gifts beyond token value should be declined or declared.

  • Continuing professional development is a condition of registration; HKIE requires a documented CPD record, typically a minimum number of hours per year across technical and non-technical categories.

  • Engineering judgement under uncertainty: state assumptions, quantify uncertainty where possible, apply the precautionary principle to safety, and document the decision trail for later review.

  • Sustainable development duty: engineers should minimise whole-life resource use and emissions, and should not accept a brief that is technically unsafe or environmentally non-compliant without recorded objection.

  • Expert evidence and reports must distinguish fact from opinion, cite verified data, and disclose the limits of the analysis performed.