- Nominal strand area
- Tabulated cross-sectional area of seven-wire strand based on nominal wire diameter; used for all design and elongation calculations instead of measured area.
- Characteristic breaking load
- Fpk equals nominal strand area times characteristic tensile strength fpk; the basis for anchorage efficiency and tensioning force calculations.
- Low-relaxation strand
- Strand with relaxation loss of about 2.5 percent or less after 1000 hours at 0.7 fpk and 20 degrees C, achieved by stabilising treatment during manufacture.
- Anchorage efficiency requirement
- A prestressing anchorage assembly must develop at least 95 percent of the actual breaking load of the strand in a static tensile test.
- Wedge-type anchorage
- Anchor head with tapered bore and split wedges that grip the strand by wedge action; load transfer depends on wedge seating, not on bond.
- Button-head anchorage
- Wire anchorage using an enlarged upset head bearing on a plate; heading temperature must be controlled to avoid embrittlement of the wire.
- Relaxation test basis
- Steel relaxation is measured at constant strain and initial load of 0.6, 0.7, or 0.8 fpk at 20 degrees C for 1000 hours, with permitted extrapolation.
- Fatigue test of anchorage
- Cyclic loading, commonly two million cycles between specified stress limits, followed by a static tensile test that must still meet the efficiency requirement.
- Threaded bar tendon
- High-strength alloy bar with threaded ends and nuts, coupled by threaded couplers; can be restressed and is used where bonded strand is unsuitable.
- Duct internal diameter
- Corrugated or plastic sheath bore must exceed the strand bundle envelope by a code-specified margin to allow threading and grout flow.
- Transfer strength
- Concrete strength at the time of prestress transfer, typically at least 0.6 to 0.7 of the specified transfer strength; verified by cylinders cured with the member.
- Elastic shortening loss
- Loss equal to modular ratio Ep/Eci times the average concrete stress at tendon level, using the modulus at transfer rather than at 28 days.
- Creep and shrinkage drivers
- Losses increase with low relative humidity, high volume-to-surface ratio, early age at loading, and high sustained stress in the concrete.
- Steam curing temperature cap
- Concrete temperature during steam curing is typically limited to about 60 to 65 degrees C to avoid later-age strength loss and thermal cracking.
- Water-cement ratio for release
- Prestressed mixes commonly use 0.35 to 0.40 water-cement ratio with rapid-hardening cement to achieve release strength at early age.
- Chloride limit for prestressed
- Acid-soluble chloride limits for prestressed concrete are stricter than for reinforced concrete because strand is prone to pitting and stress corrosion.
- Elongation tolerance
- Measured tendon elongation must fall within roughly plus or minus 5 to 7 percent of the calculated value; outside that band requires investigation.
- Jacking force verification
- Jacking force is confirmed by calibrated pressure gauge reading and by measured elongation; both records are required for each tendon.
- Gradual release requirement
- Pretensioning release must be gradual and symmetrical to prevent shock loading, strand slip, and end-zone cracking.
- Grouting time limit
- Post-tensioning ducts are grouted within a specified period after stressing, often 7 to 14 days, using approved grout and venting high points.
- Tensioning record contents
- Record tendon identification, jacking force, gauge pressure, measured elongation, anchorage slip, and ambient temperature at stressing.
- Strand sampling frequency
- Strand is sampled per lot mass, commonly one sample per 20 to 50 tonnes, for tensile, yield, elongation, and relaxation tests.
- End-zone crack inspection
- Horizontal cracks along the tendon path, anchorage spalling, and splitting cracks indicate inadequate confinement and require engineering review.
- Camber as inspection tool
- Camber measured after detensioning is compared with predicted values; unexpected low camber can indicate strand slip or loss of prestress.
- Calibration interval
- Jacks and pressure gauges are calibrated at defined intervals, commonly every six months or after repair, with records available at the plant.
- Lifting point rule
- Lift pretensioned members only at designer-specified points, usually near the ends; lifting elsewhere can overstress or crack the member.
- Storage bearing support
- Store members on dunnage at the designated bearing points, off the ground, avoiding stacking on strand or thin edges.
- Dynamic lift allowance
- Lifting inserts and loops are rated for member weight times a dynamic factor, commonly 1.25 to 1.5 times the static weight.
- Inspector hold points
- Concrete strength at transfer, tensioning, grouting, and final dimensional checks are hold points requiring inspector sign-off before proceeding.
- Referenced steel standards
- EN 10138 and ASTM A416 cover prestressing strand and wire; ASTM A722 covers high-strength bars; EN 13391 covers prestressing systems.
- Nonconformance disposition
- The inspector rejects non-conforming work, reports to the engineer of record, and does not allow the next step until disposition is approved in writing.
- Traceability requirement
- Each tendon and member must be traceable to heat numbers, mill certificates, test reports, and tensioning records; missing records are a compliance failure.