ICC Prestressed Concrete SI key terms
ICC Prestressed Concrete SI · Get comfortable with the vocabulary.
- Prestressing strand
- Related: Low-relaxation strand, Transfer length
A group of high-strength steel wires twisted helically into a single tension member, commonly seven wires with one straight core and six wrapped around it, used to apply compressive force to concrete.
- Low-relaxation strand
- Related: Relaxation, Initial prestress
Strand manufactured and stabilized so that its loss of tension from creep under sustained load is greatly reduced, typically to about one-quarter of the loss in stress-relieved strand.
- Seven-wire strand
- Related: Prestressing strand, Anchorage wedge
The standard prestressing strand configuration of six outer wires helically wrapped around a central king wire, giving a nominal area and diameter used in design tables.
- Prestressing wire
- Related: Prestressing strand, Button head
A single drawn high-strength steel element, smaller in diameter than strand, used individually or grouped in anchorage systems for post-tensioning and for some pretensioned products.
- High-strength prestressing bar
- Related: Coupler, Post-tensioning tendon
A straight, hot-rolled, quenched and tempered steel bar with threads or upset ends, used for post-tensioning where a stiff, high-capacity tendon and threaded anchorage are wanted.
- Anchorage wedge
- Related: Anchor head, Seating loss
A tapered, hardened steel piece with serrated inner bore that grips the strand and seats in a conical hole in the anchor head, transferring tendon force into the concrete.
- Anchor head
- Related: Anchorage wedge, Bearing plate
A block, usually steel, with conical holes that receive wedges and bear against a bearing plate, distributing post-tensioning tendon force into the concrete member.
- Button head
- Related: Prestressing wire, Anchor head
An enlarged, formed end on a prestressing wire that bears against an anchor plate, used in wire tendon systems instead of wedges for gripping.
- Coupler
- Related: High-strength prestressing bar, Post-tensioning tendon
A threaded connector joining two lengths of high-strength prestressing bar end to end so that force can be transmitted continuously through the splice.
- Post-tensioning tendon
- Related: Duct, Grout
A complete assembly of prestressing steel, anchorage, and sheathing or duct that is stressed after the concrete has hardened and then usually grouted or left unbonded.
- Pretensioning
- Related: Transfer length, Strand release
A method in which prestressing steel is tensioned against the casting bed before concrete is placed, and the force is transferred to the concrete by bond when the strands are released.
- Bonded tendon
- Related: Grout, Duct
A post-tensioning tendon whose duct is filled with cementitious grout after stressing, so that prestressing steel and concrete act together through bond.
- Unbonded tendon
- Related: Bonded tendon, Sheathing
A post-tensioning tendon coated with corrosion-protective grease or wax and encased in a plastic sheath, so it can move relative to the concrete and is not bonded to it.
- Duct
- Related: Bonded tendon, Grout
A metal or plastic tube cast into concrete to form a void that houses a post-tensioning tendon and, in bonded systems, later receives cementitious grout.
- Sheathing
- Related: Unbonded tendon, Post-tensioning tendon
The plastic or coated covering around an unbonded tendon that contains corrosion-protective grease and prevents bond between steel and surrounding concrete.
- Grout
- Related: Bonded tendon, Duct
A cementitious mixture placed into a duct after stressing to protect the steel from corrosion and to bond tendon and concrete together in a bonded system.
- Relaxation
- Related: Low-relaxation strand, Initial prestress
The gradual loss of stress in a prestressing steel held at constant length over time, caused by creep of the steel itself and influenced by initial stress and temperature.
- Initial prestress
- Related: Effective prestress, Seating loss
The stress in the prestressing steel immediately after transfer or after stressing and seating, before time-dependent losses such as shrinkage, creep, and relaxation occur.
- Effective prestress
- Related: Initial prestress, Prestress loss
The stress remaining in the prestressing steel after all losses have occurred, used in service-load design checks for stresses, camber, and deflection.
