Iowa Statutes and Rules: Well Construction and Contractor Certification

  • Iowa Code chapter 455B gives the DNR authority over water wells; the technical standards sit in 567 IAC chapter 49 (Water Well Construction and Closure), covering permits, location, casing, grout, disinfection, and plugging.

  • Construction, reconstruction, and plugging of a well may be performed only by a DNR-certified water well contractor, or by workers under that contractor's direct on-site supervision.

  • A site-specific construction permit must be obtained from the DNR before drilling starts; the permit fixes the approved location and use and must be available at the site while work proceeds.

  • A public water supply well needs a separate DNR construction permit under 567 IAC chapter 43 in addition to the nonpublic well authorization.

  • Every well is logged: total depth, formation changes, casing and screen intervals, grout method and volume, static water level, and yield, then submitted to the DNR as the well construction report.

  • Closure work is documented the same way; the plugging report records method, materials, seal depths, and date, and the owner keeps a copy.

  • Enforcement tools include suspension or revocation of certification and administrative penalties; drilling or plugging without certification is a violation of chapter 455B.

  • Where a county board of health or local ordinance sets a stricter siting or construction standard than the state rule, the stricter requirement controls.

Quick reference

Well Siting, Isolation Distances, and Source Water Protection

  • Isolation distances are horizontal, measured from the well casing to the nearest point of the contaminant source, not from the property line or the pump house.

  • 50 feet: minimum separation from a septic tank and from sanitary sewer lines.

  • 100 feet: minimum separation from a soil absorption (leach) field, manure storage, feedlot or barnyard, and fuel or pesticide storage.

  • 200 feet: minimum separation from a sanitary landfill, wastewater lagoon, or wastewater land-application area.

  • Avoid surface water, sinkholes, and drainageways; where the site lies in a mapped floodplain, the casing must finish above the 100-year flood elevation.

  • Put the well upgradient of contaminant sources on ground that falls away, then grade and mound the surface so runoff leaves the wellhead rather than ponding at it.

  • In northeast Iowa karst limestone, solution openings and sinkholes are direct conduits to groundwater: keep the well away from them and grout casing into sound bedrock.

  • Before fixing the site, review the DNR source water assessment and, for community systems, the wellhead protection area; note nearby underground tanks, animal feeding operations, and chemical storage.

Quick reference

Drilling Methods, Borehole Construction, and Subsurface Geology

  • Formation drives method choice: hollow-stem auger for unconsolidated glacial drift, mud rotary for deep sand, gravel and bedrock, air rotary or cable tool for cavernous limestone and boulder zones.

  • Drilling fluid must hold the borehole open and lift cuttings, but excess mud weight invades the producing sand and plugs it, cutting specific capacity.

  • Iowa sequence top-down: Pleistocene glacial till and outwash, alluvial sand and gravel in modern river valleys, Paleozoic limestone/dolomite/sandstone aquifers, and Precambrian granite and quartzite in the northwest.

  • Casing is set through the unconsolidated zone and seated into a competent confining layer or bedrock; site geology, not a fixed statewide depth, sets the casing point.

  • Identify zones of poor-quality water (high sulfate, iron, brackish) and grout them off so they cannot mix with the producing aquifer.

  • Borehole diameter must leave adequate annular clearance, typically at least 2 inches, so a continuous grout column can be placed around the casing.

  • Artesian or flowing conditions must be controlled with weighted fluid or casing before grouting; uncontrolled flow dilutes and displaces the seal.

  • Record first water struck, static level, and lost-circulation zones: they determine screen placement, seal depth, and where the pump can safely sit.

Quick reference

Casing, Screens, and Annular Space Sealing/Grouting

  • Casing must be new, watertight, and approved for potable water (NSF/ANSI 61 PVC or steel) with joints that seal: flush thread, welded, or properly coupled.

  • The casing top finishes at least 12 inches above finished grade, the annulus is grouted to the surface, and the ground is mounded to shed water away.

  • Acceptable annular seal materials are neat cement grout (cement plus no more than about 6 gallons of water per sack), bentonite grout slurry, or bentonite chips; drill cuttings, soil, and sand are not acceptable in the seal interval.

  • Grout is placed from the bottom up with a tremie pipe or positive-displacement pump so the discharge stays buried in rising grout; never dump grout from the top of the annulus.

  • The grout column must be continuous over the full sealed length; if the annulus caves, ream the hole rather than allowing a bridge that leaves an open channel.

  • Screen slot size is selected from sieve analysis of the formation sample and matched with a graded gravel pack in alluvial sand and gravel.

  • The casing-to-screen connection must be watertight with a reducer or packer so formation material cannot enter above the screen.

  • In bedrock wells an open borehole may serve as the intake, but the casing must be grouted into competent rock above the water-producing fractures.

