Annular Seal Failure in a Gravel Lens
A 6-inch PVC well is drilled to 140 feet through 70 feet of casing. The log shows a sandy gravel lens from 45 to 55 feet, a clay confining layer from 90 to 105 feet, and a confined sand at 125 feet with a static water level that rises to 30 feet. The crew tremie-grouted the annulus with a bentonite slurry mixed at about 12 percent solids. During grouting, the take dropped sharply at 50 feet and the crew added two extra bags of bentonite to 'fill the void.' The grout was pumped from the top down for the upper 20 feet after the tremie pipe plugged. After development, the water is persistently turbid and contains fine sand; the owner wants to pump-test and turn it over. A nearby older well has iron bacteria and a septic system 80 feet upslope.
1. Evaluate the grouting operation. Which parts are defective, and why does the 45-55 ft gravel lens make the defects more serious?
Read the worked answer
The annular seal must be continuous and placed from the bottom of the casing upward by tremie so the grout displaces water and fills the space without bridging. Pumping the upper 20 feet from the top down is defective because it can trap water, create voids, and leave the annulus unsealed near the surface. Adding extra bags at a loss zone is also not a reliable fix: the bentonite may bridge at the gravel lens rather than seal it, and the sharp loss at 50 feet suggests the slurry was entering the permeable lens or a void. A 12 percent bentonite slurry may be too thin and vulnerable to dilution or loss in that formation. The gravel lens is the critical path because it is permeable and lies behind the casing; if the annulus is not sealed across it, surface water and shallow contamination can move down the outside of the casing into the lens and potentially deeper. The correct response is staged grouting with a proper mix, a packer or tremie placed below the loss zone, and verification by grout volume and downhole inspection-not just topping off from the surface.
2. The water is persistently turbid with fine sand after development. What are the likely causes, and what test sequence should determine whether the well is acceptable?
Read the worked answer
Fine sand and persistent turbidity can come from the confined sand at 125 feet, from the gravel lens if the well screen or intake is open to it, from inadequate development, or from grout and formation fines disturbed during construction. The history of lost grout and top-down placement also raises the possibility that the annulus is not sealed and that fine material is migrating along the borehole. Before accepting the well, measure turbidity and sand content with an Imhoff cone at a controlled pumping rate, record drawdown and specific capacity, and observe whether sand production decreases or continues. Sample for bacteria and nitrate because the nearby septic system and old well are potential contamination sources. A downhole camera and verification of grout volume can help distinguish a formation problem from a seal defect. If sand production continues at the design rate, reduce the pumping rate, redevelop, or install sand control; do not turn the well over until turbidity and sand are stable. If the annular seal is defective, repair or abandon the well rather than pump-testing it as complete.
3. What corrective options exist, and what is the correct sequence before the owner uses the well?
Read the worked answer
The first step is diagnosis, not treatment. Confirm whether the turbidity is formation sand, grout fines, or a seal failure. If the annulus is bridged above the gravel lens, attempt re-grouting through a packer or tremie placed below the bridge, using a mix designed for the formation and enough volume to fill the annulus continuously. If the annulus cannot be sealed, options include reaming and relining the well, installing an approved liner with a proper seal, or abandoning and replacing the well. After any repair, disinfect the well, redevelop it, and retest for bacteria, nitrate, turbidity, and sand content. Only then should a pump test be run and the well turned over. Document the grout volumes, repair method, and test results. The owner should not use the well while the seal is suspect because contamination from the upslope septic system could be drawn toward the borehole.