HCSP-Cloud Migration study materials
HCSP-Cloud Migration study resources

HCSP-Cloud Migration key terms

HCSP-Cloud Migration · Get comfortable with the vocabulary.

Cloud Migration

The process of moving some or all of an organization's applications, data, and infrastructure from on-premises or legacy environments into a cloud platform, with planned changes to architecture, operations, and cost model.

Related: Migration Strategy, Cutover
Migration Strategy

A documented approach describing which workloads move, in what order, using which technique, and under what constraints such as budget, downtime tolerance, and compliance. It aligns technical work with business outcomes.

Related: Cloud Migration, Migration Wave
The 6 Rs

A classification of migration approaches: rehost, replatform, refactor or re-architect, repurchase, retain, and retire. Each workload is assigned one approach based on value, cost, risk, and technical fit.

Related: Rehost, Replatform, Refactor
Rehost

Moving a workload to cloud infrastructure with little or no code change, often called lift-and-shift. It is fast and low-risk but usually delivers limited cloud benefit until later optimization.

Related: The 6 Rs, Replatform, Lift and Shift
Replatform

Migrating a workload while making targeted changes to use managed cloud services, such as swapping a self-managed database for a managed one. It trades modest effort for reduced operational burden.

Related: Rehost, Refactor, Managed Service
Refactor

Redesigning an application's architecture to take full advantage of cloud characteristics such as elasticity, managed services, and decoupling. It offers the greatest long-term benefit but carries the highest cost and risk.

Related: Replatform, Microservices, Cloud-Native
Repurchase

Replacing an existing application with a different product, typically a SaaS offering, instead of migrating the original. Data export, integration, and license exit terms must be planned carefully.

Related: SaaS, The 6 Rs
Retain

A deliberate decision to keep a workload in its current environment because migration is blocked by latency, regulation, licensing, or cost. Retained workloads still need a review date.

Related: The 6 Rs, Retire
Retire

Decommissioning a workload that is no longer needed, removing it from the migration scope entirely. Retiring first reduces cost and complexity for everything that follows.

Related: Retain, Application Portfolio Assessment
Migration Wave

A grouped set of workloads scheduled to migrate together in one phase, chosen by dependency, risk, and business calendar. Waves sequence the program and give teams a repeatable unit of delivery.

Related: Dependency Mapping, Migration Strategy, Cutover
Application Portfolio Assessment

A structured inventory and analysis of all applications covering business criticality, technology stack, ownership, cost, usage, and technical debt. Its output drives the 6 Rs assignment and wave planning.

Related: The 6 Rs, Dependency Mapping, Total Cost of Ownership
Dependency Mapping

Identifying the connections between applications, databases, network flows, and users so migration order and cutover grouping respect real runtime relationships. Missed dependencies are a leading cause of failed cutovers.

Related: Migration Wave, Cutover, Application Portfolio Assessment
Total Cost of Ownership

The full lifetime cost of running a workload, including compute, storage, network egress, licensing, support, staffing, and tooling. Comparing TCO before and after migration justifies the business case.

Related: Cloud Economics, Right-Sizing, FinOps
Cloud Economics

The study of how cloud pricing models such as pay-as-you-go, reserved capacity, and spot change cost behavior compared with capital purchase. It underpins sizing, commitment, and architecture decisions.

Related: Total Cost of Ownership, Reserved Capacity, FinOps
Migration Readiness Assessment

A review of an organization's technical estate, skills, processes, security posture, and governance against cloud requirements, producing a gap list and remediation plan before migration begins.

Related: Application Portfolio Assessment, Landing Zone, Cloud Center of Excellence
Landing Zone

A pre-provisioned, governed cloud environment with accounts, networking, identity, logging, security controls, and guardrails that migrated workloads can be deployed into consistently and repeatedly.

Related: Migration Readiness Assessment, Guardrail, Infrastructure as Code
Guardrail

A policy or technical control that constrains what can be deployed in a cloud environment, such as region restrictions or required encryption. Guardrails prevent risky configurations without blocking legitimate work.

Related: Landing Zone, Policy as Code, Governance
Infrastructure as Code

Defining cloud networks, compute, and policies in version-controlled template files that tools deploy automatically. It makes environments reproducible, reviewable, and consistent across migration waves.