  • Centralizers keep the casing centered in the borehole so the grout thickness is uniform on all sides.

Quick reference

Well Development, Disinfection, and Water Quality Testing

  • Development continues until the discharge runs clear; methods include surging, jetting, bailing, airlift, overpumping, and brushing to break the mud cake.

  • Over-development of a fine-sand aquifer can pull fines permanently; match development energy to the formation gradation.

  • Disinfect after construction, repair, or pump replacement with a chlorine solution strong enough to leave a measurable residual, commonly 50 to 100 mg/L, held 12 to 24 hours.

  • Chlorine demand rises with turbidity, iron, and organics, so verify the residual by test rather than assuming the calculated dose was effective.

  • Pump to waste until the chlorine residual is gone before sampling, and draw the sample at the wellhead tap ahead of softeners, filters, and treatment.

  • Use a sterile bottle, do not rinse it, chill the sample, and deliver it to a certified laboratory within about 30 hours, with well identification and collection date recorded.

  • Total coliform present means unsatisfactory: re-disinfect, inspect the cap and grout for defects, and retest. E. coli present is an immediate health hazard requiring a boil-water advisory or treatment.

  • Iowa new-well testing covers coliform bacteria and nitrate; results go to the owner, and to the DNR for public water systems.

Quick reference

Pump Installation, Pitless Adapters, and Wellhead Completion

  • A pitless adapter is a watertight casing fitting that carries the discharge line out below frost depth, roughly 3 to 5 feet in Iowa, so the well can be sealed at the surface without a pit.

  • Pitless units must be approved for potable water and matched to casing material: welded or strapped body on steel casing, saddle-type adapter on plastic casing.

  • The well cap must be vermin-proof and vented with a screened, downward-facing vent; a loose, cracked, or missing cap is a direct contamination pathway.

  • Set the pump above the screen and off the bottom, checked against static level, pumping level, and specific capacity, to avoid sand and cavitation.

  • Install a check valve directly above the pump and set pressure-tank precharge about 2 psi below cut-in, for example 28 psi on a 30/50 switch.

  • Size wire and breaker from motor amps, voltage drop over the setting depth, and NEC rules; bond the casing and ground the circuit.

  • Verify the completed installation by pump output, drawdown, cut-in and cut-out pressures, and absence of air or sediment in the discharge.

Quick reference

Abandoned Well Identification and Plugging

  • A well is abandoned when it is no longer used, is unusable, or is not maintained in a sanitary condition; Iowa law requires plugging to protect the aquifer.

  • Plugging is performed by a certified well contractor, usually after removing the pump, drop pipe, and any obstructions from the borehole.

  • The preferred seal is neat cement or bentonite grout placed by tremie from total depth upward; sand or gravel may fill only below the seal and never across a confining layer.

  • Steel casing that cannot be pulled is perforated, ripped, or cut off and the surrounding space grouted so no open annular channel is left behind.

  • Casing is cut off below final grade, typically about 3 feet, the remaining stub filled with grout, and the site restored and graded to drain.

  • Flowing or artesian wells require the flow to be controlled before grouting; a packer and heavier grout keep the seal in place against pressure.

  • File the plugging report with the DNR recording location, depth, method, materials and quantities, and date, and give the owner a copy.

  • An abandoned well may never be converted to a drainage or waste-disposal hole; that creates a direct, uncontrolled path to groundwater.

Quick reference

Jobsite Safety, Equipment Operation, and Discharge/Compliance

  • Notify Iowa One Call by dialing 811 at least 48 hours before excavation, wait for markings, and hand-expose utilities inside the marked tolerance zone.

  • OSHA 1926 Subpart P: a protective system is required at 5 feet of depth, spoil and equipment stay at least 2 feet back from the edge, and a ladder is placed within 25 feet of travel in trenches 4 feet or deeper.

  • A competent person inspects the excavation daily and after rain; standing water or tension cracks mean stop work until it is made safe.

  • Rig setup requires level, stable ground and fully deployed outriggers, with OSHA power-line clearance maintained (10 feet for lines up to 50 kV, more at higher voltages).

  • Stay clear of rotating augers, drive shafts, and cathead lines: no loose clothing, no hands near the kelly, and lockout before servicing.

  • Drilling mud, cuttings, and development water are contained, not released to waters of the state, storm sewers, or roadside ditches; use a settling pit or frac tank.

  • Land application of drilling water needs landowner permission, a vegetated buffer, and no runoff to streams; a construction stormwater NPDES permit is required where an acre or more is disturbed.

  • Fuel and chemicals are stored in secondary containment with a spill kit on site, and releases are reported to the DNR promptly.

  • Chlorinated development or disinfection water is dechlorinated or land-applied rather than dumped, because high chlorine is toxic to aquatic life.