ICAEW MI study materials
ICAEW MI study resources

ICAEW MI cheat sheet

ICAEW MI · Keep the key ideas within reach.

Quick reference

Management Information

  • Management information is data processed into a form that supports planning, control and decision-making; data alone is unprocessed fact.

  • Information qualities: relevance, accuracy, completeness, timeliness, cost-effectiveness, understandability, comparability and reliability - a report failing any of these loses decision value.

  • Hierarchy of information: strategic (long-term, external, aggregated, ad hoc), tactical (medium-term, internal/external, exception-based), operational (short-term, internal, detailed, frequent).

  • Decision phases (Simon): intelligence (identify problem), design (generate options), choice (select option), implementation and review - information needs differ at each phase.

  • Cost of information includes capture, processing, storage and distribution; marginal benefit of extra information should exceed its marginal cost.

  • Data capture errors: transcription, transposition, omission, duplication and coding errors; validation checks (range, format, existence, check digit) catch some but not all.

  • A management information system converts transaction data (payroll, sales, inventory) into summary reports; the accounting information system is a subset focused on financial transactions.

  • Information overload reduces decision quality; exception reporting and summarisation are controls against it.

  • Big data characteristics (volume, velocity, variety, veracity) affect the design of reporting and analytics systems.

Quick reference

Costing and Cost Classification

  • Cost object is anything for which costs are separately measured; direct costs are traceable to it, indirect costs (overheads) are not and must be apportioned.

  • Cost behaviour: fixed cost constant in total within the relevant range; variable cost constant per unit; semi-variable cost has both elements, split using high-low or least squares.

  • High-low method: variable cost per unit = (cost at high activity − cost at low activity) ÷ (high activity − low activity); fixed cost = total cost − variable rate × activity.

  • Prime cost = direct materials + direct labour + direct expenses; production cost adds production overhead; total cost adds non-production overhead.

  • Absorption costing: predetermined overhead rate = budgeted overhead ÷ budgeted absorption base (labour hours, machine hours, units); applied overhead = rate × actual activity.

  • Over/under absorption = overhead absorbed − overhead incurred; over-absorption occurs when actual activity exceeds budget or actual overhead is below budget.

  • Activity-based costing pools overheads by activity driver (set-ups, orders, inspections) and charges cost objects by driver consumption, improving accuracy where products differ in complexity.

  • Marginal costing values inventory at variable production cost only; fixed production overhead is a period cost, so profit differs from absorption costing by the fixed overhead in inventory movement.

  • Relevant cost for decisions: future, incremental and cash-based; sunk costs, committed costs and non-cash book values are excluded; opportunity cost is included.

Quick reference

Budgeting and Forecasting

  • Budget purposes: planning, coordination, communication, motivation, control and performance evaluation; these can conflict (e.g. tight budgets motivate but may demotivate).

  • Incremental budgeting adjusts last year's figures; zero-based budgeting builds each activity from a decision package and requires justification of all spend.

  • Rolling (continuous) budgets are revised each period and always look a fixed number of periods ahead, improving accuracy in volatile environments.

  • Flexed budget restates the fixed budget for actual activity using standard variable cost per unit, isolating volume effects from price and efficiency effects.

  • Variance: total = flexed budget − actual. Adverse (A) where profit is lower or cost higher than budget; favourable (F) where profit is higher or cost lower.

  • Sales volume profit variance = (actual units − budget units) × standard profit per unit; sales price variance = (actual price − standard price) × actual units.

  • Material price variance = (standard price − actual price) × actual quantity purchased; material usage variance = (standard quantity for actual output − actual quantity) × standard price.

  • Labour rate variance = (standard rate − actual rate) × actual hours paid; labour efficiency variance = (standard hours for actual output − actual hours worked) × standard rate.

  • Learning curve: cumulative average time per unit falls by a constant percentage each time cumulative output doubles; y = ax^b where b = log(learning rate) ÷ log 2.

Quick reference

Standard Costing and Performance Measurement

  • Standard costing sets predetermined costs for materials, labour and overhead; standards may be ideal, attainable or current, and the choice affects motivation and variance interpretation.

  • Fixed overhead variances: expenditure = budgeted fixed overhead − actual fixed overhead; volume = (actual units − budget units) × standard fixed overhead per unit.

  • Fixed overhead capacity variance = (actual hours − budget hours) × standard rate; efficiency variance = (standard hours for actual output − actual hours) × standard rate.

  • Operating statement reconciles budgeted profit to actual profit by adding favourable and deducting adverse variances, separating planning and operating variances where relevant.

  • Variance investigation: consider size, trend, controllability, cost of investigation and likely benefit; random fluctuations should not trigger investigation.

  • Return on investment (ROI) = controllable profit ÷ divisional investment; residual income (RI) = controllable profit − imputed interest on investment.

  • RI encourages investment above the cost of capital; ROI can cause managers to reject projects that dilute a high existing ROI.

  • Balanced scorecard perspectives: financial, customer, internal process, learning and growth; measures should link to strategy, not just lagging financial results.

  • Transfer price at market price suits autonomy; at variable cost plus opportunity cost it gives goal congruence when capacity is scarce; at full cost it can distort decisions.

Quick reference

Decision Making and Investment Appraisal

  • Break-even units = fixed costs ÷ contribution per unit; contribution per unit = selling price − variable cost per unit; contribution/sales ratio = contribution ÷ sales.

  • Margin of safety = (budgeted sales − break-even sales) ÷ budgeted sales, expressed as a percentage or in units.

  • Target profit volume = (fixed costs + target profit) ÷ contribution per unit; CVP analysis assumes constant price, cost and product mix within the relevant range.

  • Payback period = time for cumulative cash inflows to equal the initial outlay; ignores cash flows after payback and the time value of money.

  • Net present value discounts all relevant cash flows at the cost of capital; accept if NPV positive; NPV is preferred because it is absolute and uses all cash flows.

  • IRR is the discount rate giving zero NPV; accept if IRR exceeds cost of capital; it can mislead with non-conventional cash flows or when comparing project scale.

  • Relevant cash flows for appraisal exclude sunk costs, allocated overhead and non-cash items; include opportunity costs, incremental working capital and tax effects.

  • Accounting rate of return = average annual accounting profit ÷ average investment; ignores timing of cash flows.

  • Sensitivity analysis and scenario analysis test how far an assumption can change before the decision reverses; probability analysis weights outcomes by likelihood.

Quick reference

Reporting, Spreadsheets and Data Quality

  • Spreadsheet controls: input validation, protected cells, locked formulas, version control, audit trail and independent review of key models.

  • Common spreadsheet risks: hard-coded values inside formulas, broken links, range errors, circular references and undetected manual overrides.

  • Absolute referencing ($A$1) fixes row and column when copied; mixed referencing fixes one; relative referencing shifts both - errors arise from wrong choice.

  • Lookup functions (VLOOKUP, INDEX/MATCH) require sorted or exact-match logic; approximate match on unsorted data returns wrong results.

  • A report should state purpose, period, source, basis of preparation and any assumptions; comparatives and ratios aid interpretation.

  • Key ratios: gross margin = gross profit ÷ revenue; operating margin = operating profit ÷ revenue; inventory days = inventory ÷ cost of sales × 365.

  • Data integrity controls: reconciliation between systems, exception reports, segregation of duties and review of master data changes.

  • Presenting information: chart type must suit the data (line for trends, bar for comparison, pie for composition); misleading scales and truncated axes distort interpretation.