Related: Landing Zone, Policy as Code, Immutable Infrastructure
Policy as Code

Expressing governance rules as machine-readable definitions that are evaluated automatically during deployment. Violations are detected or blocked before resources exist, replacing manual review.

Related: Guardrail, Infrastructure as Code, Governance
Lift and Shift

An informal name for moving workloads to cloud with minimal modification, usually as virtual machines. It is a common first step that later enables optimization once workloads are stable.

Related: Rehost, Right-Sizing
Migration Factory

An industrialized team and toolchain that migrates workloads in repeatable batches using standard templates, automated runbooks, and shared roles. It trades bespoke handling for speed and consistency.

Related: Migration Wave, Runbook, Automation
Data Migration

Moving data from source systems to target cloud storage or databases while preserving integrity, completeness, and acceptable freshness. It includes extraction, transfer, transformation, loading, and reconciliation.

Related: Data Reconciliation, Change Data Capture, Schema Conversion
Change Data Capture

A technique that reads a source database's transaction log and streams only changed rows to the target. It keeps the target current during migration and shortens the final cutover window.

Related: Data Migration, Cutover, Data Reconciliation
Data Reconciliation

Comparing source and target data after transfer using row counts, checksums, and business totals to prove nothing was lost, duplicated, or corrupted. It is a required gate before cutover.

Related: Data Migration, Validation Testing, Change Data Capture
Schema Conversion

Translating database objects such as tables, indexes, procedures, and data types from a source engine's dialect to the target engine's. Incompatible constructs must be rewritten or manually remediated.

Related: Data Migration, Heterogeneous Migration
Heterogeneous Migration

A migration between different platforms or engines, for example from one database vendor to another or from one hypervisor to another. It requires conversion and typically more testing than a like-for-like move.

Related: Schema Conversion, Replatform
Cutover

The planned event when production traffic and data move from the old environment to the new one and the old system stops serving users. It is scheduled, rehearsed, and reversible.

Related: Rollback Plan, Runbook, Go-Live
Rollback Plan

A documented, tested procedure to return to the source environment if cutover fails or validation thresholds are not met. It defines triggers, decision owners, and time limits.

Related: Cutover, Validation Testing, Runbook
Runbook

A step-by-step operational procedure with commands, owners, timings, and checkpoints used to execute a migration or cutover consistently. Runbooks are rehearsed and version-controlled.

Related: Cutover, Rollback Plan, Migration Factory
Validation Testing

Post-migration checks confirming that functionality, performance, security, and data integrity meet agreed acceptance criteria. Results determine whether cutover is declared successful or rolled back.

Related: Data Reconciliation, Rollback Plan, Performance Baseline
Performance Baseline

Measured pre-migration values for latency, throughput, and resource use that serve as the reference for judging whether the migrated workload performs acceptably. It must be captured before changes begin.

Related: Validation Testing, Right-Sizing
Right-Sizing

Matching provisioned compute, memory, and storage to actual measured demand rather than copying legacy over-provisioning. It is the fastest source of post-migration cost savings.

Related: Cloud Economics, FinOps, Total Cost of Ownership
FinOps

An operating practice where finance, engineering, and business teams share accountability for cloud spend through visibility, forecasting, and continuous optimization. It makes cost a first-class engineering concern.

Related: Cloud Economics, Right-Sizing, Tagging
Tagging

Attaching structured key-value metadata to cloud resources to record owner, environment, cost center, and application. Consistent tags enable cost allocation, automation, and governance reporting.

Related: FinOps, Governance
Reserved Capacity

A purchasing commitment to use a defined amount of compute for a term in exchange for a lower rate than on-demand pricing. It suits steady workloads but creates waste if usage drops.

Related: Cloud Economics, Right-Sizing
Cloud Center of Excellence

A cross-functional team that defines cloud standards, builds shared platforms and guardrails, and coaches delivery teams. It centralizes expertise without centralizing all delivery work.

Related: Landing Zone, Guardrail, Migration Readiness Assessment
Hybrid Cloud

An environment combining on-premises or private infrastructure with public cloud, connected by secure networking and consistent identity. It is common during long migrations and for retained workloads.

Related: Retain, Landing Zone
Disaster Recovery

The capability to restore applications and data after a failure, defined by recovery time and recovery point objectives. Cloud patterns such as pilot light and warm standby reduce recovery cost and time.

Related: Hybrid Cloud, Validation Testing