ICC E2 study materials
ICC E2 study resources

ICC E2 flashcards

ICC E2 · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Prescriptive compliance path
A method where each building component meets individual minimum requirements set by the code without trade-offs between components.
Trade-off compliance path
An approach allowing over-compliance in one area to offset under-compliance in another, typically using an allowable envelope or lighting trade-off calculation.
Performance compliance path
A whole-building energy simulation approach comparing proposed design annual energy use to a baseline design meeting the code.
Code official authority
The jurisdiction's designated official empowered to interpret code provisions, approve alternative materials, issue permits, and enforce compliance.
Certificate of occupancy
A document issued after final inspection confirming the building complies with applicable codes and is safe for occupancy.
Board of appeals
A panel that reviews code official decisions and may grant variances when strict compliance causes practical difficulty without compromising code intent.
Continuous air barrier
A sealed system of materials and assemblies that resist air leakage through the building envelope, including joints and penetrations.
U-factor
The overall heat transfer coefficient of an assembly, expressed in Btu/(h·ft²·°F); lower values indicate better insulation.
Solar heat gain coefficient
The fraction of solar radiation admitted through fenestration, either directly transmitted or absorbed and released inward; lower values reduce cooling loads.
NFRC label
A certification label on fenestration products listing certified U-factor, SHGC, and visible transmittance values verified by the National Fenestration Rating Council.
Thermal bridging
A path of high thermal conductivity through an assembly (e.g., steel studs) that reduces overall insulation effectiveness and must be accounted for in U-factor calculations.
Insulation installation verification
Inspection confirming insulation fills the intended cavity without gaps, compression, or misalignment, and aligns with the air barrier.
Envelope backstop
A maximum U-factor or minimum R-value requirement for envelope components that cannot be traded away under the trade-off path.
Skylight SHGC limit
The maximum solar heat gain coefficient allowed for skylights, typically 0.40 in Climate Zones 4-5, to control cooling loads.
Minimum equipment efficiency
The lowest allowable performance rating (e.g., SEER, AFUE, EER) for mechanical equipment, as listed in ASHRAE 90.1 tables.
Duct insulation R-value
The minimum thermal resistance of duct insulation, typically R-8 for supply ducts in unconditioned spaces and R-6 for return ducts.
Lighting power density
The maximum allowed lighting power per unit area (W/ft²) for a space or building, determined by space type or whole-building method.
Occupant sensor control
A device that automatically turns off lighting when a space is unoccupied, required in classrooms, conference rooms, and restrooms.
Daylight-responsive control
A control that dims or switches lighting in response to available daylight in daylit zones, required in perimeter areas.
Economizer
A system that uses outdoor air for cooling when conditions are favorable, required above a cooling capacity threshold in certain climate zones.
Service water heating efficiency
The minimum energy factor (EF) or thermal efficiency required for water heaters, varying by fuel type and storage volume.
Pipe insulation thickness
The minimum insulation thickness for heating and cooling pipes, determined by pipe diameter and fluid temperature per code tables.
Energy recovery ventilation
A system that transfers heat or moisture between exhaust and incoming outdoor air, required for large systems with high outdoor air fractions.
Plan review
The code official's examination of construction documents to verify compliance with energy code requirements before permit issuance.
Field inspection
On-site verification that installed materials and equipment match approved plans and meet code requirements for insulation, air sealing, and efficiency.
Duct leakage test
A pressurization test measuring air leakage from duct systems, with leakage limited to a percentage of design airflow (e.g., 4%).
Blower door test
A diagnostic test that pressurizes a building to measure envelope air leakage, often required to verify air barrier performance.
Commissioning report
Documentation verifying that mechanical and lighting systems operate as designed, including test results and adjustments made.
Functional testing
Verification that controls and systems respond correctly to simulated conditions, such as occupancy or daylight signals.
Compliance documentation
Forms and reports (e.g., COMcheck) submitted to the code official demonstrating that the design meets energy code requirements.
Final inspection
The last verification step confirming all code requirements are met and required certificates are submitted before occupancy.
Re-inspection
A follow-up inspection after corrections are made to noncompliant items identified during a prior inspection.