ICC Prestressed Concrete SI study materials
ICC Prestressed Concrete SI study resources

ICC Prestressed Concrete SI key terms

ICC Prestressed Concrete SI · Get comfortable with the vocabulary.

Prestressing strand

A group of high-strength steel wires twisted helically into a single tension member, commonly seven wires with one straight core and six wrapped around it, used to apply compressive force to concrete.

Related: Low-relaxation strand, Transfer length
Low-relaxation strand

Strand manufactured and stabilized so that its loss of tension from creep under sustained load is greatly reduced, typically to about one-quarter of the loss in stress-relieved strand.

Related: Relaxation, Initial prestress
Seven-wire strand

The standard prestressing strand configuration of six outer wires helically wrapped around a central king wire, giving a nominal area and diameter used in design tables.

Related: Prestressing strand, Anchorage wedge
Prestressing wire

A single drawn high-strength steel element, smaller in diameter than strand, used individually or grouped in anchorage systems for post-tensioning and for some pretensioned products.

Related: Prestressing strand, Button head
High-strength prestressing bar

A straight, hot-rolled, quenched and tempered steel bar with threads or upset ends, used for post-tensioning where a stiff, high-capacity tendon and threaded anchorage are wanted.

Related: Coupler, Post-tensioning tendon
Anchorage wedge

A tapered, hardened steel piece with serrated inner bore that grips the strand and seats in a conical hole in the anchor head, transferring tendon force into the concrete.

Related: Anchor head, Seating loss
Anchor head

A block, usually steel, with conical holes that receive wedges and bear against a bearing plate, distributing post-tensioning tendon force into the concrete member.

Related: Anchorage wedge, Bearing plate
Button head

An enlarged, formed end on a prestressing wire that bears against an anchor plate, used in wire tendon systems instead of wedges for gripping.

Related: Prestressing wire, Anchor head
Coupler

A threaded connector joining two lengths of high-strength prestressing bar end to end so that force can be transmitted continuously through the splice.

Related: High-strength prestressing bar, Post-tensioning tendon
Post-tensioning tendon

A complete assembly of prestressing steel, anchorage, and sheathing or duct that is stressed after the concrete has hardened and then usually grouted or left unbonded.

Related: Duct, Grout
Pretensioning

A method in which prestressing steel is tensioned against the casting bed before concrete is placed, and the force is transferred to the concrete by bond when the strands are released.

Related: Transfer length, Strand release
Bonded tendon

A post-tensioning tendon whose duct is filled with cementitious grout after stressing, so that prestressing steel and concrete act together through bond.

Related: Grout, Duct
Unbonded tendon

A post-tensioning tendon coated with corrosion-protective grease or wax and encased in a plastic sheath, so it can move relative to the concrete and is not bonded to it.

Related: Bonded tendon, Sheathing
Duct

A metal or plastic tube cast into concrete to form a void that houses a post-tensioning tendon and, in bonded systems, later receives cementitious grout.

Related: Bonded tendon, Grout
Sheathing

The plastic or coated covering around an unbonded tendon that contains corrosion-protective grease and prevents bond between steel and surrounding concrete.

Related: Unbonded tendon, Post-tensioning tendon
Grout

A cementitious mixture placed into a duct after stressing to protect the steel from corrosion and to bond tendon and concrete together in a bonded system.

Related: Bonded tendon, Duct
Relaxation

The gradual loss of stress in a prestressing steel held at constant length over time, caused by creep of the steel itself and influenced by initial stress and temperature.

Related: Low-relaxation strand, Initial prestress
Initial prestress

The stress in the prestressing steel immediately after transfer or after stressing and seating, before time-dependent losses such as shrinkage, creep, and relaxation occur.

Related: Effective prestress, Seating loss
Effective prestress

The stress remaining in the prestressing steel after all losses have occurred, used in service-load design checks for stresses, camber, and deflection.

Related: Initial prestress, Prestress loss
Prestress loss

The reduction of prestressing force over time from elastic shortening, concrete shrinkage, concrete creep, steel relaxation, anchorage seating, and friction in post-tensioning.

Related: Effective prestress, Elastic shortening
Elastic shortening

Immediate loss of prestress caused by the concrete compressing elastically when the prestressing force is applied, reducing the steel strain and therefore its stress.

Related: Prestress loss, Transfer
Seating loss

Immediate loss of tendon force in post-tensioning as the wedges or anchorage settle into place when the jack is released, allowing a small inward movement of the strand.

Related: Anchorage wedge, Initial prestress
Transfer

The act of releasing pretensioned strands from the bed so their force is delivered to the hardened concrete through bond, usually done when concrete strength is sufficient.

Related: Transfer length, Strand release
Transfer length

The distance from the end of a pretensioned member over which the prestressing force is gradually transferred from steel to concrete by bond.

Related: Transfer, Development length
Development length

The length over which prestressing steel must be bonded to concrete to develop its design stress, including transfer length plus the flexural bond length beyond it.

Related: Transfer length, Bonded tendon
Strand release

The controlled operation of cutting or detensioning pretensioned strands, performed in a sequence that avoids shock, imbalance, or cracking of the concrete member.

Related: Transfer, Transfer length
Concrete creep

Time-dependent deformation of concrete under sustained compressive stress, which shortens the member and reduces the stretch and stress in the prestressing steel.

Related: Prestress loss, Shrinkage of concrete
Shrinkage of concrete

Volume reduction of concrete as it dries and cures, which shortens a prestressed member and causes a loss of prestress in bonded systems.

Related: Concrete creep, Prestress loss
Camber

The upward deflection built into or resulting from a prestressed member, produced by eccentric prestressing force and partly offset over time by creep and applied loads.

Related: Eccentricity of prestress, Effective prestress
Eccentricity of prestress

The distance between the centroid of the prestressing steel and the centroid of the concrete section, which controls the bending moment and camber produced by the prestress.

Related: Camber, Initial prestress
Jacking force

The temporary force applied by a hydraulic jack to a tendon during stressing, measured by calibrated gauge or load cell and corrected for friction and seating.

Related: Elongation measurement, Seating loss
Elongation measurement

Field measurement of tendon stretch during stressing, compared with calculated elongation to verify that the intended force has been developed and friction assumptions are correct.

Related: Jacking force, Wobble friction
Wobble friction

Friction loss in a post-tensioning tendon caused by unintended small angular deviations along its length, growing with distance from the jacking end.

Related: Curvature friction, Elongation measurement
Curvature friction

Friction loss in a post-tensioning tendon caused by its intended curvature, proportional to the total angle change between jacking end and the point considered.

Related: Wobble friction, Jacking force
Concrete cover

The least distance from the surface of prestressing steel or duct to the concrete surface, specified to protect steel from corrosion and to provide fire resistance.

Related: Duct, Chloride content
Chloride content

The amount of chloride ion in concrete, limited by code because high levels promote corrosion of embedded steel, particularly in prestressed members where it is restricted severely.

Related: Concrete cover, Grout
Steam curing

Accelerated curing in which cast members are held in a moist steam environment under a controlled temperature cycle to speed strength gain before strand release.

Related: Strand release, Transfer
Formwork and bed

The rigid casting surfaces and long stressing bed that hold pretensioned strand at tension and shape the concrete until it hardens sufficiently for release.

Related: Pretensioning, Strand release
Prestressed concrete pile

A factory-produced, prestressed concrete foundation element that must be lifted, stored, transported, and driven without overstressing it at any handling stage.

Related: Lifting point, Camber
Lifting point

A designated location on a prestressed member where it may be picked up, chosen so that handling stresses and camber remain within design limits.

Related: Prestressed concrete pile, Camber