ICGB · Keep the key ideas within reach.

Quick reference

Define

  • A project charter states the business case, problem statement, goal statement, scope, team, and preliminary timeline; it authorizes the project and is approved by the sponsor.

  • SMART goal statements specify metric, baseline, target, and deadline; a defect-reduction goal is written as direction (decrease), metric, baseline, target, and date.

  • Voice of the customer (VOC) is translated into measurable requirements via a Kano analysis or a CTQ (critical-to-quality) tree, which links needs to measurable Y characteristics.

  • SIPOC maps Suppliers, Inputs, Process, Outputs, Customers at a high level; it defines process boundaries without detailing internal steps.

  • Kano model classesifies requirements as must-be, performance, attractive, indifferent, or reverse; must-be absence causes dissatisfaction but presence does not delight.

  • A problem statement is measurable, time-bounded, and free of cause or solution language; it states gap, location, magnitude, and impact.

  • Stakeholder analysis rates each party by influence and interest to set communication frequency and escalation paths.

  • Cost of poor quality (COPQ) sums internal failure, external failure, appraisal, and prevention costs; prevention and appraisal are control costs, failures are the cost of nonconformance.

  • A business case quantifies the financial and strategic justification; projected savings must be validated by Finance before closure.

Quick reference

Measure

  • Measurement system analysis (MSA) for continuous data uses Gage R&R; AIAG guidance treats %GRR under 10% as acceptable, 10-30% as conditionally acceptable, and over 30% as unacceptable.

  • Bias is the difference between the observed average and the reference value; linearity is how bias changes across the measurement range; stability is variation over time.

  • For attribute agreement, kappa above 0.75 indicates good agreement, 0.40-0.75 fair, below 0.40 poor; within-appraiser agreement and appraiser-to-standard agreement are reported separately.

  • Process capability: Cp = (USL - LSL) / (6 sigma); Cpk = min[(USL - mean), (mean - LSL)] / (3 sigma). Cpk accounts for centering, Cp does not.

  • Ppk uses the overall sample standard deviation; Cpk uses within-subgroup sigma estimated from R-bar/d2 or pooled standard deviation.

  • For non-normal data, use a transformation (Box-Cox, Johnson) or a non-normal capability index such as Ppk from a fitted distribution before reporting capability.

  • DPMO = (defects / (units x opportunities)) x 1,000,000; yield = e^(-DPU) for the Poisson-based rolled throughput yield model.

  • Rolled throughput yield (RTY) is the product of each step's first-pass yield; it exposes hidden factory losses that final inspection yield masks.

  • Data types: continuous (variable) data supports X-bar/R, X-bar/S, and I-MR charts; discrete (attribute) data supports p, np, c, and u charts.

Quick reference

Analyze

  • Hypothesis test logic: H0 assumes no difference or no effect; the p-value is the probability of data at least as extreme given H0; reject H0 when p < alpha.

  • Type I error (alpha) rejects a true H0; Type II error (beta) fails to reject a false H0; power = 1 - beta and increases with sample size and effect size.

  • Parametric test selection: 2-sample t for two means, paired t for paired data, ANOVA for three or more means, chi-square for association between categorical variables.

  • ANOVA F test compares between-group variation to within-group variation; a significant result requires post-hoc pairwise comparison (Tukey) to locate differences.

  • Nonparametric alternatives: Mann-Whitney for two independent groups, Wilcoxon signed-rank for paired data, Kruskal-Wallis for three or more groups.

  • Correlation coefficient r measures linear association only; regression R-squared is the proportion of variation explained; neither establishes causation.

  • Multi-Vari analysis stratifies variation by within-piece, piece-to-piece, and time-to-time sources to narrow the search for dominant causes.

  • A cause-and-effect (fishbone) diagram organizes suspected causes into Man, Machine, Material, Method, Measurement, and Environment categories.

  • FMEA scores severity, occurrence, and detection on 1-10 scales; RPN = S x O x D, and high severity items are addressed regardless of RPN.

Quick reference

Improve

  • DOE terminology: factor is an input variable, level is a setting, response is the measured output; a full factorial with k factors at 2 levels requires 2^k runs.

  • Randomization protects against nuisance variables and time-order effects; blocking isolates known sources of variation; replication estimates pure error.

