567 IAC Chapter 49
The Iowa administrative rule chapter setting technical standards for constructing, reconstructing, and plugging water wells, including location, casing, grouting, disinfection, and closure requirements.
Certified water well contractor
A DNR-issued credential required before a person may construct, reconstruct, or plug a water well; work must be done by the certified contractor or under that contractor's direct supervision.
Well construction permit
Site-specific DNR authorization obtained before drilling begins; it identifies the approved well location and intended use and must be available at the site during construction.
Driller's well log
Completion report filed with the Iowa DNR for each well, recording total depth, formations, casing and screen intervals, grout placement, water levels, and yield.
Isolation distance measurement
The horizontal distance from the well casing to the nearest edge of the potential contamination source, expressed in feet as required by Iowa well location rules.
Septic tank setback
Iowa requires a minimum horizontal separation of 50 feet between a water well casing and a septic tank or a sanitary sewer line serving the property.
Leach field separation
A soil absorption field, manure storage, feedlot, barnyard, or fuel storage must generally be at least 100 feet from the well casing under Iowa rules.
Landfill separation distance
Sanitary landfills, sewage lagoons, and wastewater land-application areas carry the largest required setback from a well, roughly 200 feet in Iowa.
Hollow-stem auger drilling
A continuous-flight auger with a hollow center that allows sampling and well installation in unconsolidated glacial drift; limited by boulders, deep holes, and artesian flow.
Mud rotary drilling
Circulating bentonite or polymer fluid removes cuttings and holds the borehole open; suited to deep sand, gravel, and bedrock but can plug permeable producing zones.
Iowa alluvial aquifer
Sand and gravel deposited in modern river valleys; shallow, high yielding, and highly vulnerable to surface contamination, so casing and annular grout must be tight.
Paleozoic bedrock aquifer
Iowa's limestone, dolomite, and sandstone aquifers, including the Jordan and St. Peter formations, which supply most deep bedrock wells through grouted casing and open boreholes.
Neat cement grout
Portland cement and water mixed at roughly no more than six gallons of water per sack, placed in the annular space to form a low-permeability sanitary seal around the casing.
Tremie grout placement
Pumping grout through a pipe kept submerged in the rising grout column, sealing the annulus from the bottom upward without voids or bridging in the seal.
Two-inch annular clearance
The minimum radial space between casing and borehole wall in typical practice so a continuous, uniform grout column can be placed along the full casing length.
Well screen slot size
Chosen from sieve analysis of the formation sample so the aquifer is retained while water enters; slots too large pass sand, slots too small throttle yield.
Well development
Surging, jetting, bailing, airlifting, or overpumping after drilling that removes mud and fines from the screen and gravel pack until discharge runs clear.
Shock chlorination
Treating a new or repaired well with a strong chlorine solution, commonly 50 to 100 mg/L, held 12 to 24 hours and then pumped to waste before sampling.
Bacteriological sample hold time
A coliform sample must reach the certified laboratory within about 30 hours of collection, kept chilled in a sterile bottle, or the result is invalid.
Zero coliform standard
A new or repaired well is satisfactory only when total coliform and E. coli are both absent; any detection requires re-disinfection, inspection, and retesting.
Pitless adapter
A watertight casing fitting that carries the discharge line out below the frost line, allowing the well to be sealed at the surface without a pit.
Vermin-proof well cap
An approved cap with a downward-facing screened vent that seals the casing top against insects, rodents, and surface water while allowing pressure equalization.
Casing height above grade
Iowa requires the well casing to project at least 12 inches above finished grade, with the surrounding ground mounded so runoff drains away from the wellhead.
Pump setting depth
Determined from static and pumping water levels, keeping the intake above the screen and well bottom to avoid sand entry and cavitation during drawdown.
Abandoned well definition
A well that is no longer used, is unusable, or is not maintained in a sanitary condition; Iowa law requires it be plugged by a certified contractor to protect groundwater.
Bottom-up plugging
Sealing method using a tremie line to fill the well with cement or bentonite grout from total depth upward, preventing bridging and gaps in the seal.
Casing cutoff at plugging
When a well is plugged, the casing is cut off below final grade, typically about three feet, the remaining stub filled with grout, and topsoil restored.
Well plugging report
Document filed with the Iowa DNR after closure that records the plugging method, sealing materials and volumes, well depth, and date of the work.
Iowa One Call notice
Excavators must contact 811 at least 48 hours before digging so buried utilities are located and marked before the drill rig breaks ground.
Five-foot trench rule
OSHA requires a protective system such as sloping, shoring, or a trench box for any excavation reaching five feet in depth or more.
Spoil pile setback
Excavated material, equipment, and tools must be kept at least two feet back from the trench edge to reduce surcharge loading and collapse risk.
Drilling discharge containment
Mud, cuttings, and chlorinated development water must be contained and never released to waters of the state, storm sewers, or roadside ditches.