- Water supply fixture unit
- A dimensionless value assigned to each fixture representing its probable demand on the water supply; the total WSFU is converted to gpm using the demand table for sizing.
- Drainage fixture unit
- A value assigned to each fixture representing its probable discharge to the drainage system; the total DFU and slope determine the required drain size.
- Trap seal depth
- The vertical distance between the trap weir and the top of the trap dip, required to be 2 to 4 inches to prevent sewer gas from entering the building.
- Air gap
- The unobstructed vertical distance through free atmosphere between a potable water outlet and the flood level rim of a receptacle; the highest level of backflow protection.
- Reduced pressure principle assembly
- A testable backflow preventer with two independently acting check valves and a relief valve; it protects against both backsiphonage and backpressure at high-hazard connections.
- Pressure vacuum breaker
- A testable backflow preventer that protects against backsiphonage only; it must be installed at least 12 inches above the highest downstream outlet.
- Thermal expansion tank
- A tank installed on a closed potable water system to absorb the volume increase caused by heating water, preventing excess pressure and T&P valve discharge.
- Temperature and pressure relief valve
- A safety valve on a water heater that opens at a set temperature and pressure to prevent tank rupture; its discharge pipe must be full size and unobstructed.
- Combustion air openings
- Openings that supply air to fuel-burning appliances; the outdoor air method requires 1 square inch per 4,000 Btu/h for vertical ducts.
- Sediment trap
- A fitting installed at the appliance connection to collect dirt and debris before it reaches the gas controls; it must be installed per the manufacturer's instructions.
- Developed length
- The total length of pipe measured along the centerline, including fittings and valves; if unknown, add about 50 percent to the measured run for sizing.
- Static pressure loss per foot
- The pressure lost to elevation, approximately 0.433 psi per foot of rise, or 1 psi per 2.31 feet of vertical height.
- Riser diagram
- A schematic drawing showing the vertical arrangement of the plumbing system, including pipe sizes, fixture connections, vents, and the building drain.
- Isometric drawing
- A three-dimensional drawing used to interpret offsets, changes in elevation, and the route of piping through the building.
- Schedule of values
- A document that allocates the contract sum to work items and serves as the basis for progress payments during construction.
- Retainage
- A percentage of each progress payment withheld by the owner until final acceptance and completion of the punch list, commonly 5 to 10 percent.
- Change order
- A written document that modifies the scope, price, or schedule of the contract; it must be signed by the owner or representative before work proceeds.
- Main vent through roof
- The principal vent that extends through the roof to admit air to the drainage system; it must extend at least 6 inches above the roof.
- Air admittance valve
- A one-way valve that admits air into the drainage system to protect trap seals; it may replace certain vents where permitted by the adopted code.
- Grease interceptor
- A device installed on kitchen drainage to trap fats, oils, and grease before they reach the sewer; it must be accessible for cleaning.
- Indirect waste receptor
- A receptacle that receives waste through an air gap or air break from fixtures such as ice machines and sterilizers, preventing backflow to the fixture.
- Secondary roof drainage
- Overflow scuppers or drains sized for the design storm that provide a backup path for rainwater when the primary roof drains are blocked.
- Medical gas certification
- The requirement that medical gas piping be installed by a certified installer and verified by an independent third party before the system is placed in use.
- Emergency eyewash station
- A fixture that delivers tepid flushing fluid to the eyes and body within about 10 seconds of travel from a hazard, per the adopted safety standard.
- Water supply demand curve
- A table or curve that converts the total water supply fixture units to the probable peak demand in gallons per minute for pipe sizing.
- Dielectric union
- A fitting that separates dissimilar metals, such as copper and steel, to prevent galvanic corrosion at the connection in a piping system.
- Cleanout
- An accessible fitting with a removable plug that allows the drainage system to be cleared; required at the base of stacks and at changes of direction.
- Rough-in inspection
- The inspection of piping and venting installed in walls and floors before concealment; approval is required before covering the work.
- Alternate method approval
- The authority having jurisdiction may approve a material or method that is not specifically listed in the code if it is equivalent in performance and safety.
- Flushometer valve pressure
- Flushometer valves typically require a minimum flowing pressure of about 15 to 20 psi at the fixture to operate properly, per the manufacturer.
- Fixture clearance
- The minimum space around a fixture, such as 15 inches from a water closet centerline to a side wall and 30 inches of clear space in front.
- Punch list
- A list of incomplete or defective work prepared at substantial completion; final payment is typically released after the items are corrected.