ICC E2 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Commercial Energy Code Administration and Enforcement

  • Map the scope and structure of the commercial energy code provisions covered on the exam

  • Define key administrative terms: compliance path, permit, plan review, certificate of occupancy, code official authority

  • Outline the sequence of administration and enforcement steps from permit application through final inspection

  • Draft a one-page flowchart of the enforcement process

Your checkpoint

One-page enforcement-process flowchart with each stage labeled and annotated

Week 2

Commercial Energy Code Administration and Enforcement

  • Distinguish the roles of design professional, contractor, and code official in demonstrating compliance

  • Identify documentation required for permit submittal and for final compliance

  • Explain the purpose and content of the compliance documentation and how it is verified in the field

  • Summarize the relationship between administrative requirements and technical chapters

Your checkpoint

Written summary (1-2 pages) of required submittal and final-compliance documentation

Week 3

Building Envelope Requirements

  • Classify envelope requirements by climate zone and building type

  • Define envelope terms: thermal transmittance, thermal resistance, continuous insulation, fenestration, air leakage

  • Compare prescriptive envelope tables for above-grade walls, roofs, and floors

  • Calculate a simple assembly U-factor from layer R-values

Your checkpoint

Worked calculation set of 5 assembly U-factor problems with answers and notes

Week 4

Building Envelope Requirements

  • Apply fenestration requirements including U-factor, solar heat gain, and area limits

  • Describe air-barrier and air-leakage requirements and how they are inspected

  • Identify common envelope noncompliance conditions found during inspection

  • Practice reading a wall/roof section and matching it to code requirements

Your checkpoint

Envelope inspection checklist covering walls, roofs, fenestration, and air barrier

Week 5

Mechanical, Service Water Heating and Lighting Systems

  • Distinguish mechanical system requirements: equipment efficiency, controls, economizers, and duct insulation

  • Explain service water heating requirements including efficiency, insulation, and controls

  • Summarize lighting power density, lighting controls, and daylighting provisions

  • Compare requirements across system types and identify common inspection points

Your checkpoint

Comparison table of mechanical, water-heating, and lighting requirements with inspection points

Week 6

Mechanical, Service Water Heating and Lighting Systems

  • Apply lighting power density concepts to a sample space calculation

  • Describe mechanical ventilation and economizer control requirements

  • Identify controls and commissioning requirements for covered systems

  • Practice identifying noncompliance in sample system descriptions

Your checkpoint

Completed sample LPD calculation plus a list of 10 system-level inspection checkpoints

Week 7

Energy Code Compliance Verification and Inspection Procedures

  • Outline plan-review steps for verifying compliance documentation against code requirements

  • Describe field inspection procedures for envelope, mechanical, water heating, and lighting

  • Explain how to document findings and follow up on corrections

  • Practice reviewing a sample submittal for completeness and compliance

Your checkpoint

Plan-review and field-inspection procedure outline with a sample review of one submittal

Week 8

Commercial Energy Code Administration and Enforcement & Building Envelope Requirements & Mechanical, Service Water Heating and Lighting Systems & Energy Code Compliance Verification and Inspection Procedures

  • Integrate all four domains into a single compliance workflow

  • Complete timed practice questions across all domains and review missed items

  • Revisit weakest areas identified during practice

  • Build a final quick-reference sheet for exam day

Your checkpoint

Timed practice score report with a targeted remediation list and one-page quick-reference sheet

Milestones

Week 2: Can explain the full permit-to-occupancy enforcement sequence and required documentation without notes

Week 4: Scores at least 70% on envelope practice problems and correctly applies climate-zone and fenestration limits

Week 6: Scores at least 70% on mechanical, water-heating, and lighting practice items and completes LPD calculation accurately

Week 7: Can walk through plan review and field inspection procedures and identify at least 8 of 10 planted noncompliance items

Week 8: Scores at least 75% on a full timed mixed-domain practice set and has a completed remediation list