ICC F1 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Building Construction, Fire Resistance, and Means of Egress

  • Diagram the five construction types (I–V) and label the fire-resistance requirements that apply to each major structural element.

  • Calculate occupant load for at least eight spaces using occupancy-specific area factors and net vs. gross distinctions.

  • Trace egress paths on three sample floor layouts and measure exit access travel distance, common path, dead-end travel, and required egress width.

  • Compare required versus provided number of exits, exit width, and exit arrangement for the same three layouts and note every deficiency.

Your checkpoint

A self-built 10-question worksheet with fully worked occupant-load and egress-width calculations, scored at 90% or better against the code tables.

Week 2

Building Construction, Fire Resistance, and Means of Egress & Fire Protection Systems and Equipment

  • Explain how fire-resistance-rated assemblies, opening protectives, and penetration protection work together to hold a compartment boundary, and identify where each is verified in the field.

  • Sketch a sprinkler riser showing main drain, control valve, check valve, FDC, alarm valve, branch lines, and heads, and state the inspector's field check for each.

  • Differentiate wet-pipe, dry-pipe, pre-action, and deluge systems by activation logic and typical application.

  • Separate the items an inspector verifies during a periodic inspection from those the owner's testing and maintenance program covers.

Your checkpoint

A labeled riser diagram with at least 15 annotated components plus a two-column table dividing inspector verification duties from owner maintenance duties.

Week 3

Fire Protection Systems and Equipment

  • Describe the sequence of operation of a fire alarm system from initiation through notification, and contrast conventional with addressable architecture.

  • Match smoke, heat, flame, and gas detection technologies to the fire stages and occupancies where each is appropriate.

  • List the acceptance test steps for a new fire alarm system and for a new sprinkler system in the order an inspector witnesses them.

  • Select portable extinguishers by hazard class and interpret the rating markings and travel-distance placement rules.

Your checkpoint

A detection-technology comparison matrix (technology × fire stage × suitable occupancy × limitation) plus 20 flashcards on system components and inspection points.

Week 4

Occupancy Classification and Fire Safety Requirements

  • Classify 25 described buildings and tenant spaces into occupancy groups and justify each with the defining use characteristic.

  • Distinguish accessory uses, incidental uses, mixed uses, and a true change of occupancy in borderline scenarios.

  • Determine when a change of use or occupancy triggers a new certificate of occupancy and what documentation it requires.

  • Map the occupant-load factors, egress rules, and fire protection features that follow from each occupancy group assigned.

Your checkpoint

A classification log of 25 buildings listing the assigned group, the rationale, and one egress or protection implication each, scored at 90% against an answer key.

Week 5

Occupancy Classification and Fire Safety Requirements & Administration and Enforcement of Fire and Life Safety Codes

  • Relate each occupancy group to its required fire protection features, including sprinkler thresholds, separation requirements, and allowable height and area limits.

  • Outline the permit and plan review workflow from application through final certificate of occupancy, naming the inspector's decision at each step.

  • Identify the inspector's legal authority and limits: right of entry, notices of violation, stop-work orders, citations, and the appeal route.

  • Summarize how adopted code editions, local amendments, and referenced standards interact when requirements appear to conflict.

Your checkpoint

A one-page flowchart of the permit → plan review → inspection → certificate of occupancy process, annotated with the inspector's decision point at every stage.

Week 6

Administration and Enforcement of Fire and Life Safety Codes

  • Distinguish a code violation from a non-code maintenance or housekeeping issue and select the correct corrective remedy for each.

  • Draft a notice of violation containing every required element, including the code section cited, the corrective action, and the compliance deadline.

  • Explain the boundary between a fire code inspection and a fire investigation and state when to escalate to an investigator.

  • Describe the records an inspection file must contain and how long each record type is retained.

Your checkpoint

Three complete written notices of violation for escalating scenarios, each self-scored against a 10-point completeness checklist.

Week 7

Inspection Procedures, Hazard Identification, and Reporting

  • Build inspection checklists for a mercantile occupancy and for an assembly occupancy, sequencing items in a walk-through order.

  • Identify and rank at least 10 common field hazards by risk, including storage clearance, electrical misuse, blocked egress, and hot work.

  • Document findings in a field report with measurements, photographs described in text, and the governing code reference for each item.

  • Describe the procedure for handling an imminent hazard and the follow-up re-inspection process.

Your checkpoint

Two occupancy-specific inspection checklists plus one full mock field report containing at least eight findings, each with a measurement and a code reference.

Week 8

Administration and Enforcement of Fire and Life Safety Codes & Occupancy Classification and Fire Safety Requirements & Building Construction, Fire Resistance, and Means of Egress & Fire Protection Systems and Equipment & Inspection Procedures, Hazard Identification, and Reporting

  • Complete two full-length timed practice exams and tabulate every missed item by domain.

  • Re-drill the two weakest domains until practice accuracy reaches 85% or better.

  • Recite from memory the key tables and definitions - construction types, occupancy groups, occupant-load factors, and system components - without notes.

  • Simulate exam-day conditions and confirm scheduling, identification, and allowed-reference logistics.

Your checkpoint

A timed full-length practice exam score of 80% or better accompanied by a written error log categorizing every missed question by domain and cause.

Milestones

Week 2: Completed riser diagram and duty-split table; explain the sprinkler riser components from memory without notes.

Week 4: Closed-book 40-question set covering Domains 3 and 4 scored at 75% or better, plus the 25-building classification log at 90%.

Week 6: Closed-book 30-question set covering Domains 1 and 2 scored at 80% or better, plus three complete notices of violation passing the 10-point checklist.

Week 8: Full-length timed practice exam at 80% or better with an error log showing no single domain below 70%.