NBOPE/IAPMO Master Plumber study materials
NBOPE/IAPMO Master Plumber study resources

NBOPE/IAPMO Master Plumber study plan

NBOPE/IAPMO Master Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Sanitary drainage, venting, and traps & Plumbing fixtures, fixture fittings, and fixture unit calculations

  • Draw the full DWV stack for a two-story house from memory, labeling every trap, vent, and cleanout, then verify each against code minimums

  • Calculate fixture units for a 3-bath dwelling using a fixture-unit table and size the building drain and building sewer

  • Explain the difference between a common vent, a wet vent, and a circuit vent by writing a 150-word comparison with a sketch for each

  • List the vertical and horizontal trap-arm distance limits and the vent-termination clearances, and recite them without notes

Your checkpoint

A one-page hand-drawn DWV isometric with a fixture-unit tally and sized drain/vent schedule, self-graded against code tables

Week 2

Sanitary drainage, venting, and traps & Water supply and distribution system design, sizing, and materials

  • Size a cold and hot water distribution system for a 3-bath home using the demand-weight method, showing pipe sizes at each branch and main

  • Compute developed length and pressure loss for the longest run, and confirm residual pressure at the topmost fixture meets the minimum

  • Identify the allowable materials and joining methods for water distribution and drainage, and note where each is restricted

  • Diagnose five given venting errors (e.g., crown-vented fixture drain, flat vent, oversized vent) and prescribe the correction

Your checkpoint

A water-supply sizing worksheet with demand weights, friction loss, and residual pressure showing pass/fail at the farthest fixture

Week 3

Water supply and distribution system design, sizing, and materials & Backflow prevention, cross-connection control, and potable water protection

  • Build a table of the five backflow-prevention assemblies/devices, their application, and the test procedure for each

  • Identify every cross-connection hazard in a supplied commercial plan set and specify the required protection for each

  • Design a reduced-pressure-zone installation with correct clearances, drainage, and freeze protection details

  • Explain thermal expansion control and its interaction with backflow devices on a closed system

Your checkpoint

A cross-connection survey of a sample commercial building listing 10 hazards, the required device, and the code basis for each

Week 4

Water heaters, temperature control, and thermal expansion & Fuel gas piping, venting, and combustion air

  • Size a water heater and size the relief valve, discharge pipe, and expansion tank for a given occupancy load

  • Calculate combustion air for a mechanical room by both the indoor and outdoor air methods and compare results

  • Size a gas piping system by the longest-length method and by the branch-length method, and explain when each is used

  • Identify the venting category of a given appliance and specify the vent connector, termination, and clearances

  • Explain scald-prevention requirements and specify tempering or mixing-valve protection at fixtures

Your checkpoint

A combined water-heater and gas-piping sizing sheet for one sample building, with combustion-air calculation and relief-valve discharge detail

Week 5

Storm drainage and special waste systems & Health care, medical, and specialty plumbing systems

  • Size roof drains, leaders, and storm building drains for a given roof area and rainfall rate, and check the storm drain for surcharge and overflow provisions

  • Design a secondary/overflow drainage path and specify where it is required

  • List the special waste streams (grease, acid, chemical, medical) and the treatment or dilution each requires

  • Describe the medical-gas and health-care plumbing requirements: zone valves, vacuum systems, and fixture clearances

  • Trace an indirect waste receptor installation and verify the air gap and air break dimensions

Your checkpoint

A storm-drainage sizing calculation for a 12,000 sq ft roof with a labeled plan showing primary and secondary drainage

Week 6

General plumbing regulations, code administration, permits, and inspections & Plan reading, isometric interpretation, and system layout & Business management, estimating, bidding, and project administration

  • Outline the permit-to-final-inspection sequence for a commercial project, naming the inspections and who calls for each

  • Read a supplied plan set and produce a takeoff of fixtures, pipe lengths, and fittings for one floor

  • Build a bid from the takeoff: labor hours, material markup, overhead, and profit, with a stated contingency

  • Identify the licensing, insurance, and contract provisions a master plumber must verify before signing

  • Answer 40 practice questions across these domains and log every miss with its code citation

Your checkpoint

A complete bid package for one floor: takeoff, labor and material pricing, and a one-page scope-and-exclusions sheet

Week 7

Sanitary drainage, venting, and traps & Water supply and distribution system design, sizing, and materials & Plumbing fixtures, fixture fittings, and fixture unit calculations & Water heaters, temperature control, and thermal expansion & Fuel gas piping, venting, and combustion air & Backflow prevention, cross-connection control, and potable water protection

  • Complete a 100-question timed practice exam covering all domains and score it by domain

  • Re-study every missed item for the three weakest domains and write the governing rule for each

  • Recompute two sizing problems (water supply and gas) under time pressure without reference tables

  • Recite the key numeric limits (trap-arm distances, vent clearances, relief-valve settings, fixture-unit values) from memory in a self-quiz

Your checkpoint

A scored 100-question practice exam with a per-domain error log and a prioritized re-study list

Week 8

General plumbing regulations, code administration, permits, and inspections & Sanitary drainage, venting, and traps & Plumbing fixtures, fixture fittings, and fixture unit calculations & Business management, estimating, bidding, and project administration

  • Take two full-length timed practice exams and record the score trend

  • Review the error log and close every remaining gap in the weakest two domains

  • Rehearse the code-administration and business-management items, which are commonly understudied

  • Write a one-page exam-day plan covering pacing, flagging strategy, and reference-tab organization

Your checkpoint

Two completed timed exams with a final score report and a written exam-day pacing plan

Milestones

Week 2: Can size a full DWV and water-supply system for a dwelling unaided in under 45 minutes with correct code citations

Week 4: Scores 70% or better on a self-made 30-question quiz covering water heaters, gas piping, and combustion air

Week 6: Produces a complete takeoff and bid from a plan set, and explains the permit and inspection sequence without notes

Week 8: Scores 75% or better on two consecutive full-length timed exams, with no domain below 60%