  • Resolution III designs main effects are confounded with two-factor interactions; Resolution IV main effects are clear but two-factor interactions are confounded with each other; Resolution V two-factor interactions are clear.

  • A screening design (fractional factorial or Plackett-Burman) identifies vital few factors before optimization; steepest ascent or descent moves toward the optimum region.

  • Response surface methodology (central composite or Box-Behnken) fits quadratic models to locate optimum factor settings.

  • Lean tools: 5S workplace organization, value stream mapping to separate value-added from non-value-added steps, kanban pull, and poka-yoke error proofing.

  • SMED reduces changeover time by converting internal setup (machine stopped) to external setup (machine running).

  • Kaizen events are short, focused improvement bursts; PDCA (Plan-Do-Check-Act) is the iterative improvement cycle.

  • Pilot the improvement on a limited scale and confirm results with a hypothesis test or control chart before full deployment.

Quick reference

Control

  • Control plan elements: process step, characteristic, specification, measurement method, sample size and frequency, control method, and reaction plan.

  • Control chart selection: continuous data uses I-MR (individuals), X-bar/R (small subgroups), or X-bar/S (larger subgroups); attribute data uses p, np, c, or u.

  • A process is in statistical control when all points fall within control limits with no nonrandom patterns; control limits come from process data, specification limits come from the customer.

  • Western Electric rules flag special cause: one point beyond 3 sigma, 8 or 9 consecutive points on one side of centerline, 6 consecutive trending points, and 2 of 3 points beyond 2 sigma.

  • Cp and Cpk describe capability, not control; a process can be capable but out of control or in control but incapable.

  • Standardization sustains gains via documented standard work, updated procedures, training records, and mistake-proofing devices.

  • A response plan defines the action and owner when a control chart signals special cause; the operator's rule is to stop, contain, and escalate.

  • A project is closed only after the control plan is transferred to the process owner and the financial benefit is verified.

Quick reference

Cross-Domain Reference

  • DMAIC sequence: Define the problem and charter, Measure baseline and validate the measurement system, Analyze root causes, Improve with verified solutions, Control with monitoring and standard work.

  • Project tollgates require deliverable review by a champion or sponsor; a failed gate returns the team to the prior phase rather than advancing.

  • The Y = f(X) model treats the output Y as a function of input X variables; Measure quantifies Y, Analyze identifies vital X, Improve optimizes X, Control monitors X and Y.

  • Sample size for a mean test depends on effect size, sigma, alpha, and power; doubling the detectable effect size roughly quarters the required sample size.

  • Continuous data generally permits smaller samples than attribute data to detect the same effect; prefer measuring a continuous characteristic when feasible.

  • A root cause is verified by turning the suspected cause on and off and observing the response, not by consensus alone.

  • A common exam trap: confusing Cp with Cpk, control limits with specification limits, and RPN with a measure of severity alone.

Quick reference

Exam Strategy and Terminology

  • The ICGB exam is multiple-choice; questions often test which tool applies to a stated data type or phase rather than computation.

  • When a question states a data type, first classify continuous versus discrete, then select the matching chart or test.

  • When a question gives USL, LSL, mean, and sigma, compute Cpk; if only Cp is asked, centering is irrelevant.

  • When a question mentions appraiser variation or repeatability and reproducibility, the answer is MSA Gage R&R.

  • When a question asks how to sustain a gain, the answer is a control plan, standard work, or poka-yoke, not additional inspection.

  • When a question asks for the first step in Analyze, the answer is to verify the measurement system or stratify the data, not to run a regression.

  • When a question asks about causation from observational data, the answer is that correlation does not establish causation.

  • When a question asks which design screens many factors, the answer is a fractional factorial or Plackett-Burman design.

  • When a question asks about a signal on a control chart, the answer is to investigate special cause and follow the reaction plan.

Quick reference

Formulas and Numbers

  • Cp = (USL - LSL) / 6 sigma; Cpk = min(USL - mean, mean - LSL) / 3 sigma.

  • DPMO = defects / (units x opportunities) x 1,000,000; sigma level = 0.8406 + sqrt(29.37 - 2.221 x ln(DPMO)) approximately.

  • RTY = product of step yields; DPU = defects / units; yield = e^(-DPU).

  • RPN = Severity x Occurrence x Detection, each rated 1-10.

