Quick reference

Gas Supply Systems and Network Design

  • Hong Kong town gas is manufactured from naphtha and natural gas feedstock and distributed at a declared calorific value; LPG is supplied as an air/LPG mixture or in cylinders and bulk tanks.

  • Network pressure tiers in Hong Kong practice: high-pressure (transmission), medium-pressure (district), and low-pressure (service to meters); each tier has its own pipe material and jointing rules.

  • Peak demand estimation uses diversity (after-diversity maximum demand, ADMD) applied to connected load; ADMD falls as the number of consumers in a group rises.

  • Pipe sizing for distribution mains uses the general flow equation (e.g. Spitzglass, Pole, or Renouard) with allowable pressure drop as the design constraint, not velocity alone.

  • Network analysis must consider the worst-case scenario: peak hour demand plus fire/emergency load, with n-1 contingency on critical mains and governor stations.

  • Governor (pressure regulator) stations require fail-safe design, relief or monitor regulators, and lock-up and slam-shut protection against overpressure downstream.

  • Polyethylene (PE) is standard for buried medium- and low-pressure mains; steel is used for high pressure and above-ground sections, with cathodic protection where buried.

  • Minimum cover, separation from other utilities (water, electricity, drainage), and marker tape/warning tiles are design requirements for buried gas mains.

Quick reference

Gas Properties, Combustion and Utilisation

  • Wobbe index = calorific value / sqrt(relative density); it is the interchangeability criterion - appliances operate correctly only when Wobbe index stays within the declared range.

  • Stoichiometric (theoretical) air for a fuel is calculated from the combustion equation; methane needs 2 mol O2 per mol CH4, i.e. about 9.5 m3 air per m3 gas.

  • Complete combustion products of methane: CO2 and H2O; incomplete combustion yields CO, which is toxic and is the main indoor hazard indicator.

  • Flammability limits of methane in air are approximately 5% (LFL) and 15% (UFL) by volume; LPG (propane/butane) LFL is about 1.8–2.1%, making leaks more readily ignitable.

  • LPG vapour is heavier than air (relative density about 1.5–2.0) and accumulates in low points, basements, and pits; natural gas/town gas is lighter and accumulates at high level.

  • Excess air (lambda) above 1 is required for practical combustion; CO2 in flue gas and O2 trimming are used to monitor and optimise combustion efficiency.

  • Autoignition temperature of methane is about 540 °C; flashback occurs when flame speed exceeds burner port velocity, lift-off when port velocity exceeds flame speed.

Quick reference

Gas Installation Design and Pipework Sizing

  • Domestic installation pipework is sized on the allowable pressure drop from meter outlet to the most remote appliance, using the same flow equations as distribution but with tighter limits.

  • Equivalent length method: fittings and bends are converted to equivalent straight pipe lengths (using k-factor or tabulated ratios) and added to the measured length.

  • Typical allowable pressure drop is a percentage of the operating pressure at the meter (e.g. 1 mbar for low-pressure domestic installations), and each appliance must receive its rated pressure at full load.

  • Installation pipe materials include copper (with appropriate jointing), steel, and corrugated stainless steel tubing (CSST); each has restrictions on location and protection.

  • Pipes must be protected against corrosion, mechanical damage, and thermal movement; sleeves are required where pipes pass through walls, floors, or cavities.

  • Gas meters and emergency control valves must be accessible; the meter outlet should have an isolation valve, and a label indicating the gas type and pressure is required.

  • Appliance connection uses a rigid connection or an approved flexible connector; hose length and location restrictions apply, and hoses must not pass through walls or ceilings.

  • Manifold and multi-appliance installations require balancing so that opening or closing one appliance does not cause unacceptable pressure variation at another.

Quick reference

Ventilation, Flueing and Indoor Air Quality

  • Open-flued and flueless appliances require purpose-provided ventilation: permanent air inlets sized by appliance rating (e.g. cm2 per kW input) in addition to adventitious ventilation.

  • Room-sealed (balanced) appliances take combustion air from outside and discharge flue products outside, avoiding indoor air quality impacts and reducing ventilation demand.

  • Flue design must ensure adequate draught, correct terminal location away from openings, and prevention of downdraught and recirculation of products of combustion.

  • Flue terminal clearances are specified relative to windows, doors, air bricks, and adjacent buildings; terminals must not discharge into enclosed spaces.

  • Chimney/flue draught depends on height and temperature difference (stack effect); flue gas temperature must remain above dew point to avoid condensation in conventional flues.

  • CO detectors should be installed in rooms containing open-flued appliances and in sleeping areas; they supplement, not replace, correct flueing and ventilation.

  • Indoor air quality management includes controlling CO, CO2, NOx, and humidity; kitchen extract and general ventilation rates must match appliance and occupancy loads.

Quick reference

Gas Safety, Hazard and Risk Management

  • Gas safety hierarchy: eliminate ignition sources, isolate and purge before work, test for gas, ventilate, and use intrinsically safe equipment in hazardous zones.

  • Hazardous area classification for gas installations: Zone 0 (continuous), Zone 1 (occasional), Zone 2 (short-term); electrical equipment must be certified to the corresponding category.

  • Gas detection: flammable gas detectors (catalytic or IR) alarm at a fraction of LFL (commonly 10–20% LFL) and trigger isolation/ventilation; CO detectors alarm at low ppm thresholds.

  • Purging: displacement or inert gas purging is required before introducing gas into new pipework and before maintenance; purge volume and end-point testing must be documented.

  • Risk assessment uses likelihood × consequence; gas-specific controls include emergency shutdown valves, excess flow valves, and pressure protection systems.

