- Rehost (lift-and-shift)
- Moving an application to cloud infrastructure with no code changes, typically using block-level replication tooling. It is the fastest migration pattern but captures the least cloud-native benefit.
- Relocate
- Moving workloads to a vendor-managed platform without changing code or architecture, such as moving VMware virtual machines into a native cloud VMware service. It preserves existing operations tooling.
- Migration factory
- A standardized, repeatable execution pipeline of people, tooling, and runbooks that migrates workloads in waves. Throughput is measured in applications per wave rather than per project.
- Refactor
- Redesigning an application's architecture, often into services, to gain scalability and release agility. It delivers the highest cloud benefit but carries the highest cost, time, and risk.
- Retain versus retire
- Retain keeps a workload in place because no business case exists yet; retire decommissions it because it is unused or redundant. Both remove work from the migration backlog.
- Mobilize phase
- The migration phase between assessment and full-scale execution that builds the landing zone, selects pilot workloads, and establishes the migration factory before waves begin.
- Hard dependency
- A synchronous, latency-sensitive connection between workloads that must remain co-located or closely connected. Hard dependencies define move groups and constrain wave sequencing.
- Move group
- A set of workloads that must migrate together because of hard dependencies or shared infrastructure. Waves are composed of one or more move groups ordered by risk and value.
- Right-sizing from utilization
- Sizing target resources from observed peak utilization over a representative window, such as four weeks, rather than from provisioned capacity, then adding headroom for growth.
- Landing zone
- A pre-built cloud environment defining accounts, network topology, identity, logging, guardrails, and connectivity. It must be validated before the first migration wave executes.
- Wave readiness gate
- A formal checklist confirming landing zone validation, connectivity tests, approved runbooks, proven rollback, and stakeholder sign-off before a migration wave starts.
- Application dependency mapping
- Discovering network flows, ports, protocols, and data exchanges between applications to identify coupling. It combines automated discovery data with stakeholder interviews.
- Agent-based replication
- Continuous block-level copying of a server's volumes to the target environment, enabling test launches and short cutover windows with minimal source downtime.
- Configuration externalization
- Removing hard-coded hostnames, IP addresses, and file paths by moving them into parameter stores or service discovery. It is a prerequisite for scaling and portability.
- Stateless-first sequencing
- Migrating stateless application tiers before stateful tiers, since stateless components need no data synchronization and can be validated independently within a move group.
- Repurchase
- Replacing a self-hosted application with a SaaS product, which requires data export, integration rework, and identity federation planning rather than infrastructure migration.
- Replatform
- Making limited changes to move onto managed services, such as a self-managed database to a managed database or file shares to object storage, without altering core application code.
- Change data capture
- Continuously replicating ongoing inserts, updates, and deletes from a source database after an initial full load, enabling near-zero-downtime database migrations.
- Replication lag at cutover
- The delay between source and target writes. Cutover proceeds only when lag reaches zero and the source is quiesced, preventing lost or divergent data.
- Heterogeneous database migration
- Moving between different database engines, requiring schema conversion, data type mapping, and often rewriting application SQL and stored procedures.
- Data validation checksums
- Comparing hash totals, row counts, and sampled field values between source and target after loading. They detect truncation, encoding errors, and silent transformation defects.
- Reverse replication rollback
- A rollback path where changes made on the target after cutover are replicated back to the source, allowing a fast return without losing post-cutover transactions.
- Dedicated interconnect versus VPN
- A private dedicated connection offers higher bandwidth and predictable latency but has long provisioning lead times; an internet VPN is cheaper and faster to deploy with variable performance.
- Non-overlapping CIDR design
- Planning cloud address ranges that do not conflict with on-premises or other cloud networks. Overlap forces network address translation and complicates hybrid routing.
- Landing zone guardrails
- Organization policies, centralized logging, key management, network segmentation, and budget alerts applied at account or subscription level to enforce governance automatically.
- BYOL licensing constraint
- Bring-your-own-license terms may require dedicated hosts or bare-metal instances, which affects instance choice, cost model, and migration target selection.
- Cutover runbook
- An ordered task list with owners, timings, verification steps, communications, and explicit go/no-go decision points used to execute and validate a cutover.
- Parallel run
- Operating legacy and migrated systems simultaneously and comparing outputs. It is the safest cutover approach and the most expensive in cost and effort.
- Rollback trigger threshold
- A numeric criterion defined before cutover, such as an error-rate or replication-lag limit, that mandates reverting to the source system to avoid subjective decisions.
- DNS TTL lowering
- Reducing record time-to-live values days before cutover so clients pick up new addresses quickly, while retaining old records to support rollback.
- Hypercare period
- A temporary post-cutover window, typically one to four weeks, with elevated support staffing and daily triage. It ends when error rates stabilize and severe issues close.
- FinOps inform-optimize-operate
- The cost management cycle: inform through tagging and showback, optimize through rightsizing and commitment discounts, and operate through budgets, anomaly alerts, and reviews.
- Rightsizing threshold rule
- Sustained CPU and memory utilization below roughly twenty to forty percent over a review period marks a downsizing candidate; stateful systems require memory assessment before CPU.
- Commitment discount strategy
- Cover steady-state baseline load with reserved or committed-use purchases, leave variable load on-demand, and use spot or preemptible capacity for fault-tolerant batch work.
- Policy-as-code guardrail
- Governance rules expressed as machine-enforced policies that block or flag noncompliant resources, such as missing tags or public storage, without manual review.