  • Gage R&R %GRR = (GRR variation / total variation) x 100; under 10% acceptable, 10-30% conditional, over 30% unacceptable.

  • Kappa = (Po - Pe) / (1 - Pe), where Po is observed agreement and Pe is chance agreement.

  • Full factorial 2^k runs; Resolution III, IV, and V describe confounding patterns.

  • Power = 1 - beta; increasing sample size, effect size, or alpha increases power.

  • Control limits are typically mean +/- 3 sigma; specification limits are set by the customer or design.

Quick reference

Common Pitfalls

  • Do not confuse control limits (from process variation) with specification limits (from requirements).

  • Do not report Cp when the process is off-center; report Cpk or Ppk.

  • Do not use an X-bar/R chart for individual measurements; use an I-MR chart.

  • Do not use a p chart for count data with a constant sample size; np, c, or u may apply.

  • Do not claim a cause from correlation; verify with a designed experiment or a turn-on/turn-off test.

  • Do not skip MSA before capability analysis; a bad measurement system invalidates both.

  • Do not treat a high RPN as the only FMEA priority; high severity items are addressed regardless of RPN.

  • Do not close a project without a control plan and verified financial benefit.

  • Do not confuse Type I and Type II errors; alpha is the producer's risk, beta is the consumer's risk.

Quick reference

Tool Selection by Phase

  • Define: charter, VOC, CTQ tree, SIPOC, stakeholder analysis, Kano model, COPQ.

  • Measure: data collection plan, MSA Gage R&R, capability analysis (Cp, Cpk, Ppk), DPMO, RTY, control chart baseline.

  • Analyze: hypothesis tests (t, ANOVA, chi-square), regression, multi-Vari, fishbone, FMEA, Pareto analysis.

  • Improve: DOE (full factorial, fractional factorial, response surface), lean tools (5S, VSM, SMED, poka-yoke), kaizen, PDCA.

  • Control: control plan, control charts, standard work, mistake-proofing, response plan, project closure.

  • Pareto analysis applies the 80/20 rule to prioritize the vital few causes.

  • A run chart detects trends and shifts before control limits are established.

Quick reference

Statistical Concepts

  • Central limit theorem: sample means approach normality as sample size grows, enabling parametric tests on non-normal populations.

  • Confidence interval width decreases as sample size increases and as variability decreases; a 95% interval excludes the true mean 5% of the time.

  • A p-value is not the probability that H0 is true; it is the probability of the observed data given H0.

  • Statistical significance does not imply practical significance; compare effect size to the CTQ requirement.

  • Randomization, replication, and blocking are the three pillars of experimental design.

  • A confounded effect cannot be separated from the variable it is aliased with without additional runs.

  • Normal probability plots assess normality; a straight line indicates a normal distribution.

Quick reference

Lean and Process Basics

  • The seven wastes: overproduction, waiting, transport, overprocessing, inventory, motion, and defects.

  • Takt time = available production time / customer demand.

  • Little's Law: average inventory = average throughput x average flow time.

  • Value-added steps transform the product in a way the customer pays for; non-value-added steps are waste.

  • A pull system (kanban) replenishes based on consumption rather than forecast.

  • Poka-yoke prevents errors at the source rather than detecting them downstream.

  • Standard work documents the current best method, takt time, and required inventory.

Quick reference

Leadership and Team

  • A champion removes barriers and secures resources; the sponsor approves the charter and funding.

  • A green belt leads projects within their own area; a black belt leads cross-functional projects and mentors green belts.

  • RACI assigns Responsible, Accountable, Consulted, and Informed roles for each deliverable.

  • Team stages: forming, storming, norming, performing, and adjourning.

  • A tollgate review verifies deliverables and data before the next phase begins.

  • Change management addresses stakeholder resistance through communication, training, and visible sponsor support.

Quick reference

Financial and Business Impact

  • Hard savings are verified reductions in cost or increases in revenue; soft savings are avoided costs or capacity freed.

  • COPQ categories: prevention, appraisal, internal failure, and external failure.

  • A cost-benefit analysis compares project cost to projected benefit over the payback period.

  • Finance validates savings before project closure; unverified savings are not counted.

  • A business case links the improvement to strategic objectives and quantifies expected return.

