Week 1

Boiler Fundamentals, Thermodynamics and Heat Transfer & Boiler Controls, Instrumentation and Safety Devices

  • Define sensible heat, latent heat, enthalpy and superheat, and calculate the heat needed to raise feedwater to saturated steam at a stated pressure.

  • Trace the Rankine cycle on a T-s diagram and label where subcooling, superheat and condenser losses occur in a boiler plant.

  • Explain conduction, convection and radiation with one boiler example each (furnace flame radiation, tube convection, wall conduction).

  • Identify the primary and secondary low-water cutout, high-pressure limit switch and safety valve on a typical packaged boiler and state the protective action of each.

  • Describe the difference between a trip, an interlock and an alarm, giving one plant example of each.

Your checkpoint

A one-page cheat sheet with the heat-addition formula, a labelled T-s sketch, and a table of five safety devices with their setpoint basis and trip action.

Week 2

Boiler Controls, Instrumentation and Safety Devices & Boiler Fundamentals, Thermodynamics and Heat Transfer

  • Explain how a flame scanner proves main flame and why a loss-of-flame signal must close the fuel valve within the stated trial-for-ignition period.

  • Sequence a normal light-off: pre-purge, pilot ignition, main flame establishment, and modulation to demand.

  • Interpret gauge glass, pressure gauge, thermometer and flow transmitter readings to judge whether the boiler is behaving normally.

  • Calculate boiler efficiency with the indirect (losses) method using dry flue gas, moisture and radiation loss terms.

  • Compare direct and indirect efficiency results and explain why they differ.

Your checkpoint

A written start-up sequence checklist of at least 12 ordered steps with the interlock condition that must be satisfied at each step, plus one worked indirect-efficiency calculation.

Week 3

Fuels, Combustion and Burners & Boiler Types, Construction and Design

  • Classify fuels by state and origin (natural gas, fuel oil grades, coal ranks, biomass) and state one handling hazard for each.

  • Define stoichiometric air, excess air, and air-fuel ratio, and calculate the theoretical air for a simple gas composition.

  • Describe the three T's of combustion and diagnose how a cold furnace or poor atomization breaks them.

  • Distinguish fire-tube, water-tube and once-through designs by heat-transfer path, response to load change and typical pressure range.

  • Sketch the pressure-part layout of a packaged fire-tube boiler and label furnace, tube sheets, shell, and steam drum space.

Your checkpoint

A two-column comparison table of fire-tube versus water-tube construction covering at least six criteria, plus a flue-gas analysis interpretation exercise (O2, CO2, CO, stack temperature) with a written diagnosis.

Week 4

Feedwater, Water Treatment and Steam Purity & Operation, Startup, Shutdown and Load Management

  • Explain the scale, corrosion and carryover mechanisms and match each to its treatment response (softening, deaeration, chemical oxygen scavenging, blowdown).

  • Describe how a deaerator removes oxygen and what happens to feedwater oxygen levels if it is bypassed.

  • Perform bottom and surface blowdown calculations and explain how blowdown controls dissolved solids.

  • Explain drum level control (single, two and three element) and why swell and shrinkage mislead a single-element system on load change.

  • Plan a controlled shutdown including post-purge, fuel isolation and cooling rate limits.

Your checkpoint

A water-treatment decision flowchart from raw water to steam drum, plus a written load-change scenario response describing the correct operator actions for a sudden 40 percent steam demand increase.

Week 5

Operation, Startup, Shutdown and Load Management & Fuels, Combustion and Burners

  • Build a cold start-up procedure from a cold, empty boiler through hydrostatic check, warm-up, and first steam, naming the warm-up rate limit and why it exists.

  • Diagnose common combustion faults from burner behaviour and flue readings: high CO, smoky flame, flame lift-off, pulsation, and high stack temperature.

  • Explain burner turndown, modulation versus on-off control, and how minimum firing rate affects cycling losses.

  • Describe emergency actions for low water, high water, tube leak, and furnace puffback, including what the operator must not do.

  • Explain how soot blowing and air/fuel ratio tuning affect efficiency and emissions.

Your checkpoint

An emergency response card for four abnormal conditions with immediate actions, required notifications, and restart conditions, plus a burner fault-diagnosis table of at least five symptoms with causes and corrective actions.

Week 6

Inspection, Maintenance and Testing & Codes, Standards, Regulations and Operator Safety

  • List the inspection items checked on the waterside and fireside during an internal inspection and state the defect each item is meant to catch.

  • Describe the preparation steps for a hydrostatic test and the acceptance criterion for holding pressure.

  • Explain the purpose and interval logic of safety valve testing and how to verify it lifts at the correct set pressure.

  • Summarize operator duties under the applicable boiler and pressure-vessel code, including log-keeping and reporting of defects.

  • Identify personal protective equipment and confined-space entry controls required for boiler internal work.

Your checkpoint

A 20-item inspection checklist organized by waterside, fireside and external, each item paired with the failure mode it detects, plus a one-page summary of the operator's legal and code obligations.

Week 7

Codes, Standards, Regulations and Operator Safety & Inspection, Maintenance and Testing

  • Explain the difference between a code requirement, a standard, and a regulation, and give one boiler example of each.

  • Describe lockout/tagout, line breaking, and hot-work permit controls for a boiler room task.

  • Outline the operator's role in an external inspection and which records must be produced.

  • Explain how water-level and pressure-relief device failures have caused historical incidents and what controls prevent recurrence.

  • State the record-retention and log requirements that apply to boiler operation in your jurisdiction.

Your checkpoint

A safety scenario write-up of one credible boiler-room incident, tracing the causal chain to at least three missed controls and the code or procedure that would have prevented each.

Week 8

Boiler Fundamentals, Thermodynamics and Heat Transfer & Boiler Types, Construction and Design & Fuels, Combustion and Burners & Feedwater, Water Treatment and Steam Purity & Boiler Controls, Instrumentation and Safety Devices & Operation, Startup, Shutdown and Load Management & Inspection, Maintenance and Testing & Codes, Standards, Regulations and Operator Safety

  • Complete a full-length timed practice exam under exam conditions and score it by domain.

  • Rank your three weakest domains by score and re-study each with targeted notes.

  • Re-derive the key formulas from memory: heat addition, excess air, blowdown, and indirect efficiency.

  • Recite the trip actions for low water, high pressure, and loss of flame without notes.

  • Review every missed practice question and write the correct reasoning in one sentence each.

Your checkpoint

A scored practice exam with a domain-by-domain error log, and a final one-page formula and setpoint summary sheet.

Milestones

Week 2: You can write the light-off sequence from memory and state the interlock satisfied at each step, and you can compute indirect efficiency without notes.

Week 4: You can explain three-element drum level control to a colleague in under two minutes and correctly predict drum level behaviour during a rapid load increase.

Week 6: You can list 15 internal inspection items with the defect each detects, and state the hydrostatic test acceptance criterion and safety valve set-pressure verification method.

Week 8: Practice exam score is at least 80 percent overall with no single domain below 70 percent; any domain below 70 percent has a written remediation note.