  • Emergency response: raise alarm, isolate supply, ventilate, evacuate, and call the gas utility; no naked flames or electrical switching in a gas-affected area.

  • Incident investigation follows a structured method (timeline, root cause, barrier analysis) and feeds back into design and maintenance procedures.

Quick reference

Codes, Standards and Regulatory Framework (Hong Kong)

  • The Gas Safety Ordinance (Cap. 51) and its subsidiary regulations govern the supply, installation, and use of gas in Hong Kong; the Gas Safety (Gas Supply) Regulations and Gas Safety (Installation and Use) Regulations are key instruments.

  • The Electrical and Mechanical Services Department (EMSD) is the gas safety authority; the Gas Standards Office administers registration of gas installers and contractors.

  • The Hong Kong Gas Safety (Registration of Gas Installers) Regulations require competent persons to be registered for specific classes of gas work.

  • Codes of Practice issued by EMSD (e.g. on gas installation, LPG, and flueing) provide the technical means of compliance with the Ordinance.

  • Hong Kong standards reference international standards (e.g. BS, EN, ISO) where local codes are silent; the code of practice takes precedence where there is conflict.

  • LPG bulk storage and cylinder stores are regulated with separation distances, fire protection, and notification requirements under the Gas Safety Ordinance and Dangerous Goods Ordinance.

  • Records of installation, testing, and maintenance must be kept and made available for inspection; non-compliance can lead to disconnection and prosecution.

Quick reference

LPG and LNG Installations and Bulk Storage

  • LPG (propane/butane mixture) is stored as a liquid under pressure; bulk tanks are sized for consumption, refill interval, and vapour space, with a maximum filling ratio (about 80–85% liquid fill).

  • LPG bulk tank installations require separation distances from buildings, boundaries, and ignition sources; these distances depend on tank capacity and are specified in the code.

  • Cylinder stores require ventilation at high and low level, no ignition sources, and segregation from oxidisers; cylinders must be upright and secured.

  • LPG vaporisers are used when the natural vaporisation rate is insufficient; they must be protected against overpressure and low temperature (frosting).

  • LNG is stored cryogenically at about −162 °C; materials must be suitable for low temperature, and boil-off gas management and vapour dispersion are key design issues.

  • LNG/LPG facilities require gas detection, fire protection (water spray/deluge), emergency shutdown, and exclusion zones for hot work.

  • Pipework for LPG liquid service must account for expansion, hydraulic shock, and hydrostatic pressure from liquid head; relief valves protect trapped sections.

Quick reference

Commissioning, Testing, Inspection and Maintenance

  • Strength (pressure) test: pipework is tested at a pressure above operating pressure (commonly 1.5× design or per code) with a suitable medium; pneumatic testing requires extra precautions.

  • Tightness (leak) test: after strength test, pressure is held and monitored for a specified duration with no measurable drop, allowing for temperature stabilisation.

  • Purging and commissioning: air is displaced by inert gas then gas; gas is introduced and appliances are commissioned with combustion analysis (CO/CO2, excess air).

  • Inspection stages include design review, installation inspection, pressure testing, and final commissioning; results are recorded and signed off by a registered installer.

  • Maintenance regimes include periodic inspection of pipework, flueways, ventilation, and safety devices; appliance servicing includes cleaning, combustion check, and safety device testing.

  • Non-destructive testing (visual, pressure, and where required, leak detection by soap solution or electronic detector) is used to verify joint integrity.

  • Records management: test certificates, as-built drawings, and maintenance logs must be retained and updated; they support incident investigation and regulatory inspection.

Quick reference

Professional Practice, Ethics and Project Management

  • Professional engineers owe duties to public safety, the client, and the profession; where safety conflicts with cost or schedule, safety takes precedence and concerns must be escalated.

  • Competence limits: work only within your registered class and experience; seek specialist input for unfamiliar designs, and document assumptions and decisions.

  • Ethical conduct includes honesty in reporting test results, avoiding conflicts of interest, confidentiality, and refusing to certify work not personally verified.

  • Project management for gas installations covers scope, programme, cost, risk register, stakeholder interface (utility, contractor, authority), and change control.

  • Design reviews and hazard studies (HAZOP, HAZID) are used to identify and mitigate risks at concept and detailed design stages.

  • Contract administration: specifications, method statements, and inspection and test plans (ITPs) define acceptance criteria and hold points for witness.

  • Continuing professional development and knowledge of current codes are professional obligations; outdated practice must not be used without justification.

Quick reference

Energy Efficiency, Environment and Emerging Low-Carbon Gases

  • Combustion efficiency is improved by matching excess air, maintaining clean heat exchangers, and using condensing appliances that recover latent heat (efficiency above 90% on gross calorific value).

  • Gross vs net calorific value: condensing appliances can exceed 100% of gross efficiency because latent heat of water vapour is recovered.

  • Hydrogen blending into natural gas networks reduces CO2 intensity per unit energy; blending limits depend on end-use appliances and network materials.

  • Biomethane (upgraded biogas) is a drop-in renewable gas; injection requires quality specification for CO2, H2S, water, and calorific value.

  • Carbon accounting for gas installations includes scope 1 (direct combustion), scope 2 (purchased electricity), and scope 3 (supply chain); efficiency measures reduce scope 1.

  • Demand-side measures: appliance selection (high-efficiency boilers, heat pumps for low-grade heat), controls, insulation, and heat recovery.

  • Environmental impacts of gas projects include NOx and CO emissions, land use for LNG/LPG facilities, and lifecycle greenhouse gas assessment; mitigation is part of design.