Quick reference

Data Collection and Sampling

  • A data collection plan specifies what to measure, how, by whom, when, and the sample size.

  • Random sampling reduces bias; stratified sampling ensures representation of subgroups.

  • A check sheet records defect locations and frequencies during collection.

  • Measurement error adds variation; MSA quantifies repeatability and reproducibility.

  • Operational definitions ensure all collectors measure the same characteristic the same way.

  • Sampling frequency should reflect the rate of process change; too infrequent sampling misses shifts.

Quick reference

Graphical Analysis

  • Histograms show distribution shape, center, and spread; they do not show time order.

  • Run charts and control charts show time-ordered behavior and detect trends and shifts.

  • Scatter plots reveal relationships between two continuous variables.

  • Pareto charts rank causes by frequency or cost to prioritize action.

  • Box plots display median, quartiles, and outliers compactly.

  • Multi-Vari charts stratify variation by source to narrow root cause search.

Quick reference

Regression and Correlation

  • Simple linear regression fits y = a + bx; the slope b estimates the change in y per unit change in x.

  • R-squared is the proportion of variation in y explained by the model; adjusted R-squared penalizes extra predictors.

  • Residual plots check linearity, constant variance, and independence assumptions.

  • Multicollinearity inflates coefficient variance; variance inflation factor above 10 signals a problem.

  • Logistic regression models a binary response; it predicts probability rather than a continuous value.

Quick reference

Control Chart Details

  • X-bar/R charts use subgroup ranges to estimate sigma; X-bar/S charts use subgroup standard deviations for larger subgroups (n > 9).

  • I-MR charts use moving ranges of individuals; they suit slow processes or single measurements.

  • p charts track proportion defective with variable sample size; np charts require constant sample size.

  • c charts count defects per unit with constant opportunity; u charts allow variable opportunity.

  • Control limits are recalculated only after a verified process change, not after every signal.

Quick reference

Hypothesis Test Details

  • One-tailed tests place alpha in one tail; two-tailed tests split alpha across both tails.

  • Paired t tests analyze before-and-after measurements on the same units.

  • Chi-square goodness-of-fit tests whether observed frequencies match expected frequencies.

  • Chi-square test of independence tests association between two categorical variables.

  • ANOVA assumes normality, independence, and equal variances; violations may require a nonparametric test.

  • Equivalence of variances is tested with Levene's or Bartlett's test before ANOVA.

Quick reference

DOE Details

  • Main effect is the average change in response when a factor moves between levels.

  • Interaction occurs when the effect of one factor depends on the level of another.

  • Center points detect curvature and estimate pure error in a two-level design.

  • A confounding structure (alias) defines which effects are indistinguishable in a fractional design.

  • A response surface design fits a quadratic model to find optimum settings.

Quick reference

MSA Details

  • Repeatability is variation from repeated measurements by one appraiser on one part.

  • Reproducibility is variation between appraisers measuring the same parts.

  • Part-to-part variation is the true process variation the study should capture.

  • Adequate part selection spans the process range; parts clustered near the mean hide variation.

  • Attribute agreement analysis reports within-appraiser and between-appraiser agreement plus agreement with the standard.

Quick reference

Process Capability Details

  • Capability requires a stable, in-control process; computing Cpk on an unstable process is invalid.

  • Cpk of 1.33 corresponds to about 63 DPMO for a centered process; 1.67 corresponds to about 0.6 DPMO.

  • Ppk uses overall standard deviation and is preferred for initial studies; Cpk uses within-subgroup sigma for ongoing capability.

  • A process can be in control but incapable; capability compares spread to specification.

  • Non-normal data requires transformation or a non-normal capability index before reporting.

Quick reference

FMEA Details

  • Severity rates the effect of failure on the customer, 1 (none) to 10 (hazardous).

  • Occurrence rates the likelihood of the cause producing the failure, 1 to 10.

  • Detection rates the ability to detect the failure before it reaches the customer, 1 (certain detection) to 10 (no detection).

  • RPN prioritizes actions; high severity items are addressed even when RPN is low.

  • Actions reduce occurrence or improve detection; severity is reduced only by design change.

Quick reference

Lean Tools Details

  • 5S: sort, set in order, shine, standardize, sustain.

  • Value stream mapping distinguishes value-added, necessary non-value-added, and pure waste steps.

