ICC P3 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

General Administration and Plumbing Plan Review Fundamentals

  • Map the scope of the plumbing inspector's administrative role: permit application review, plan submittal completeness, and inspection sequencing

  • Define the plan-review workflow step by step, from submittal intake through approval, correction notice, and re-submittal

  • Identify which plumbing system drawings, schedules, and riser diagrams a reviewer must confirm are present before technical review begins

  • Explain how code official duties, alternative materials and methods requests, and approvals are documented

  • Distinguish the administrative chapter requirements from the technical chapters so you know which rules govern process versus design

Your checkpoint

A one-page flowchart of the plan-review and inspection process plus a 25-item checklist of submittal components, both produced closed-book and self-scored to 90% accuracy

Week 2

General Administration and Plumbing Plan Review Fundamentals & Plumbing Fixtures and Fixture Fittings

  • Interpret occupant-load and fixture-count calculations to verify minimum fixture quantities from a given occupancy and use

  • Match each fixture type to its required clearance, access, and installation conditions

  • Verify fixture fitting requirements: supply stops, trap seal protection, backflow protection at hose bibs and flush valves, and fixture tailpiece sizing

  • Review a fixture schedule against fixture-unit values and note every correction needed

  • Recite the fixture-unit assignments used for drainage and water-supply sizing without reference materials

Your checkpoint

Complete a written fixture-count and fixture-unit exercise for three different occupancies and score at least 80% on your own graded review

Week 3

Water Heaters

  • Classify water heaters by type and state the installation limits and approval conditions for each

  • Determine temperature, pressure, and relief valve requirements including sizing basis, discharge piping, and termination

  • Apply combustion air, venting, and clearance rules to a gas-fired water heater installation

  • Verify seismic strapping, drain pan, and drain-line requirements for a given installation scenario

  • Calculate required relief valve capacity and identify the three most common water-heater plan-review rejection reasons

Your checkpoint

A completed water-heater installation review worksheet covering five scenarios, with every deficiency cited to the applicable requirement and a self-assessed score of 80% or higher

Week 4

Water Supply and Distribution

  • Size a water distribution system from fixture units, developed length, and pressure loss using the applicable tables

  • Trace a supply system from the source through the meter, backflow prevention, distribution mains, and branches, and identify each required valve and device

  • Evaluate backflow protection selection for cross-connections in the scenarios you are most likely to see on the exam

  • Determine required pipe support, protection from freezing, and protection from corrosion for a given routing

  • Diagnose pressure problems by applying the minimum residual pressure and pressure-loss criteria

Your checkpoint

A full water-supply sizing calculation for a two-story building, showing fixture units, developed length, and pipe sizes at each segment, verified to at least 90% self-graded accuracy

Week 5

Sanitary Drainage, Vents, and Storm Drainage

  • Size and slope horizontal drainage branches and building drains using drainage fixture units and the slope tables

  • Determine vent requirements: individual, common, wet, and stack venting, plus vent terminal location limits

  • Verify trap requirements, trap seal protection, and the conditions under which a trap primer is needed

  • Apply cleanout spacing and accessibility requirements to a drainage layout

  • Calculate storm drainage demand and size roof drains, leaders, and storm building drains for a given rainfall rate

Your checkpoint

A marked-up drainage, vent, and storm plan set with all pipe sizes, slopes, cleanouts, and vent terminals annotated and a written justification list of at least 15 decisions

Week 6

Fuel Gas Piping and Special Plumbing Systems

  • Trace a fuel gas piping system from the point of delivery through the meter, regulator, and appliances and identify each required valve and sediment trap

  • Size gas piping using the longest-length and appliance-demand method for a multi-appliance layout

  • Apply combustion air, appliance venting, and clearance-to-combustible requirements to both Category I and direct-vent appliances

  • Identify testing, purging, and bonding requirements for gas piping installation and inspection

  • Recognize the special plumbing systems most often tested: indirect waste, special wastes, grease interception, and medical or laboratory waste where applicable

Your checkpoint

A completed gas-piping sizing and venting review of a five-appliance layout, including a deficiency list of at least 12 items, self-graded to 80% or better

Week 7

General Administration and Plumbing Plan Review Fundamentals & Plumbing Fixtures and Fixture Fittings & Water Heaters & Water Supply and Distribution

  • Re-solve every missed question type from weeks 1 through 4 without notes and log the underlying rule for each

  • Cross-link administrative requirements to technical outcomes by writing ten plan-review comments that cite both a process step and a technical requirement

  • Build a personal reference index of the tables and criteria you must be able to locate quickly during an open-book exam

  • Practice timed answering on multi-domain scenarios that combine water supply, fixtures, and water heating in a single building

Your checkpoint

A written remediation log covering at least 40 previously missed items, closed-book re-test score of 85% or better on a 50-question mix of domains 1 through 4

Week 8

Sanitary Drainage, Vents, and Storm Drainage & Fuel Gas Piping and Special Plumbing Systems

  • Complete four timed full-scope practice exams under exam conditions and record the score for each domain separately

  • Re-drill any domain scoring below 80% until two consecutive practice sets clear the threshold

  • Convert every remaining weak area into a one-line rule statement you can recall on demand

  • Rehearse time allocation and question-skipping strategy so that no item is left blank

Your checkpoint

A final scorecard showing the best score per domain at 80% or higher and a one-page summary of the 20 rules you are most likely to forget

Milestones

Week 2: Explain the full plan-review workflow and correctly perform a fixture-count calculation from an occupancy description, closed-book, without referring to notes

Week 4: Complete one full water-supply sizing problem end to end and cite the governing requirement for every step

Week 6: Score 80% or higher on a self-written 60-question exam split evenly across all six domains

Week 8: Reach 80% or higher in every domain on a timed full-scope practice exam, with no domain below 75% on any single attempt