- Prestress loss
- Related: Effective prestress, Elastic shortening
The reduction of prestressing force over time from elastic shortening, concrete shrinkage, concrete creep, steel relaxation, anchorage seating, and friction in post-tensioning.
- Elastic shortening
- Related: Prestress loss, Transfer
Immediate loss of prestress caused by the concrete compressing elastically when the prestressing force is applied, reducing the steel strain and therefore its stress.
- Seating loss
- Related: Anchorage wedge, Initial prestress
Immediate loss of tendon force in post-tensioning as the wedges or anchorage settle into place when the jack is released, allowing a small inward movement of the strand.
- Transfer
- Related: Transfer length, Strand release
The act of releasing pretensioned strands from the bed so their force is delivered to the hardened concrete through bond, usually done when concrete strength is sufficient.
- Transfer length
- Related: Transfer, Development length
The distance from the end of a pretensioned member over which the prestressing force is gradually transferred from steel to concrete by bond.
- Development length
- Related: Transfer length, Bonded tendon
The length over which prestressing steel must be bonded to concrete to develop its design stress, including transfer length plus the flexural bond length beyond it.
- Strand release
- Related: Transfer, Transfer length
The controlled operation of cutting or detensioning pretensioned strands, performed in a sequence that avoids shock, imbalance, or cracking of the concrete member.
- Concrete creep
- Related: Prestress loss, Shrinkage of concrete
Time-dependent deformation of concrete under sustained compressive stress, which shortens the member and reduces the stretch and stress in the prestressing steel.
- Shrinkage of concrete
- Related: Concrete creep, Prestress loss
Volume reduction of concrete as it dries and cures, which shortens a prestressed member and causes a loss of prestress in bonded systems.
- Camber
- Related: Eccentricity of prestress, Effective prestress
The upward deflection built into or resulting from a prestressed member, produced by eccentric prestressing force and partly offset over time by creep and applied loads.
- Eccentricity of prestress
- Related: Camber, Initial prestress
The distance between the centroid of the prestressing steel and the centroid of the concrete section, which controls the bending moment and camber produced by the prestress.
- Jacking force
- Related: Elongation measurement, Seating loss
The temporary force applied by a hydraulic jack to a tendon during stressing, measured by calibrated gauge or load cell and corrected for friction and seating.
- Elongation measurement
- Related: Jacking force, Wobble friction
Field measurement of tendon stretch during stressing, compared with calculated elongation to verify that the intended force has been developed and friction assumptions are correct.
- Wobble friction
- Related: Curvature friction, Elongation measurement
Friction loss in a post-tensioning tendon caused by unintended small angular deviations along its length, growing with distance from the jacking end.
- Curvature friction
- Related: Wobble friction, Jacking force
Friction loss in a post-tensioning tendon caused by its intended curvature, proportional to the total angle change between jacking end and the point considered.
- Concrete cover
- Related: Duct, Chloride content
The least distance from the surface of prestressing steel or duct to the concrete surface, specified to protect steel from corrosion and to provide fire resistance.
- Chloride content
- Related: Concrete cover, Grout
The amount of chloride ion in concrete, limited by code because high levels promote corrosion of embedded steel, particularly in prestressed members where it is restricted severely.
- Steam curing
- Related: Strand release, Transfer
Accelerated curing in which cast members are held in a moist steam environment under a controlled temperature cycle to speed strength gain before strand release.
- Formwork and bed
- Related: Pretensioning, Strand release
The rigid casting surfaces and long stressing bed that hold pretensioned strand at tension and shape the concrete until it hardens sufficiently for release.
- Prestressed concrete pile
- Related: Lifting point, Camber
A factory-produced, prestressed concrete foundation element that must be lifted, stored, transported, and driven without overstressing it at any handling stage.
- Lifting point
- Related: Prestressed concrete pile, Camber
A designated location on a prestressed member where it may be picked up, chosen so that handling stresses and camber remain within design limits.