  • SMED converts internal setup to external setup to cut changeover time.

  • Kanban signals replenishment based on consumption; it limits work-in-process.

  • Poka-yoke devices prevent or detect errors at the source.

Quick reference

Project Management Details

  • A charter defines scope, goal, team, timeline, and business case; scope creep is controlled through change approval.

  • A Gantt chart schedules tasks and dependencies; a critical path is the longest sequence of dependent tasks.

  • A risk register lists risks, likelihood, impact, and mitigation owner.

  • Lessons learned are captured at project closure and shared with the organization.

  • A tollgate review verifies phase deliverables and data quality before advancing.

Quick reference

Quality History and Concepts

  • Deming's 14 points emphasize constancy of purpose and removing fear; his System of Profound Knowledge covers systems, variation, knowledge, and psychology.

  • Juran's quality trilogy: quality planning, quality control, and quality improvement.

  • Crosby defined quality as conformance to requirements and promoted zero defects.

  • Ishikawa introduced the fishbone diagram and quality circles.

  • Taguchi emphasized robust design and loss function rather than conformance to specification alone.

Quick reference

Sampling and Acceptance

  • Acceptance sampling uses a sampling plan with sample size n and acceptance number c.

  • Producer's risk (alpha) is the probability of rejecting a good lot; consumer's risk (beta) is accepting a bad lot.

  • An operating characteristic curve plots probability of acceptance against lot quality.

  • AQL is the acceptable quality level; LTPD is the lot tolerance percent defective.

  • 100% inspection is not a substitute for process control and does not guarantee zero defects.

Quick reference

Measurement Scales

  • Nominal data are categories with no order (defect type, color).

  • Ordinal data have order but unequal intervals (survey ratings, rankings).

  • Interval data have equal intervals but no true zero (temperature in Celsius).

  • Ratio data have equal intervals and a true zero (weight, cycle time).

  • Parametric tests require interval or ratio data; nominal and ordinal data use nonparametric methods.

Quick reference

Variation Concepts

  • Common cause variation is inherent to the process and requires management action to reduce.

  • Special cause variation arises from assignable sources and is detected by control chart signals.

  • Tampering with a stable process increases variation; Deming's funnel experiment illustrates this.

  • Process variation is the sum of within-piece, piece-to-piece, and time-to-time variation.

  • Reducing variation is the primary route to improving capability and yield.

Quick reference

Six Sigma Roles and Roadmap

  • DMAIC applies to improving existing processes; DMADV (define, measure, analyze, design, verify) applies to designing new processes.

  • A green belt leads projects part-time within their function; a black belt leads full-time cross-functional projects.

  • A master black belt provides technical leadership and mentors belts.

  • A champion selects projects, removes barriers, and reports to leadership.

  • A tollgate review is a formal checkpoint with defined exit criteria.

Quick reference

Improvement Verification

  • Verify improvement with a hypothesis test comparing before and after data or with a control chart shift.

  • A pilot limits risk and confirms results before full deployment.

  • Financial benefit is validated by Finance before project closure.

  • Standard work and a control plan sustain the gain after the team disbands.

  • Document updated procedures and train affected staff before handover.

Quick reference

Root Cause Verification

  • A root cause is verified by turning the suspected cause on and off and observing the response.

  • The five whys drills from symptom to underlying cause through repeated questioning.

  • A fishbone diagram organizes suspected causes but does not verify them.

  • Multi-Vari analysis narrows the search by stratifying variation by source.

  • Correlation between a suspected cause and the effect is not proof of causation.

Quick reference

Control Plan Elements

  • Process step and characteristic identify what is controlled.

  • Specification and measurement method define the requirement and how it is checked.

  • Sample size and frequency define the inspection schedule.

  • Control method identifies the chart, poka-yoke, or inspection used.

  • Reaction plan names the action and owner when a signal occurs.

Quick reference

Data Integrity

  • Operational definitions ensure consistent measurement across collectors.

  • Calibration ensures instruments measure accurately against a reference.

  • Data collection plans prevent missing or biased data.

  • MSA quantifies measurement system variation before capability analysis.

  • Data entry errors are detected through verification and double-checking.

Quick reference

Process Mapping

  • A SIPOC defines process boundaries at a high level.

  • A flowchart details step sequence and decision points.

  • A value stream map adds time and inventory data to identify waste.

  • A swimlane map assigns steps to owners across functions.

  • A deployment flowchart clarifies handoffs and responsibility.

Quick reference

Cost of Quality

  • Prevention costs include training, design reviews, and quality planning.

  • Appraisal costs include inspection, testing, and audits.

  • Internal failure costs include scrap, rework, and downtime.

  • External failure costs include warranty, returns, and liability.

  • COPQ quantifies the financial impact of poor quality and prioritizes improvement.

Quick reference

Benchmarking and Best Practice

  • Benchmarking compares process performance to internal, competitive, or best-in-class references.

  • Gap analysis quantifies the difference between current and target performance.

  • Best practice adoption requires adaptation to the local process context.

  • Benchmarking data must be comparable in definition and measurement method.

  • Targets set from benchmarks must be achievable and tied to CTQ requirements.

Quick reference

Change Management

  • Stakeholder analysis rates influence and interest to plan communication.

  • Resistance is addressed through communication, training, and visible sponsor support.

  • Early wins build momentum for the change.

  • Standard work and training sustain the change after deployment.

  • Communication plans specify audience, message, channel, and frequency.

Quick reference

Risk Management

  • A risk register lists risks, likelihood, impact, and mitigation owner.

  • FMEA prioritizes failure modes by severity, occurrence, and detection.

  • Poka-yoke reduces risk by preventing errors at the source.

  • A control plan defines monitoring and reaction for residual risk.

  • Risk review occurs at each tollgate.

Quick reference

Project Selection

  • Projects are selected for strategic alignment, financial impact, and feasibility.

  • A Pareto analysis identifies the vital few problems worth solving.

  • A project charter is approved by the sponsor before work begins.

  • Scope must be defined tightly to avoid scope creep.

  • Quick wins build credibility for larger projects.

Quick reference

Statistical Software and Tools

  • Minitab, JMP, and R are common tools for capability, MSA, and DOE analysis.

  • Control charts, capability analysis, and hypothesis tests are standard software outputs.

  • Software output must be interpreted against the study design, not blindly.

  • Assumption checks (normality, equal variance) precede parametric tests.

  • Graphical analysis complements numerical output.

Quick reference

Exam-Day Reminders

  • Read the question for the data type and phase before selecting a tool.

  • Eliminate answers that confuse control limits with specification limits.

  • When asked to sustain a gain, choose control plan or standard work.

  • When asked to verify a cause, choose a designed test, not consensus.

  • When asked about correlation and causation, choose the caution answer.

Quick reference

Key Definitions

  • CTQ: a measurable characteristic critical to customer satisfaction.

  • DPU: defects per unit.

  • RTY: rolled throughput yield, the product of step yields.

  • Cpk: capability index accounting for centering.

  • RPN: risk priority number, S x O x D.

  • MSA: measurement system analysis.

  • DOE: design of experiments.

Quick reference

Final Review

  • DMAIC phases and their primary tools are the core of the exam.

  • Capability formulas and control chart selection are high-frequency topics.

  • MSA and DOE concepts are tested conceptually and numerically.

  • Lean tools and waste categories appear in Improve questions.

  • Control plan and standard work appear in Control questions.

Quick reference

Reference Summary

  • Define the problem, measure the baseline, analyze causes, improve with verified solutions, control with monitoring.

  • Select tools by data type and phase.

  • Verify causes and improvements with data, not opinion.

  • Sustain gains with control plans and standard work.

  • Validate financial benefit before closure.

Quick reference

Closing Notes

  • The exam tests application, not memorization alone.

  • Practice selecting tools for stated scenarios.

  • Check formulas for centering and sample size effects.

  • Confirm control versus capability distinctions.

  • Confirm special cause rules and reaction plans.

Quick reference

Appendix

  • Formulas: Cp, Cpk, Ppk, DPMO, RTY, RPN, kappa.

  • Charts: I-MR, X-bar/R, X-bar/S, p, np, c, u.

  • Tests: t, paired t, ANOVA, chi-square, Mann-Whitney, Kruskal-Wallis.

  • Tools: SIPOC, VOC, CTQ, FMEA, DOE, MSA.

  • Phases: Define, Measure, Analyze, Improve, Control.